Contract No: 4400005948 Contractor: NCC

AVR (ZIV) FAINAL SETTING TEST REPORT Client: National Grid SA

DIE 4B 115/13.8kV SS Sheet : Page 1 of 5


Panel No :RTCC.1 (SN-132777) CONTROL ROOM

1. GENERAL DATA AND INFORMATION:

a. RELAY DATA:

Sl. No. Description Remarks


1. Relay Manufacturer ZIV
2. Relay Type. RTV
3. Rated Voltage Aux. 48-250 Vac/Vdc (+ 20%)
4. Rated Voltage I/O. 125VDC
5. Relay Name AUTO VOLT. REGULATOR (90)
6. Communication Cable for Zivercomplus. RS232 (CROSS) OR USB
7. Communication Protocol Virtual I/O (Badu rate 38400)
8. IEC 61850 ports. LAN1, LAN2
9. Remote ports. P1, P2
10. CT Sec inputs. 1/5 A
11. VT Sec inputs. 50-230V AC
12. Power supply burden. 7W, max.: <20W
13. Frequency. 16-81Hz

b. FIELD DATA:

Sl. No. Description Remarks


1. CT Ratio. 2803/1 A
2. VT Ratio. 13.8 kV/√3:115 V/√3

2. MECHANICAL AND VISUAL INSPECTION CHECKLIST:

Sl. No. Description Remarks


1. Inspect for physical damage / defects. OK
2. Inspect for equipment earth connection. OK
3. Check tightness of all connections. OK

3. ELECTRICAL TESTS CHECKLIST:

Sl. No. Description Remarks


1. Verify the DC Source and Loop. OK
2. Test switch / plug checked for correct function. OK
3. Verify connections as per approved drawings. OK
4. Verify all back indication as per scheme. OK
5. Set the Clock as per the reference. OK

TESTING ENGINEER CSD- Engineer


Signature: ________________ Signature: ________________
Name : VINODE KUMAR (XER-062) Name : ZULQARNAIN MUSHTAQ
Contract No: 4400005948 Contractor: NCC

AVR (ZIV) FAINAL SETTING TEST REPORT Client: National Grid SA

DIE 4B 115/13.8kV SS Sheet : Page 2 of 5


Panel No :RTCC.1 (SN-132777) CONTROL ROOM

4. MEASUREMENT CHECK:

4.1 VOLTAGE MEASUREMENT:

Sl.No Voltage Magnitude Voltage Magnitude


Expected Voltage (KV) REMARKS
. set (V) Measured (KV)
1. 100 11.5 11.482 OK
2. 120 13.8 13.778 OK
3. 140 16.1 16.074 OK
Accuracy: ±0.1% or ±50 mV (the greater)

4.2 CURRENT MEASUREMENT:

INOMINAL: 1 A

Current Magnitude INJ Expected Current Current Magnitude


Sl.No. (A) REMARKS
(A) Measured (A)
1. 0.25 700.25 697.3 OK
2. 0.5 1401.5 1.393k OK
3. 1 2803 2.792k OK
Accuracy: ±0.1% or ±2 mA (the greater)

4.3 PHASE ANGLE MEASUREMENT:

Sl.No INJECTED Voltage Injected Expected Expected Phase


REMARKS
. (V) Current (A) Phase angle angle

1. 115 1.00 210◦ 210.2◦ OK


Voltage-R-Y(0-240)
Current-Y (240)
5. INPUT VERIFICATION CHECKLIST:

Input Description Hardware Channel Remarks


Input 1 BCD 1 E8, E7 OK
Input 2 BCD 2 E10, E9 OK
Input 3 BCD 4 F1, E9 OK
Input 4 BCD 8 F2, E9 OK
Input 5 BCD 10 F4, F3 OK
Input 6 BCD 20 F5, F3 OK
Input 7 SPARE F7, F6 OK
Input 8 SPARE F8, F6 OK
Input 9 AVC IN LOCAL H4, H3 OK
Input 10 AVC IN REMOTE H5, H3 OK
Input 11 AVC IN AUTO H6, H3 OK
Input 12 AVC IN MANUAL H8, H7 OK
Input1 3 PROTECTION UNDERTEST H9, H7 OK
Input 14 TAP IN PROGRESS H10,H7 OK

TESTING ENGINEER CSD- Engineer


Signature: ________________ Signature: ________________
Name : VINODE KUMAR (XER-062) Name : ZULQARNAIN MUSHTAQ
Contract No: 4400005948 Contractor: NCC

AVR (ZIV) FAINAL SETTING TEST REPORT Client: National Grid SA

DIE 4B 115/13.8kV SS Sheet : Page 3 of 5


Panel No :RTCC.1 (SN-132777) CONTROL ROOM

Input 15 TRF INDIVISUAL I2, I1 OK


Input 16 T1/T2 IN PARALLEL I3, I1 OK
Input 17 TRFO IN PARALLEL I4, I1 OK
Input 18 OLTC IN LOCAL I6, I5 OK
Input 19 OLTC MOTOR SUPPLY FAIL I7, I5 OK
Input 20 CONTROL SUPPLY FAIL I9, I8 OK
Input 21 AC SUPPLY FAIL I10, I8 OK
Input 22 T1/T3 PARALLEL J2, J1 OK
Input 23 VT SUPPLY FAIL J3, J1 OK
Input 24 SPARE J5, J4 OK
Input 25 SPARE J6, J4 OK

