Parklinks North Tower

Inspection & Test Plan FORM NO.: F-PQP-QP02-03

INTERIOR PAINTING
By: UNITED PAINTS, INC.

Document Review
Activity Company Name Title Signature Date
Prepared by UPI Aieocellis Tan Technical Representative
Recommended by MDC Nenith Bagayawa Project Superintendent
Approved by MDC Jesus Dela Pena Project In-Charge
Validated by MDC Walter Rosal / Christian Tepace QAQC Officer/ QAQC Supervisor

Makati Development Corporation ITP DIVISION NO. Rev.


Interior Painting Page 1 of 3 W P - I T P - D I V 0 9 - 0 1 A
Revision: May 2020
Parklinks North Tower
Inspection & Test Plan FORM NO.: F-PQP-QP02-03

RECORDS / TESTED / INSPECTED / REVIEWED BY


CHECK POINT TEST / INSPECTION REFERENCE FREQUENCY DOCUMENTS
SPECIFICATIONS REQUIRED SUBCON FE/FA QAQCE
1. WORK ACTIVITY SUBMITTALS
1.1 Pre-Construction - Method Statement Check - Project Specification per type of work Approved Method X X/R R
- Plans general note Statement
- Contract Agreement
- Codes and applicable
regulatory

1.2 Pre-Construction - Shop Drawing Check Contracts 100% IFC/FCD X/R X/R R
1.3 Pre-Construction - Materials
Sanding paper, Brush & Rollers

Skimcoat

- 100%
Visual Inspection Approved Materials - As per required by RFA - Materials X R R
specs

Nalcrete primer

Visual Inspection Approved Materials Per delivery RFA - Materials X R R

Nalcrete Topcoat

Visual Inspection Approved Materials Per delivery RFA - Materials X R R

Makati Development Corporation ITP DIVISION NO. Rev.


Interior Painting Page 2 of 3 W P - I T P - D I V 0 9 - 0 1 A

2. WORK IN-PROGRESS
Parklinks North Tower
Inspection & Test Plan FORM NO.: F-PQP-QP02-03

2.1 Materials Delivery


Approved product
Visual Inspection Approved TDS Per delivery data sheets, X R/I R/I
Manufactures test
Certificates

Application of Skimcoat Visual Inspection Approved TDS; As per Each Work WAP/ WIR X W R/I
Specs

Application of Primer Visual Inspection Approved TDS; As per Each Work WAP/ WIR X W R/I
Specs

Application of Top Coat Visual Inspection Approved TDS; As per Each Work WAP/ WIR X W R/I
Specs

2.2 Survey Visual Inspection As per specs Per area WAP/WIR X R/I R

3. WORK ACTIVITY COMPLETION


3.1 Post-Construction Inspection Visual Approved shodrawings, Every work location Punchlist Form X R/W R/W
3.2 Handover Inspection/Visual FCD, IFC,
Approved Specs.
shodrawings, Every work location Handover Form X R/W R/W
3.3 As-Built Survey N/A FCD, IFC,
N/ASpecs. N/A N/A

Legends: X – Initiate W – Witness R – Review H - Hold Point


Makati Development Corporation ITP DIVISION NO. Rev.
Interior Painting Page 3 of 3 W P - I T P - D I V 0 9 - 0 1 A
Revision: May 2018