Activity Company Name Title Signature Date
Reviewed by MDC Edgardo Amigo Jr QAQC Supervisor/ Officer 12-21-2021
Reviewed by MDC Mary Jane Carreon Project Trade Supvr/ Supt
01/18/22
Recommended by MDC Project In-Charge
Approved by MDC Rufino Malonjao III Project Manager
2. WORK IN-PROGRESS
2.1 Reinforcement Bar
• Work Activity Permit
Project specification/ • Prior to formworks
2.1.1 Work Activity Permit • Visual • Approved RFA X X/R H
Approved Submittal installation
Submittal
• Inspection Request/
Pre-Concreting
Project specification/
2.1.2 Inspection - Covering Rebar • Visual • Per pour Checklist X X/R H
Approved Shop Drawing
• Approved Shop
Drawing
2.2 Formworks
Approved Submittal/ Shop • Approved Shop
2.2.1 Layout and Design Setting Review Shop Drawing • Per area/scope X X/R H
Drawing Drawing
Project specification/ • Prior to schedule of
2.2.2 Work Activity Permit • Visual • Work Activity Permit X X/R H
Approved Submittal pouring
• Inspection Request/
Project specification/
2.1.2 Inspection - Covering Formworks • Visual • Per pour Pre-Concreting X X/R H
Approved Shop Drawing
Checklist
2.3 Concrete Works
Project specification/ • Prior to schedule of
2.3.1 Work Activity Permit • Visual • Work Activity Permit X X/R H
Approved Submittal pouring
• Inspection Request/
Project specification/ • Prior to schedule of
2.1.2 Inspection Checklist - Concrete • Visual Pre-Concreting X X/R H
Approved Shop Drawing pouring
Checklist