You are on page 1of 16

DOCUMENT TITLE : INSPECTION AND TEST PLAN WITH NDT

PLAN FOR HEATER FABRICATION

PTI-ID V/P NO : R2B-P2-207-03-H-PPI-49009


SECL V/P NO : S06625-MBA719-01-J1ITP001-001
REQUISITION NO : MBA719 / 2B-207-1-1-H-RQ-0005
PURCHASE ORDER NO : PTI-ID-PROC-49-2020
ITEM DESCRIPTION : FIRED HEATER

□ APPROVED □ WITH COMMENT


□ REVIEWED □ RESUBMIT

This approval or review does not relieve the vendor /


subcontractor of his responsibilities to meet all
requirements of the purchase order

ORIGINAL CHECKED APPD(PRJ)

SIGN

DATE
SAMSUNG ENGINEERING CO., LTD

POSCO E&C
B 06-MAR-2021 FOR APPROVAL S.O.PARK S.H.HWANG
VIET NAM
POSCO E&C
A 28-JAN-2021 FOR APPROVAL S.O.PARK S.H.HWANG
VIET NAM
REV DATE DESCRIPTION PREPARED CHECKED APPROVED

Dos Bocas New Refinery Project

PTI-Infraestructura de Desarrollo, S.A. de C.V. (PTI-ID)

SAMSUNG Ingeniería Manzanillo, S.A. de C.V.

JNK Heaters Co., Ltd.


INSPECTION & TEST PLAN
(Page | 1)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

I. INSPECTION AND TEST PLAN FOR NON-PRESSURE PART

1 APPROVAL and PIM H

Welding procedures Code / Job Spec. Approved


1.1 Job Specification WPS&PQR H R R R
(WPS and PQR) document
Welder qualification Code / Job Spec. Approved
1.2 Job Specification WPQ H R R R
(WPQ) document
Inspection procedures Code / Job Spec. Approved
1.3 Job Specification NDE procedure H R R R
and NDE Procedue document
Other related Document Code / Job Spec. Approved
1.4 Job Specification ITP&other procedure H R R R
for Inspection document

1.5 Pre-Inspection Meeting PIM Date H H H W

2 MATERIAL
-ASTM / AWS -P.O
Review of materials Chemical analysis, Mechanical Properties Material
2.1 NRF-137-PEMEX-2012 - ASTM M R R R
certificate certificate
- AWS

Positive material
Procedure No. ASTM / ASME / AWS
2.2 identification Cr, Ni.. Record M W S R
J10276-REQ-008
(Alloy only)
INSPECTION & TEST PLAN
(Page | 2)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

Visual, Dimensional
PO and MPS Material certificate, Material receiving
2.3 Inspection & Material Dimension, Thickness, Visual M W S R
ASTM A6. report
Identification

3 FIT-UP

3.1 Marking, Cutting Applicable drawing Procedure No. M M S N


Job Specification
Gap, Bevel and alifnment R2B-P2-207-03-H- Record
- ET-089-PEMEX-
3.2 Fit-up and alignment 2019 PSL-49016 M M S N

4 WELDING

AWS D1.1 AWS D1.1/WPS


Welder qualification, if
4.1 ET-020-PEMEX- R2B-P2-207-03-H- WQT M W S R
newly qualified
2019 PSL-49016
AWS D1.1,/WPS
Bevelled end to be Drawing R2B-P2-207-03-H-
4.2 - M W S R
welded PSL-49016

Adherence to WPS / Procedure No.


AWS D1.1,/WPS
PQR/WPQ. EURO5-EPC-VDR-
4.3 Ampe, Vol and interpass R2B-P2-207-03-H- - M W S R
Consumable Control 016-21-MEC-DOS-
PSL-49016
Control during Welding. 0030
INSPECTION & TEST PLAN
(Page | 3)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

Procedure No.
FINAL VI & DI and
5 TRIAL ASSEMBLY Applicable drawing Overall dimesion R2B-P2-207-03-H- Record M W W S
PRT-49011

6 NDE
RT report
6.1 RT (If Required) Procedure No. M R S/R R
AWS D1.1
MT/or PT report
6.2 MT /or PT R2B-P2-207-03-H- M W S/R R
R2B-P2-207-03-H-
PND-49018
PND-49018 UT Report
6.3 UT (If Required) M W S/R R

7 PAINTING M W W R
W
7.1 Surface Preparation M W R
Painting W
7.2 Surface Profile Testing -R2B-P2-207-03-H- M W R
Inspection Report
Surface Cleanliness PRT-49013 W
7.3 -SSPC M W R
(after Blasting)
ISO 8501-1 W
Air Temperature &
7.4 ISO 12944 M W R
Humidity Check
-R2B-P2-207-03-H-
Metal Surface Painting W
7.5 PRT-49013 M W R
Temperature Check Inspection Report
W
7.6 Paint Application M W R
INSPECTION & TEST PLAN
(Page | 4)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

