CONCRETE PLACEMENT

INSPECTION CHECK LIST

Project.: Description.:
Task Order No.: Location.:
Contractor: Report No.:
Specification.: Inspection Req No.:
Drawing Ref.: Date.:

Inspection Result
Description of Activities
Remarks
Accept Reject N/A

Verify concrete complies with approved


1        
design mix

2 Check all field tests have been carried out        

3 Check concrete is not re-tempered        

Check vibration has been carried out


4        
properly.
Check preparation of surface has been
5        
carried out properly
Check the placement and free drop conforms
6        
with specifications
Check the formed surface have been finished
7        
as per specification

           

REMARK

Description Sub KTR QC Rep. Prime KTR QC Rep Client


Name
Signature
Date