PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND

COMMISSIONING (EPCC) OF GAS DEHYDRATION PLANT AND DRY GAS PIPELINE FOR
PETRONAS CARIGALI IRAQ HOLDING B.V
INSPECTION TEST RECORD
Inspection Checklist for Welding QC-PL-0006
Project No. PCIHBV/2016/P&E/1469 Location/Facilities
Information
System ITP No.
Sub System RFI No.
Ref. Drawing No. Record No.
Inspection Date
INSPECTION / TEST
Inspection Conclusion
NO. Activity Remark
Ok N/A PL No
Electrodes, wire or shielded gas used in the pipeline welding shall be
maintained and used in accordance with the manufacturer
1
instructions.

2 All the welding equipment are used under good and safe conditions.
3 Electrodes baked for two times shall not be used in the site welding.
4 All the welders shall have the qualified welding certificates and
appearance in accordance with the approved welding procedures.

Internal line up clamp shall be removed after the first root pass
finished; Outer line up clamp shall be removed after 50% of root
5
pass completed.

6 It shall not be welded without protective measure in bad weather


conditions.

7 The completed weld shall be marked as per the specifications and


the marked position and content shall be as per the specifications.

8 The repair welding shall be performed as per the specifications. The


welder shall be qualified.

COMMENT(S) AND ADDITIONAL INFORMATION

COMPLETED BY VERIFIED BY ACCEPTED BY

Designation SCOP-PEG TPI PCIHBV

Name

Signature

Date

Page 1 of 1