Dry Film Thickness


7.7 M W W R
Check
REFRACTORY
8
INSTALLATION

Review of material
8.1 ASTM ASTM - M W W S
certificate
Anchor Inspection &
Test (Welding, Anchor bending
8.2 Location, Spacing, test report M W W S
Bend test, PMI, APQ APQ test record
test) R2B-P2-207-03-H-PRT- R2B-P2-207-03-H-PRT-
Prequalification Tests 49025 49025
for Refractory
8.3 - M W W S
Installation

8.4 Surface preparation - M W W S

One sample castable


Castable test
8.5 test for each item for M W W S
report
Laboratory test
R2B-P2-207-03-H-PRT- R2B-P2-207-03-H-PRT-
Visual and dimensional 49025 49025
8.6 - M W W S
check

Hammering Test for


8.7 - M W W S
sound check
INSPECTION & TEST PLAN
(Page | 5)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

Visual and dimensional


8.8 - M W W S
check after pre dryout
Hammering Test for
8.9 sound check after pre - M W W S
dryout

9 PACKING

Final Marking, stamping


9.1 Procedure: R2B-P2-207-03- Packing list M W W N
quantity check H-PRT-49014
R2B-P2-207-03-H-PRT-
Specification:
49014
Final packing check & R2B-P2-200-02-K-ET- Packing inspection
9.2 00005 M W W N
shipping marks report

9.3 IRC IRC H R


INSPECTION & TEST PLAN
(Page | 6)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

II. INSPECTION AND TEST PLAN FOR PRESSURE PART


1 APPROVAL and PIM
Welding procedures Code / Job Spec. Approved
1.1 Job Specification document H R R R
(WPS and PQR)
Welder qualification Code / Job Spec. Approved
1.2 Job Specification document H R R R
(WPQ)
Inspection procedures Code / Job Spec. Approved
1.3 Job Specification document H R R R
and NDE Procedue
Inspection Plan with Code / Job Spec. Approved
1.4 Job Specification document H R R R
NDE Map
Other related Document Code / Job Spec. Approved
1.5 Job Specification H R R R
for Inspection document
Job Specification/ PIM Date
1.6 Pre-Inspection Meeting Code / Job Spec. H H H W
approved procedure

2 MATERIAL

Review of materials R2B-P2-207-03-H- ASTM / ASME / P.O MTC and Material


2.1 receiving M W S R
certificate PRT-49012
Inspection Report

Positive Material
Procedure No. ASTM / ASME / AWS
2.2 Identification (If Cr, Ni.. PMI Report M W S R
J10276-REQ-008
Required)
Visual, Dimensional
Material certificate,
2.3 Inspection & Material ASTM / ASME / AWS - M W S R
drawing
Identification
INSPECTION & TEST PLAN
(Page | 7)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

3 FIT-UP
Marking, Cutting, Fit-up R2B-P2-207-03-H- ASME B31.3,
3.1 - M W S N
and alignment PRT-49012 ASME Section I
Adherence to WPS / R2B-P2-207-03-H-
PQR/WPQ. PSL-49015/ R2B-P2-207-03-H-
3.2 - M W S N
Consumable Control R2B-P2-207-03-H- PSL-49015
Control during Welding. PRT-49023
Bevelled end to be R2B-P2-207-03-H-
3.3 DWG - M W S N
welded PSL-49016
4 WELDING

4.1 Welder qualification ASME Sec. IX ASME Sec. IX - M W S N

Welding control & R2B-P2-207-03-H- R2B-P2-207-03-H-


4.2 - M W S N
Monitoring PSL-49016 PSL-49016
Final VI & DI check
5
after welding
Final VI & DI check Visual, Dimension
5.1 DWG DWG M W W R
after welding inspection report
6 PMI
Procedure No. ASTM / ASME / AWS
6.1 PMI test on Weldment Cr, Ni.. PMI Report M W S R
J10276-REQ-008
7
PWHT
R2B-P2-207-03-H-
7.1 R2B-P2-207-03-H-
PWHT PWH-49020/ ASME PWHT Report M W S R
PWH-49020
CODE
INSPECTION & TEST PLAN
(Page | 8)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

