: 177214
FOR
CURRENT TRANSFORMER
Date : 10/12/18 Rev No.:
Project PLTU BATANG 2 x 1000 MW CENTRAL JAVA PROJECT
Subcontractor PT. BLACK & VEACTH
Location GIS 500 kV
Inspected item Current Transformer
2. Equipment Required
3. General Inspection
PHASE R PHASES PHASE T
Visual inspection, compliance with drawings and related doc. OK OK OK
Nameplate ratings, HV & LV terminal markings OK OK OK
Connections tightening, cables marking OK OK OK
Orientation of primary side (PI & P2) complied with drawings OK OK OK
Grounding system OK OK OK
Name:
Date:
Muhamad Chandra
Vb - [1- '7sOi3
Name : IjUfK fitNAUMN
Date: 1*1 U -i8
Name:
Date:
Name :
Date: fggi
=?
INSPECTION AND TEST REPORT Project No.: 177214
FOR
CURRENT TRANSFORMER
Date : 10/12/18 Rev No.:
4. Insulation Resistance
Name :
Date:
Muhamad Chandra
-l
Name:
Date:
^ frTP(Au)A*J
[•r-a/8
Name:
Date:
Name:
Date : mx
fonda Pallea