KNPC ZOR Project

Precast Installation Checklist


P055BZOR-0051-Q-411
Rev.: O, 09-Aug-16

Tag No: Tag Description:


TOS No: TOS Description:
CWP: PO No.:
ITP Ref. No.: Subcontractor:
Insp. Request No.: Drawing Ref.:

Inspection Result
Description of Activities Remarks
Accept Reject N/A

1 Excavation completed as per IFC drawing        

2 Compaction done as per specification      

3  Blinding completed as per specification        

Placement of Plasticized Vapour barrier


4
completed
Placement of pre-cast checked for
5
coordinates and elevation
Check the bitumen coating from damage (If
6
applicable)

7 Check backfilling is to specification

Note:

Description Subcontractor Contractor Company

Name

Signature

Date

Page 1 of 1