SITE ACCEPTANCE TEST

Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 1 of 16
ACCEPTANCE TEST Device Ref: CPM1

1. GENERAL INFORMATION

Panel No: +CBP1 / 13.8kV CAPACITOR-1 PROTN Rated current 1 / 5A


Make GE Aux: Voltage 110-250 V DC/100-240 VAC
Serial No: AAFC12000160 Frequency 50/60 Hz
Model No: C70J03HKHF8LH6UM6TPXXUXXWX CT Ratio 600/1A (OC/EF)
X
Version No: V.6.0 CT Ratio 10/1A (Neutral Displacement)
VT Ratio 13.8/0.100 kV VT Ratio 13.8/0.110 kV (Voltage Displacement)

2. MECHANICAL CHECK AND VISUAL INSPECTION

ITEM DESCRIPTION REMARKS


1. Inspect for any physical damage or defects. OK
2. Verify connections as per approved drawing. OK
3. Check tightness of all connections. OK
4. Check Apparatus list. OK

RELAY CHECKS (with Relay energized).

ITEM DESCRIPTION REMARKS


1. Language has been set to English. OK
2. Frequency has been set to 60 Hz. OK
3. Relay Model has been checked in the display OK
4. Resetting of the alarms through HMI checked OK
5. Active setting group has been checked. OK
7. Event and Disturbance Record. OK
3. ELECTRICAL TESTS:

3.1 FUNCTION TEST


Item Description Remarks

1 Human Machine Interface [ HMI ] checked OK


2 Test Switch checked for correct function OK
3 Case Earthling checked OK
4 Indications checked OK
5 Binary Input checked OK
6 Checked all Binary input & Output Configured as per scheme OK
7 Reset of indications checked OK

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 2 of 16
ACCEPTANCE TEST Device Ref: CPM1
8 Set Date and Time for the Relay. OK

3.2 METERING CHECK


APPLIED: VPH - N = …57.735 V I PH = …1 AMP  V-I = …0°.
CT RATIO: 600/1 VT RATIO : 13.8kV/100V
APPLIED: VPH - N = …63.51 V I PH = …1 AMP  V-I = …0°.
CT RATIO: 10/1 (Neutral Displacement) VT RATIO : 13.8kV/110V (Voltage Displacement)

MEASURED VALUES IN THE RELAY


S.N0 PARAMETER
PRIMARY
MEASUREMENT
1. 598.222 A
IA
2. 598.174 A
IB
3. 598.398 A
IC
4. 3Io 0A

5. 7.966 KV
RMS VAG
6. 7.966 KV
RMS V BG
7. 7.968 KV
RMS V CG
8. 13.793 KV
RMS V A-B
9. 13.798 KV
RMS V B-C
10. 13.8010 KV
RMS V C-A
11. 3 Vo 0
12. S (AT 0 DEG) 14.298 MVA
13. P 14.304 MW
14. Q AT 90 DEG 14.298 MVAR
15. FERQUENCY 60
16. GROUND IG A (Neutral Displacement) 9.968 A

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 3 of 16
ACCEPTANCE TEST Device Ref: CPM1
AUX. VOLTAGE RMS VX (Voltage
17. 7.967 kV
Displacement)
4 SECONDARY INJECTION:-

4.1 OVERCURRENT PROTECTION


Tolerance = Setting ± 5 % (PickUp) 0.95 x Setting ± 5 % (Drop Off)

4.1.1 PH TOC1 (IDMT Stage-1)

Phase Set Current(I›1) Pickup Amps Limit(A) Drop off Amps Limit(A)
A 0.500 A 0.503 0.475-0.525 0.487 0.451 – 0.498
B 0.500A 0.503 0.475-0.525 0.487 0.451 – 0.498
C 0.500 A 0.503 0.475-0.525 0.487 0.451 – 0.498

4.1.2 PH TOC2 (IDMT Stage-2)

Phase Set Current(I›1) Pickup Amps Limit(A) Drop off Amps Limit(A)
A 0.500 A 0.503 0.475-0.525 0.487 0.451 – 0.498
B 0.500A 0.503 0.475-0.525 0.487 0.451 – 0.498
C 0.500 A 0.503 0.475-0.525 0.487 0.451 – 0.498

4.1.3 PH IOC1 (DMT Stage-1)

Phase Set Current(I›1) Pickup Amps Limit(A) Drop off Amps Limit(A)
A 1A 1.003 0.975-1.025 0.973 0.951 – 0.998
B 1A 1.003 0.975-1.025 0.972 0.951 – 0.998
C 1A 1.003 0.975-1.025 0.972 0.951 – 0.998

