INSPECTION AND TEST REPORT Project No.

: 177214
FOR
CURRENT TRANSFORMER
Date : 10/12/18 Rev No.:
Project PLTU BATANG 2 x 1000 MW CENTRAL JAVA PROJECT
Subcontractor PT. BLACK & VEACTH
Location GIS 500 kV
Inspected item Current Transformer

BAY / FEEDER DIAMETER #1 ( =B1.1 - CT-T6 )

1. Name plate data

Manufacturer ABB Manufacturer type LMGBT-550


Insulation Level 550 / 740 / 1675 kV Frequency 50 Hz
Short-time Thermal Current 63 kA/3s Rated Dynamic Current 4000 A
Standard IEC 61869-2:2012 Manufacturer year Jun-17

2. Equipment Required

Test Equipment Serial number


OmicronCT ANALYZER JH 543 E
Insulation Resistance Test 101290074

3. General Inspection
PHASE R PHASES PHASE T
Visual inspection, compliance with drawings and related doc. OK OK OK
Nameplate ratings, HV & LV terminal markings OK OK OK
Connections tightening, cables marking OK OK OK
Orientation of primary side (PI & P2) complied with drawings OK OK OK
Grounding system OK OK OK

Prepared by: Witnessed / Review by: Reviewed / Approved by:


BVI SC BPI BVI ( SU Engineer)

Name:
Date:
Muhamad Chandra
Vb - [1- '7sOi3
Name : IjUfK fitNAUMN
Date: 1*1 U -i8
Name:
Date:
Name :
Date: fggi
=?
INSPECTION AND TEST REPORT Project No.: 177214
FOR
CURRENT TRANSFORMER
Date : 10/12/18 Rev No.:
4. Insulation Resistance

Secondary Applied Voltage : 1000 VDC > 1 GO


Terminals Temp Dura­
PHASE R PHASE S PHASE T
Tested Grounded Guard (°C) tion
30 sec 2.69 GO 2.71 GO 3.63 GO
Core 1 Earth Core 2 to Core 4 32 60 sec 2.83 GO 2.79 GO 3.77 GO
DAR 1.05 1.03 1.04
30 sec 3.07 GO 2.92 GO 3.64 GO
Core 1, Core 3 to
Core 2 Earth 32 60 sec 3.13 GO 3.00 GO 3.72 GO
Core 4
DAR 1.02 1.03 1.02
30 sec 3.17 GO 3.08 GO 3.81 GO
Core 1 to Core 2,
Core 3 Earth
Core 4
32 60 sec 3.12 GO 3.14 GO 3.86 GO
DAR 0.98 1.02 1.01
30 sec 2.65 GO 2.76 GO 3.33 GO
Core 4 Earth Core 1 to Core 3 32 60 sec 2.75 GO 2.78 GO 3.37 GO
DAR 1.04 1.01 1.01

30 sec 5.54 GO 5.37 GO 6.40 GO


Core 3, Core 4,
Core 1 Core 2
Earth
32 60 sec 5.71 GO 5.56 GO 6.59 GO
DAR 1.03 1.04 1.03
30 sec 5.80 GO 5.26 GO 6.39 GO
Core 1, Core 4,
Core 2 Core 3
Earth
32 60 sec 5.77 GO 5.31 GO 6.41 GO
DAR 0.99 1.01 1.00
30 sec 5.46 GO 4.79 GO 5.75 GO
Core 1 to Core 2,
Core 3 Core 4
Earth
32 60 sec 5.43 GO 4.80 GO 5.82 GO
DAR 0.99 1.00 1.01
30 sec 6.70 GO 5.80 GO 7.62 GO
Core 2, Core 3,
Core 4 Core 1 32 60 sec 6.90 GO 5.89 GO 7.80 GO
Earth
DAR 1.03 1.02 1.02
30 sec 6.70 GO 6.29 GO 7.65 GO
Core 2, Core 4,
Core 1 Core 3 32 60 sec 6.96 GO 6.39 GO 8.05 GO
Earth
DAR 1.04 1.02 1.05
30 sec 6.91 GO 5.91 GO 7.31 GO
Core 1, Core 3,
Core 2 Core 4 32 60 sec 6.94 GO 6.01 GO 7.43 GO
Earth
DAR 1.00 1.02 1.02

Prepared by: Witnessed / Review by: Reviewed / Approved by:


BVI SC BPI BVI (SU Engineer)

Name :
Date:
Muhamad Chandra
-l
Name:
Date:
^ frTP(Au)A*J
[•r-a/8
Name:
Date:
Name:
Date : mx
fonda Pallea