8 NDE
- RT 10% of 100% apply
for carbon steel.
- RT 100% of 100%
apply for center welding
joints (CW) of carbon
8.1 steel. RT report M R R R
- RT 100% of 100%
(after PWHT) apply for
alloy steel and thickness
less than and equal R2B-P2-207-03-H-
R2B-P2-207-03-H- PND-49018
13mm .
PND-49018
PAUT 100% (after
PWHT) only apply alloy
8.2 PAUT report M W R R
steel for thickness over
13mm.
MT or PT 100% of 100%
8.3 MT/PT report M W S/R R
apply for carbon steel.
PT or MT 100% of 100%
8.4 (after PWHT) apply for PT/MT Report M W S/R R
alloy steel.
HARDNESS TEST
10
(after PWHT)
Hardness test carry out
Hardness test
one location per each of R2B-P2-207-03-H-
10.1 Report M W S R
weld joint and each PRT-49019
location will check three
INSPECTION & TEST PLAN
(Page | 9)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

points (base metal, weld


joint and HAZ)

11 HYDROSTATIC TEST

R2B-P2-207-03-H-
R2B-P2-207-03-H- Hydrostatic test
11.1 Hydrostatic test PRT-49021 H W W R
PRT-49021 Report
R2B-P2-207-03-H-
R2B-P2-207-03-H-
11.2 Water drain and dry PRT-49021 M W W R
PRT-49021
ASME Stamp (If
12 applicable)

Verify nameplate
Manufacturing
installation and ASME
12.1 ASME Section I ASME Section I Data Record M W W R
Stamp (If applicable)
(MDR)

PACKING
13
INSPECTION

Final Marking, stamping


13.1 Procedure: R2B-P2- Packing list H W W R
quantity check
207-03-H-PRT- Procedure: R2B-P2-
49014 207-03-H-PRT-49014
Final packing check & Specification: Specification: Packing
13.2 H W W R
shipping marks R2B-P2-200-02-K- R2B-P2-200-02-K-ET- inspection report
ET-00005 00005
INSPECTION & TEST PLAN
(Page | 10)
H Hold Point M: Monitoring
MANUFACTURER NAME : JNK W Witness Point
PROJECT / ORDER NO: Inspection and Test Plan DOC. NO. :
S Spot Witness
R Review
W;100% Inspection / SW:10% sampling of total quantity
ITEM No.:
ACT QUALITY RELATED REFERENCE CHARACTERISTICS ACCEPTANCE VERIFYING SUB-CONT. JNK SECL PEMEX
No ACTIVITY DOCUMENT TO BE VERIFIED DOCUMENT DOCUMENT

Inspection and Test Record


13.3 Review MDR M W R R

13.4 IRC IRC H H R


PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : CHARGE HEATER

BEFORE PWHT AFTER PWHT


ITEM NAME DRAWING No. HEATER No. Description PWHT
RT PAUT MT PT PMI RT PAUT MT PT HARDNESS

MANIFOLD -
RADIANT COIL " BA-71001-A -
MANIFOLD
YES ● ● ●
MANIFOLD -
RADIANT COIL " BA-71001-A -
FLANGE
YES ● ● ● ●
RADIANT COIL " BA-71001-A - COIL -WELDOLET YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71001-A -
WELDOLET
YES ● ● ●
RADIANT COIL " BA-71001-A - COIL-COIL YES ● ● ● ●
TEMPORARY
ATTACHMENT
RADIANT COIL " BA-71001-A -
/ARC STRIKE ●
REMOVED AREA

RADIANT COIL " BA-71001-A - LUG ● ●


MANIFOLD -
RADIANT COIL " BA-71001-B -
MANIFOLD
YES ● ● ●
MANIFOLD -
RADIANT COIL " BA-71001-B -
FLANGE
YES ● ● ● ●
RADIANT COIL " BA-71001-B - COIL -WELDOLET YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71001-B -
WELDOLET
YES ● ● ●

Page 1 of 2
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : CHARGE HEATER

BEFORE PWHT AFTER PWHT


ITEM NAME DRAWING No. HEATER No. Description PWHT
RT PAUT MT PT PMI RT PAUT MT PT HARDNESS

RADIANT COIL " BA-71001-B - COIL-COIL YES ● ● ● ●


TEMPORARY
RADIANT COIL " BA-71001-B -
ATTACHMENT ●
/ARC STRIKE
REMOVED AREA

RADIANT COIL " BA-71001-B - LUG ● ●


CONVECTION COIL " BA-71001A/B
LSG & USG &
MANIFOLD-
FLANGE/REDUCER NO
● ●
BFW
/CAP

CONVECTION COIL " BA-71001A/B


LSG & USG & COIL(PIPE) -
NO
● ●
BFW WELDOLET

CONVECTION COIL " BA-71001A/B


LSG & USG & MANIFOLD -
NO

BFW WELDOLET

CONVECTION COIL " BA-71001A/B


LSG & USG & COIL(PIPE)-
NO
● ●
BFW COIL(ELBOW)

