DOCUMENT TITLE: FACTORY ACCEPTANCE TEST


EMERSON PROJECT# 5113

PROJECT TITLE: CNG Decompression Skid with flow of 300 SCMH

PO NO/PO DATE: Dated: 23/05/2018

LOCATION: BOKARO (JHARKHAND)


CUSTOMER:

G S ALTERNATE ENERGY LLP

SUPPLIER: EMERSON PROCESS MANAGEMENT CHENNAI PVT LTD.


Plot No. 5,6,7&8
Self Help Industrial Estate
Keelkattalai, Chennai – 600 117

REV. EMERSON DOCUMENT NO. SHEET


B0 5113-PROC-002 1 OF 3
Revision Total
Doc. No Description
B0 B1 B2 1 Sheets
5113-PROC-002  1 FRONT SHEET
5113-PROC-002  1 INDEX SHEET
5113-PROC-002  1 FACTORY ACCEPTANCE TEST

REV. EMERSON DOCUMENT NO. SHEET


B0 5113-PROC-002 2 OF 3
Document No.: 5113‐PROC‐002
Factory Acceptance Rev.No.01
Issue Date: 04‐07‐18
Test
Customer Name: M/s. GS Alternate Energy LLP Customer Ref:
Project Name: CNG DECOMPRESSION SKID WITH FLOW OF 300 SCMH Dated :
P & ID No: 5113‐DWG‐01‐0101 Rev.No:B0 Project No: 5113
GAD No: 5113‐DWG‐02‐0101 Rev.No:B0 Inspection Authority: Emerson / TPI / Customer
Skid No:
System Tested: Two Line System Test Date: Test Medium: N2 Gas
The skid was pressurized by Air/Nitrogen from inlet. All below parameters are to be checked with simulated operations.

Sr. Nos. Inspection Checked Remark


1 Test Pressure BAR(g)
1.1 Inlet Pressure 40 - 250
1.2 Outlet Pressure Stage 1 16
1.3 Outlet Pressure Stage 2 4-8
2 ESV 1" 2500# ON-OFF check

3 Regulator 3/4" 2500# BAR(g)

3.1 Set Pressure

3.2 Actual Test

Regulator with SSV 1"


4 BAR(g)
150# NZOS
STREAM 1
4.1 Set Pressure

4.2 Actual Test

4.3 Set Pressure for SSV

4.4 Actual Test for SSV

5 ESV 1" 2500# ON-OFF check

6 Regulator 3/4" 2500# BAR(g)

6.1 Set Pressure

6.2 Actual Test

Regulator with SSV 1"


7 BAR(g) STREAM 2
150# NZOS

7.1 Set Pressure

7.2 Actual Test

7.3 Set Pressure for SSV

7.4 Actual Test for SSV

8 Check as per P&ID & GAD

9
Visual Check
10 Passing of Isolation Valves

11 Soap solution test on all flanged & tube connections.

12 Final Acceptance