Professional Documents
Culture Documents
SIGN
DATE
SAMSUNG ENGINEERING CO., LTD
POSCO E&C
B 06-MAR-2021 FOR APPROVAL S.O.PARK S.H.HWANG
VIET NAM
POSCO E&C
A 28-JAN-2021 FOR APPROVAL S.O.PARK S.H.HWANG
VIET NAM
REV DATE DESCRIPTION PREPARED CHECKED APPROVED
2 MATERIAL
-ASTM / AWS -P.O
Review of materials Chemical analysis, Mechanical Properties Material
2.1 NRF-137-PEMEX-2012 - ASTM M R R R
certificate certificate
- AWS
Positive material
Procedure No. ASTM / ASME / AWS
2.2 identification Cr, Ni.. Record M W S R
J10276-REQ-008
(Alloy only)
INSPECTION & TEST PLAN
(Page | 2)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT
Visual, Dimensional
PO and MPS Material certificate, Material receiving
2.3 Inspection & Material Dimension, Thickness, Visual M W S R
ASTM A6. report
Identification
3 FIT-UP
4 WELDING
Procedure No.
FINAL VI & DI and
5 TRIAL ASSEMBLY Applicable drawing Overall dimesion R2B-P2-207-03-H- Record M W W S
PRT-49011
6 NDE
RT report
6.1 RT (If Required) Procedure No. M R S/R R
AWS D1.1
MT/or PT report
6.2 MT /or PT R2B-P2-207-03-H- M W S/R R
R2B-P2-207-03-H-
PND-49018
PND-49018 UT Report
6.3 UT (If Required) M W S/R R
7 PAINTING M W W R
W
7.1 Surface Preparation M W R
Painting W
7.2 Surface Profile Testing -R2B-P2-207-03-H- M W R
Inspection Report
Surface Cleanliness PRT-49013 W
7.3 -SSPC M W R
(after Blasting)
ISO 8501-1 W
Air Temperature &
7.4 ISO 12944 M W R
Humidity Check
-R2B-P2-207-03-H-
Metal Surface Painting W
7.5 PRT-49013 M W R
Temperature Check Inspection Report
W
7.6 Paint Application M W R
INSPECTION & TEST PLAN
(Page | 4)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT
Review of material
8.1 ASTM ASTM - M W W S
certificate
Anchor Inspection &
Test (Welding, Anchor bending
8.2 Location, Spacing, test report M W W S
Bend test, PMI, APQ APQ test record
test) R2B-P2-207-03-H-PRT- R2B-P2-207-03-H-PRT-
Prequalification Tests 49025 49025
for Refractory
8.3 - M W W S
Installation
9 PACKING
2 MATERIAL
Positive Material
Procedure No. ASTM / ASME / AWS
2.2 Identification (If Cr, Ni.. PMI Report M W S R
J10276-REQ-008
Required)
Visual, Dimensional
Material certificate,
2.3 Inspection & Material ASTM / ASME / AWS - M W S R
drawing
Identification
INSPECTION & TEST PLAN
(Page | 7)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT
3 FIT-UP
Marking, Cutting, Fit-up R2B-P2-207-03-H- ASME B31.3,
3.1 - M W S N
and alignment PRT-49012 ASME Section I
Adherence to WPS / R2B-P2-207-03-H-
PQR/WPQ. PSL-49015/ R2B-P2-207-03-H-
3.2 - M W S N
Consumable Control R2B-P2-207-03-H- PSL-49015
Control during Welding. PRT-49023
Bevelled end to be R2B-P2-207-03-H-
3.3 DWG - M W S N
welded PSL-49016
4 WELDING
8 NDE
- RT 10% of 100% apply
for carbon steel.
- RT 100% of 100%
apply for center welding
joints (CW) of carbon
8.1 steel. RT report M R R R
- RT 100% of 100%
(after PWHT) apply for
alloy steel and thickness
less than and equal R2B-P2-207-03-H-
R2B-P2-207-03-H- PND-49018
13mm .
PND-49018
PAUT 100% (after
PWHT) only apply alloy
8.2 PAUT report M W R R
steel for thickness over
13mm.