4.1.4 PH IOC2 (DMT Stage-2)

Phase Set Current(I›1) Pickup Amps Limit(A) Drop off Amps Limit(A)
A 1A 1.003 0.975-1.025 0.973 0.951 – 0.998
B 1A 1.003 0.975-1.025 0.973 0.951 – 0.998
C 1A 1.003 0.975-1.025 0.973 0.951 – 0.998

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 4 of 16
ACCEPTANCE TEST Device Ref: CPM1

4.2 Non Directional Over Current Protection Operating Times Stage 1 & 2

4.2.1 Timing Test for DMT (PH IOC 1 & PH IOC 2)

Phase Injected PH IOC 1 PH IOC 2


Current
2x Iset Set Time (s) Measured Time (s) Set Time (s) Measured Time (s)
A 1A 1 1.03 2 2.02
B 1A 1 1.02 2 2.02
C 1A 1 1.02 2 2.02
Tolerance =2% or 50ms whichever is greater

4.2.2 Timing Test for IDMT (PH TOC1 & PH TOC2)

In = 1A
I > Set = 0.5 ‫٭‬In
TMS = 0.3

Time
PH 2×I >
CURVE DESCRIPTION Limits
Set(Amps) Calc. Time(Sec) PH TOC1 PH TOC2

IEC CURVE A
A 1A 3.008 3.05 3.05 2.8576-3.158
STANDARD INVERSE
IEC CURVE B
B 1A 4.05 4.10 4.10 3.848-4.2525
VERY INVERSE
IEC CURVE C
C 1A 8.00 8.11 8.11 7.6-8.4
EXT. INVERSE
A DEFINTE TIME 1A 1 1.03 1.03 0.95-1.05
B IEEE VERY INVERSE 1A 2.1083 2.15 2.15 2.05-2.25
C IEEE EXT INVERSE 1A 2.8566 2.91 2.91 2.80-2.94

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 5 of 16
ACCEPTANCE TEST Device Ref: CPM1

4.3 EARTH FAULT PROTECTION

Tolerance = Setting ± 5 % (PickUp) 0.95 x Setting ± 5 % (Drop Off)

4.3.1 NEUTRAL TOC1 (IDMT Stage-1)

In = 1A I set = 0.2 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

N 0.2 ‫٭‬In 0.202 0.19 – 0.21 0.195 0.180-0.199

4.3.2 NEUTRAL TOC2 (IDMT Stage-2)

In = 1A I set = 0.2 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

N 0.2 ‫٭‬In 0.202 0.19 – 0.21 0.195 0.180-0.199

4.3.3 NEUTRAL IOC1 (DMT Stage-1)

In = 1A I set = 0.1 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

N 0.4 ‫٭‬In 0.108 0.09 – 0.11 0.100 0.08-0.099

4.3.4 NEUTRAL IOC2 (DMT Stage-2)

In = 1A I set = 0.1 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

N 0.4 ‫٭‬In 0.107 0.09 – 0.11 0.099 0.08-0.099

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 6 of 16
ACCEPTANCE TEST Device Ref: CPM1

4.4 Non Directional Earth Fault Protection Operating Times Stage 1 & 2

4.4.1 Timing Test for DMT (NEUTRAL IOC 1 & NEUTRAL IOC 2)

Injected
Phase NEUTRAL IOC 1 NEUTRAL IOC 2
Current
2x Iset Set Time (s) Measured Time (s) Set Time (s) Measured Time (s)
N 0.2 1 1.02 2 2.02

4.4.2 Timing Test for IDMT (NEUTRAL TOC 1 & NEUTRAL TOC 2)

In = 1A
Ie >Set = 0.2 * In
TMS = 0.3

Time
PH 2×I >
CURVE DESCRIPTION NEUTRAL NEUTRAL Limits
Set(Amps) Calc. Time(Sec)
TOC1 TOC2
IEC CURVE A
N 0.4 A 3.008 3.03 3.03 2.8576-3.158
STANDARD INVERSE
IEC CURVE B
N 0.4 A 4.05 4.06 4.05 3.848-4.2525
VERY INVERSE
IEC CURVE C
N 0.4 A 8.00 7.99 8.00 7.6-8.4
EXT. INVERSE
N DEFINTE TIME 0.4 A 1 1.04 1.03 0.95-1.05
N IEEE VERY INVERSE 0.4 A 2.1083 2.12 2.12 2.05-2.25
N IEEE EXT INVERSE 0.4 A 2.8566 2.87 2.86 2.80-2.94

Tolerance
IDMT = Setting ± (5% of Setting) or 40ms whichever is greater

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 7 of 16
ACCEPTANCE TEST Device Ref: CPM1