TEMPORARY
CONVECTION COIL " BA-71001A/B
LSG & USG & ATTACHMENT
-

BFW /ARC STRIKE
REMOVED AREA

Page 2 of 2
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : INTER HEATER

BEFORE PWHT AFTER PWHT


ITEM NAME DRAWING No. HEATER No. Description PWHT
RT PAUT MT PT PMI RT PAUT MT PT HARDNESS

MANIFOLD -
RADIANT COIL " BA-71002-A -
MANIFOLD
YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71002-A -
FLANGE
YES ● ● ● ●
RADIANT COIL " BA-71002-A - COIL -WELDOLET YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71002-A -
WELDOLET
YES ● ● ●
RADIANT COIL " BA-71002-A - COIL-COIL YES ● ● ● ●
TEMPORARY
RADIANT COIL " BA-71002-A -
ATTACHMENT
-

/ARC STRIKE
REMOVED AREA

RADIANT COIL " BA-71002-A - LUG ● ●


MANIFOLD -
RADIANT COIL " BA-71002-B -
MANIFOLD
YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71002-B -
FLANGE
YES ● ● ● ●
RADIANT COIL " BA-71002-B - COIL -WELDOLET YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71002-B -
WELDOLET
YES ● ● ●

Page 1 of 3
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : INTER HEATER

BEFORE PWHT AFTER PWHT


ITEM NAME DRAWING No. HEATER No. Description PWHT
RT PAUT MT PT PMI RT PAUT MT PT HARDNESS

RADIANT COIL " BA-71002-B - COIL-COIL YES ● ● ● ●


TEMPORARY
ATTACHMENT
RADIANT COIL " BA-71002-B -
/ARC STRIKE ●
REMOVED AREA

RADIANT COIL " BA-71002-B - LUG ● ●


MANIFOLD -
RADIANT COIL " BA-71003 -
MANIFOLD
YES ● ● ● ●
MANIFOLD-
RADIANT COIL " BA-71003 - FLANGE/REDUCER
/CAP
YES ● ● ● ●
COIL(PIPE) -
RADIANT COIL " BA-71003 -
WELDOLET
YES ● ● ● ●
MANIFOLD -
RADIANT COIL " BA-71003 -
WELDOLET
YES ● ● ● ●
COIL(PIPE)-
RADIANT COIL " BA-71003 -
COIL(ELBOW)
YES ● ● ● ●
TEMPORARY
ATTACHMENT
RADIANT COIL " BA-71003 -
/ARC STRIKE
- ●
REMOVED AREA

RADIANT COIL " BA-71003 - LUG ● ●


BA- MANIFOLD-
CONVECTION LSG & USG &
COIL
" 71002A&B
&71003
BFW
FLANGE/REDUCER
/CAP
NO ● ●

Page 2 of 3
PROJECT : DOS BOCAS REFINERY PROJECT
TITLE : INTER HEATER

BEFORE PWHT AFTER PWHT


ITEM NAME DRAWING No. HEATER No. Description PWHT
RT PAUT MT PT PMI RT PAUT MT PT HARDNESS

BA-
CONVECTION LSG & USG & COIL(PIPE) -
COIL
" 71002A&B
&71003
BFW WELDOLET
NO ● ●
BA-
CONVECTION LSG & USG & MANIFOLD -
COIL
" 71002A&B
&71003
BFW WELDOLET
NO ●
CONVECTION
BA-
LSG & USG & COIL(PIPE)- ●
COIL
" 71002A&B
&71003
BFW COIL(ELBOW)
NO ●
TEMPORARY
BA-
CONVECTION LSG & USG & ATTACHMENT
COIL
" 71002A&B
&71003
BFW /ARC STRIKE
NO ●
REMOVED AREA

BA- MANIFOLD-
CONVECTION
COIL
" 71002A&B
&71003
SSH FLANGE/REDUCER
/CAP
YES ● ● ● ●
BA-
CONVECTION COIL(PIPE) -
COIL
" 71002A&B
&71003
SSH
WELDOLET
YES ● ● ● ●
BA-
CONVECTION MANIFOLD -
COIL
" 71002A&B
&71003
SSH
WELDOLET
YES ● ● ●
BA-
CONVECTION COIL(PIPE)-
COIL
" 71002A&B
&71003
SSH
COIL(ELBOW)
YES ● ● ● ●
TEMPORARY
BA-
CONVECTION ATTACHMENT
COIL
" 71002A&B
&71003
SSH
/ARC STRIKE
- ●
REMOVED AREA

Page 3 of 3

You might also like