Project: EPC for Upgrade of Power, Control and monitoring systems
in SE Project
Contractor: Sub Station: CLUSTER 3 - 16-20-PSS-2103 Manufacture:
Ref.ID P16105-16-20-97-9634,38&52 Panel Type 3.3/0.415 kV SWGR PANEL Bay Ref: MV and LV SWGR Date: 29.04.2023 Page 1 of 2
BUS BAR INSULATION RESISTANCE AND CONTACT RESISTANCE TEST
1. GENERAL CHECKS:
Sl. No. Description Remarks
1 Check for correct Installation of Bus bars Ok 2 Check for any physical damage of supporting insulators Ok 3 Identification of labels for all phases in bus bar Ok 4 Bus bar Rating as per the Approved drawings Ok 5 Earthing of cubicle to be checked Ok 6 Check for any Painting scratches & Cleanliness of Switchgear Ok 7 Check tightness of all bolted connections Ok
2. INSULATION RESISTANCE CHECK
i. 3.3KV SWGR
Injected volt: 5kV Duration: 1 minutes
Measured (Ω) Phase (3-1) to (3-2) (7-1), (7-2) to (7-3) R – E+Y+B 1.70 TΩ 31.4 GΩ Y – E+R+B 1.69 GΩ 1.21 GΩ B – E+R+Y >5.12 TΩ 6.07 GΩ
ii. 0.415KV SWGR
Injected volt: 1kV Duration: 1 minutes
Phase Measured (Ω) R – E+Y+B+N 39.2 GΩ Y – E+R+B+N 37.0 GΩ B – E+R+Y+N 27.8 GΩ N – E+R+Y+B 50.7 GΩ
Tested by Witnessed by Approved by
SIGNATURE NAME: SOORAJ VIMAL PANDYA DATE: 29.04.2023 29.04.2023 COMPANY Schneider Sicon Oil & Gas ADNOC Project ADNOC Operation Client: Site Acceptance Test Report for Bus Bar Contract No:
Project: EPC for Upgrade of Power, Control and monitoring systems
in SE Project
Contractor: Sub Station: CLUSTER 3 - 16-20-PSS-2103 Manufacture:
Ref.ID P16105-16-20-97-9634,38&52 Panel Type 3.3/0.415 kV SWGR PANEL Bay Ref: MV and LV SWGR Date: 29.04.2023 Page 2 of 2
3. CONTACT RESISTANCE CHECK
[Injected Current: 100ADC]
Measured Contact Resistance value in µΩ Feeder Sl. No. Remarks Reference R - Phase Y - Phase B - Phase N - Phase
1 MV (3-1 to 3-2) 127.7 137.3 120.9 - OK
2 MV Earth (3) 70.41 OK 3 MV (7-1 to 7-2) 163.7 165.6 155.2 - OK 4 MV (7-2 to 7-3) 164.8 167.0 154.2 - OK 5 MV Earth (7) 63.31 OK 6 LV SWGR 152.6 149.2 143.4 151.8 OK 7 LV Earth 122.3 OK