The document is an inspection and test plan for safety relief valves. It outlines 15 activities from reviewing technical documents and inspecting raw materials to final testing and packing for shipment. For each activity, it specifies acceptance criteria, verifying documentation, responsibilities of the manufacturer, client, and third party inspector, and notes. The overall purpose is to ensure the safety relief valves meet standards and are properly inspected and tested at each stage of production.

Uploaded by

jayendrapatil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
474 views2 pages

Safety Relief Valve Inspection Plan

The document is an inspection and test plan for safety relief valves. It outlines 15 activities from reviewing technical documents and inspecting raw materials to final testing and packing for shipment. For each activity, it specifies acceptance criteria, verifying documentation, responsibilities of the manufacturer, client, and third party inspector, and notes. The overall purpose is to ensure the safety relief valves meet standards and are properly inspected and tested at each stage of production.

Uploaded by

jayendrapatil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

logo INSPECTION AND TEST PLAN

N.I.S.O.C
SAFETY RELIEF VALVE PAGE 1 OF 2

Order no.: Client:

Project: Purchaser:

Scope Of Supply: SAFETY RELIEF VALVE Doc no.:

KIASA DOCUMENT STATUS


This Document Shall Be Checked, Stamped And Signed Within 30 Days From Receipt.
If Not, Will Be Considered As "Approved As Issued".
All Comments Received After This Period Could Affect Production Program And Delivery.
CODE A APPROVED DO NOT RESUBMIT WORK MAY PROCEED
FULLY INCORPORATE COMMENTS
CODE B APPROVED AS NOTE
AND RESUBMIT
WORK MAY PROCEED

CODE C FULLY INCORPORATE COMMENTS


NOT APPROVED - REJECT WORK MUST NOT PROCEED
AND RESUBMIT
CODE D RECEIVED FOR INFORMATION ONLY DO NOT RESUBMITE WORK MAY PROCEED

SIGN: DATE:

NOTE:
ABBREVIATION USED IN DOCUMENT:

 R = Review Documentation  SW = Spot Witness


 NDT = Non Destructive Test  TPI = Third Party Inspection
 MFB = Manufacturing Final Book  MR = Manufacturer
 W = Witness point  CL = Client Or User
 HP = Hold Point  AFC = Approved for construction

Rev. Date Description Status Prepared Checked

1
logo INSPECTION AND TEST PLAN
N.I.S.O.C
SAFETY RELIEF VALVE PAGE 2 OF 2

Inspection
Acceptance
Row Activity / Applicability Verifying Doc. MFB Activities Note
Criteria
MR CL TPI
PO/DWG/DATA
Review Of Technical AFC
A SHEET/TEST no H H H
Document
PROCEDURE
Raw Material For
Body , Bonnet:
ASTM STD Certificates
B -Chemical Analyze yes R R R
EN 10204 3.1
-Mechanical Properties
-Heat Treatment
Raw Material For
Nozzle , Disc:
ASTM STD Certificates
C -Chemical Analyze yes R R R
EN 10204 3.1
-Mechanical Properties
-Heat Treatment
Incoming Inspection:
-Visual , dimensional; Quality
D yes H R R
-marking , traceability; records
-review of certificates.
Test
E NDT (if required) ASME yes H R R
Procedure
Machining and
Fabrication Work order
F traceability of no H R R
drawing
components.
G Hydrostatic of body Asme B16.34 Test report yes H R R

Fabrication Work order


H Assembly and marking no H R R
drawing
Factory acceptance
I Api 527 Test report yes H H H
and functional tests

J Seat tightness test Api 527 Test report yes H H H

K Visual and dimensional Data sheet no H W W 10%

Manufacturer
L Painting Certificate yes H R R
Color

M Name plate check Data sheet H R R

Packing and
N preparation of Packing List H SW SW
shipping
Review of certificate
O and Release note for MFB H SW SW
shipping