4.5 EARTH FAULT PROTECTION (NEUTRAL DISPLACEMENT)

Tolerance = Setting ± 5 % (PickUp) 0.95 x Setting ± 5 % (Drop Off)

4.5.1 GROUND TOC1 (IDMT Stage-1)

In = 1A I set = 0.2 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

N 0.2 ‫٭‬In 0.202 0.19 – 0.21 0.194 0.180-0.199

4.5.2 GROUND TOC2 (IDMT Stage-2)

In = 1A I set = 0.2 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

N 0.2 ‫٭‬In 0.202 0.19 – 0.21 0.194 0.180-0.199

4.5.3 GROUND IOC1 (DMT Stage-1)

In = 1A I set = 0.1 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

N 0.1 ‫٭‬In 0.101 0.09 – 0.11 0.098 0.08-0.099

4.5.4 GROUND IOC2 (DMT Stage-2)

In = 1A I set = 0.1 In

Set current Drop – off Drop- off Limit in


Phase Pick up Amps Pick up Limit (A)
(Ie>) Amps Amps

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 8 of 16
ACCEPTANCE TEST Device Ref: CPM1
N 0.1 ‫٭‬In 0.101 0.09 – 0.11 0.098 0.08-0.099

4.6 Non Directional Earth Fault Protection Operating Times Stage 1 & 2

4.6.1 Timing Test for DMT (GROUND IOC 1 & GROUND IOC 2)

Phase Injected GROUND IOC1 GROUND IOC 2


Current
2x Iset Set Time (s) Measured Time (s) Set Time (s) Measured Time (s)
N 0.2 A 1 1.02 2 2.02

4.6.2 Timing Test for DMT (GROUND TOC 1 & GROUND TOC 2)

In = 1A
Ie >Set = 0.2 * In
TMS = 0.3

Time
PH 2×I >
CURVE DESCRIPTION GROUND GROUND Limits
Set(Amps) Calc. Time(Sec)
TOC1 TOC2
IEC CURVE A
A 1A 3.008 3.03 3.03 2.8576-3.158
STANDARD INVERSE
IEC CURVE B
B 1A 4.05 4.05 4.05 3.848-4.2525
VERY INVERSE
IEC CURVE C
C 1A 8.00 7.98 8.00 7.6-8.4
EXT. INVERSE
DEFINTE TIME AT 1
A 1A 1 1.03 1.04 0.95-1.05
SEC
B IEEE VERY INVERSE 1A 2.1083 2.12 2.12 2.05-2.25
C IEEE EXT INVERSE 1A 2.8566 2.86 2.86 2.80-2.94

Tolerance
IDMT = Setting ± (5% of Setting) or 40ms whichever is greater

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 9 of 16
ACCEPTANCE TEST Device Ref: CPM1

5.0 VOLTAGE PROTECTION

5.1 OVER VOLTAGE & UNDER VOLTAGE PROTECTION

5.1.1 PHASE UV1 (UNDERVOLTAGE STAGE-1), RATED VOLTAGE P-P (100 V)

Phase Set Voltage Pickup Volt Drop off Volt


A 0.5 PU 49.96 50.96
B 0.5 PU 49.98 50.96
C 0.5 PU 49.98 50.99

5.1.2 PHASE UV2 (UNDERVOLTAGE STAGE-2), RATED VOLTAGE P-P (100 V)

Phase Set Voltage Pickup Volt Drop off Volt


A 0.4 PU 39.99 40.81
B 0.4 PU 40.00 40.80
C 0.4 PU 39.99 40.79

5.1.3 PH OV1 (OVERVOLTAGE STAGE-1), RATED VOLTAGE P-P (100 V)

Phase Set Voltage Pickup Volt Drop off Volt


A 0.6 PU 62.11 59.73
B 0.6 PU 62.19 59.83
C 0.6 PU 62.13 59.10

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 10 of 16
ACCEPTANCE TEST Device Ref: CPM1

5.2 OVER VOLTAGE & UNDER VOLTAGE PROTECTION TIMING TEST

5.2.1 Under Voltage Operating Times Stage 1 & 2 (PH UV1 & PH UV2)

Phase Injected PH UV1 PH UV2


Current
2x Iset Set Time (s) Measured Time (s) Set Time (s) Measured Time (S)
A 30 V 3 3.02 5 5.02
B 30V 3 3.02 5 5.02
C 30V 3 3.02 5 5.02

5.2.2 Over Voltage Operating Times Stage 1 (PH OV1)

Injected
Phase PH OV1
Current
2x Iset Set Time (s) Measured Time (s)
A 62V 4 4.04
B 62V 4 4.05
C 62V 4 4.05