6. OUTPUT VERIFICATION CHECKLIST:

Hardware
Output Description Remarks
Channel
D2, D3 (NO) OK
1. Watchdog
D2, D4 (NC) OK
Output 1 AUTO D5, D6 (NO) OK
Output 2 UPPER LIMIT REACH D7, D8 (NO) OK
Output 3 LOWER LIMIT REACH D9, D10 (NO) OK
Output 4 AUTO COMMAND FROM SAS E1, E2 (NO) OK
Output 5 MAN. COMMAND FROM SAS E3, E4 (NO) OK
Output 6 UV/OV/OC BLOCK(SPARE) E5, E6 (NO) OK
Output 7 UV TO ABTS G1, G2 (NO) OK
Output 8 SPARE G3, G4 (NO) OK
Output 9 SPARE G5, G6 (NO) OK
Output 10 SPARE G7, G8 (NO) OK
Output 11 SPARE G9, G10 (NO) OK
Output 12 SPARE H1, H2 (NO) OK

7. BANDWIDTH CHECK (DEAD BAND): Vref = 115 V

Final Set Measured Values


Sl.No % BW/2 REMARKS
Dead Band (GI)% RAISE (U1) % LOWER (U2) %
1. 2 98.00 101.98 0.01 OK
Accuracy: ±0.1% or ±50 mV (the greater)

TESTING ENGINEER CSD- Engineer


Signature: ________________ Signature: ________________
Name : VINODE KUMAR (XER-062) Name : ZULQARNAIN MUSHTAQ
Contract No: 4400005948 Contractor: NCC

AVR (ZIV) FAINAL SETTING TEST REPORT Client: National Grid SA

DIE 4B 115/13.8kV SS Sheet : Page 4 of 5


Panel No :RTCC.1 (SN-132777) CONTROL ROOM

9. TIMER CHECK:

9.1 TIMER T1 (DEFINITE TIME): (AUTO MODE)

Dead band setting: 2% Definite Time Time Delay (T1): 60sec


VNOMINAL: 120V

Sl. (T1)Time Operating Values of T1 (Sec)


No. REMARKS
final setting RAISE (U1) LOWER (U2)
1. 60 60.1 60.1 OK
Accuracy: 2 % or 25 ms (the greater)

9.2 TIMER T2 (DEFINITE TIME):

Dead band setting: 2% VNOMINAL: 115V

TO MEASURE T2, MEASURE THE TOTAL TIME OF T1+T2, THEN FIND T2.

Sl. (T2)Time Operating Values of T2 (Sec)


No. REMARKS
final setting RAISE (U1) LOWER (U2)
1. 10 10.1 10.1 OK
Accuracy: 2 % or 25 ms (the greater)

9.3 Run Back Voltage Test: (relay will not see T1 ,will raise instantatly)

Runback Voltage
Runback Voltage value MEASURED Measured time for REMARK
final Setting
corresponding to %Un Voltage (V) T1 CMD (sec) S
(%Un)
110% 126.5 126.5 1.03 OK
Operation time is between 0.5 s and 1.5 s.

10. BLOCKING PROTECTION FUNCTIONS:

10.1 UNDER VOLTAGE BLOCKING: VNOMINAL: 115V

Under Voltage final Under Voltage value Measured Pick up Measured Drop off
REMARKS
setting (%Un) corresponding to (%Un) Value (V) Value (V)
80.0 92 92 94.6 OK
Accuracy: ±0.1% or ±50 mV (the greater)

10.2 OVER CURRENT BLOCKING: INOMINAL:1A

Over current final Over Current value Measured Pick up Measured Drop off
REMARKS
setting (% In) corresponding to (%In) Value (A) Value (A)
120 1.2 1.204 1.186 OK
Accuracy: ±0.1% or ±2 mA (the greater)

TESTING ENGINEER CSD- Engineer


Signature: ________________ Signature: ________________
Name : VINODE KUMAR (XER-062) Name : ZULQARNAIN MUSHTAQ
Contract No: 4400005948 Contractor: NCC

AVR (ZIV) FAINAL SETTING TEST REPORT Client: National Grid SA

DIE 4B 115/13.8kV SS Sheet : Page 5 of 5


Panel No :RTCC.1 (SN-132777) CONTROL ROOM

10.3 Out of Voltage Block Test:

Out of Voltage Measured Time for Out of


Remarks
Timer final Setting Voltage
120.0 s 120.2 OK
Accuracy: 2 % or 25 ms (the greater)

11. OV VOLTAGE ALARM: VNOMINAL: 115V

Under Voltage final Under Voltage value Measured Pick up Measured Drop off
REMARKS
setting (%Un) corresponding to (%Un) Value (V) Value (V)
144.0 144 144.1 137.3 OK
Accuracy: ±0.1% or ±50 mV (the greater)

Test Equipment:
1-Freja 300
S.NO:1302708
CAL.EXPIRY:26.9.2017
2-Multimeter FLUKE
S.NO:30850238
CAL.EXPIRY:17.11.2017

TESTING ENGINEER CSD- Engineer


Signature: ________________ Signature: ________________
Name : VINODE KUMAR (XER-062) Name : ZULQARNAIN MUSHTAQ