MT or PT 100% of 100%
8.3 MT/PT report M W S/R R
apply for carbon steel.
PT or MT 100% of 100%
8.4 (after PWHT) apply for PT/MT Report M W S/R R
alloy steel.
HARDNESS TEST
10
(after PWHT)
Hardness test carry out
Hardness test
one location per each of R2B-P2-207-03-H-
10.1 Report M W S R
weld joint and each PRT-49019
location will check three
INSPECTION & TEST PLAN
(Page | 9)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT
11 HYDROSTATIC TEST
R2B-P2-207-03-H-
R2B-P2-207-03-H- Hydrostatic test
11.1 Hydrostatic test PRT-49021 H W W R
PRT-49021 Report
R2B-P2-207-03-H-
R2B-P2-207-03-H-
11.2 Water drain and dry PRT-49021 M W W R
PRT-49021
ASME Stamp (If
12 applicable)
Verify nameplate
Manufacturing
installation and ASME
12.1 ASME Section I ASME Section I Data Record M W W R
Stamp (If applicable)
(MDR)
PACKING
13
INSPECTION
MANIFOLD -
RADIANT COIL " BA-71001-A -
MANIFOLD
YES ● ● ●
MANIFOLD -
RADIANT COIL " BA-71001-A -
FLANGE
YES ● ● ● ●
RADIANT COIL " BA-71001-A - COIL -WELDOLET YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71001-A -
WELDOLET
YES ● ● ●
RADIANT COIL " BA-71001-A - COIL-COIL YES ● ● ● ●
TEMPORARY
ATTACHMENT
RADIANT COIL " BA-71001-A -
/ARC STRIKE ●
REMOVED AREA
Page 1 of 2
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : CHARGE HEATER
TEMPORARY
CONVECTION COIL " BA-71001A/B
LSG & USG & ATTACHMENT
-
●
BFW /ARC STRIKE
REMOVED AREA
Page 2 of 2
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : INTER HEATER
MANIFOLD -
RADIANT COIL " BA-71002-A -
MANIFOLD
YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71002-A -
FLANGE
YES ● ● ● ●
RADIANT COIL " BA-71002-A - COIL -WELDOLET YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71002-A -
WELDOLET
YES ● ● ●
RADIANT COIL " BA-71002-A - COIL-COIL YES ● ● ● ●
TEMPORARY
RADIANT COIL " BA-71002-A -
ATTACHMENT
-
●
/ARC STRIKE
REMOVED AREA
Page 1 of 3
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : INTER HEATER
Page 2 of 3
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : INTER HEATER
BA-
CONVECTION LSG & USG & COIL(PIPE) -
COIL
" 71002A&B
&71003
BFW WELDOLET
NO ● ●
BA-
CONVECTION LSG & USG & MANIFOLD -
COIL
" 71002A&B
&71003
BFW WELDOLET
NO ●
CONVECTION
BA-
LSG & USG & COIL(PIPE)- ●
COIL
" 71002A&B
&71003
BFW COIL(ELBOW)
NO ●
TEMPORARY
BA-
CONVECTION LSG & USG & ATTACHMENT
COIL
" 71002A&B
&71003
BFW /ARC STRIKE
NO ●
REMOVED AREA
BA- MANIFOLD-
CONVECTION
COIL
" 71002A&B
&71003
SSH FLANGE/REDUCER
/CAP
YES ● ● ● ●
BA-
CONVECTION COIL(PIPE) -
COIL
" 71002A&B
&71003
SSH
WELDOLET
YES ● ● ● ●
BA-
CONVECTION MANIFOLD -
COIL
" 71002A&B
&71003
SSH
WELDOLET
YES ● ● ●
BA-
CONVECTION COIL(PIPE)-
COIL
" 71002A&B
&71003
SSH
COIL(ELBOW)
YES ● ● ● ●
TEMPORARY
BA-
CONVECTION ATTACHMENT
COIL
" 71002A&B
&71003
SSH
/ARC STRIKE
- ●
REMOVED AREA
Page 3 of 3