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 11 of 16
ACCEPTANCE TEST Device Ref: CPM1

5.3 VOLTAGE DISPLACEMENT PROTECTION

5.3.1 Aux OV1 (Voltage Displacement Stage-1)

Phase Set Voltage Pickup Volt Primary Voltage (V) Drop off Volt
N 0.010 PU 1.01 138.784 1.00
N 0.015 PU 1.51 209.161 1.45
N 0.020 PU 2.00 276.856 1.94

5.3.2 Aux OV2 (Voltage Displacement Stage-2)

Phase Set Voltage Pickup Volt Primary Voltage (V) Drop off Volt
N 0.010 PU 1.01 138.784 1.00
N 0.015 PU 1.51 209.161 1.46
N 0.020 PU 2.00 276.856 1.94

5.3.3 Voltage Displacement Stage1 & 2 Timing Test (AUX OV1 & AUX OV2)

Phase Injected AUX OV1 AUX OV2


Current
2x Iset Set Time (s) Measured Time (s) Set Time (s) Measured Time (S)
N 3V 1 1.02 1 1.03
N 3V 2 2.02 2 2.03
N 3V 3 3.03 3 5.02

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 12 of 16
ACCEPTANCE TEST Device Ref: CPM1

6. Binary Input Check:

Relay terminal Signal Status Remarks


BI No.
+ ive - ive Checked Function/Duty
IP1 H7a H7b DONE SPARE OK
IP2 H7c H7b DONE SPARE OK
IP3 H8a H7b DONE SPARE OK
IP4 H8c H7b DONE SPARE OK
IP5 M5a M5b DONE RELAY UNDER TEST OK
IP6 M5c M5b DONE SPARE OK
IP7 M6a M5b DONE SPARE OK
IP8 M6c M5b DONE SPARE OK
IP9 M7a M7b DONE SPARE OK
IP10 M7c M7b DONE SPARE OK
IP11 M8a M7b DONE SPARE OK
IP12 M8c M7b DONE SPARE OK

7. Binary Output Check:

Relay
BO No. Relay terminal Operation Function/Duty Remarks
Checked
BO 1 H1c-H1b (NO) DONE CURRENT UNBALANCE CB TRIP
BO 2 H2c-H2b (NO) DONE NEUTRAL DISPLACEMENT CB TRIP
BO 3 H3c-H3b (NO) DONE SPARE OK
BO 4 H4c-H4b (NO) DONE SPARE OK
BO 5 H5c-H5b (NO) DONE SPARE OK
BO 6 H6c-H6b (NO) DONE SPARE OK

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 13 of 16
ACCEPTANCE TEST Device Ref: CPM1
BO 7 M1c-M1b (NO) DONE SPARE OK
BO 8 M2c-M2b (NO) DONE SPARE OK
BO 9 M3c-M3b (NO) DONE SPARE OK
BO 10 M4c-M4b (NO) DONE SPARE OK

6. LEDS Functional Test

LED No’s Color Function/Duty Remarks


- YELLOW IN SERVICE OK

- YELLOW TROUBLE OK
- YELLOW TEST MODE OK
- YELLOW TRIP OK
- YELLOW ALARM OK
- YELLOW PICK UP OK
- YELLOW VOLTAGE OK
- YELLOW CURRENT OK
- YELLOW FREQUENCY OK
- YELLOW OTHER OK
- YELLOW PHASE A OK
- YELLOW PHASE B OK
- YELLOW PHASE C OK
- YELLOW NEUTRAL OK
LED 1 TO FOR ALL ABOVE TESTED
RED OK
LED 48 FUNCTIONS

Test equipments Used:

EQUPMENT USED SERIAL NUMBER CALIBRATION DUE DATE


PROGRAMMA FREJA 300 9502017 05.05.2014
MULTIMETER FLUKE 179 11730037 03.06.2014

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 14 of 16
ACCEPTANCE TEST Device Ref: CPM1

FORMULAE FOR IE C/ UK & IE E E/ US C U R V E S :

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 15 of 16
ACCEPTANCE TEST Device Ref: CPM1

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH


SITE ACCEPTANCE TEST
Date : 13 -12-2013
REPORT
Customer:
Contractor’s name: AL GIHAZ
SEC-WOA
SEC WOA Contract No.
NEW 110/13.8kV RADAF SITE
21131102
CAPACITOR BANK MAIN-1 PROTN RELAY C70 Page 16 of 16
ACCEPTANCE TEST Device Ref: CPM1

TESTING ENGINEER CSD- WOA

Signature: ________________ Signature: ________________

Name : A. MOHAMMAD HUSSAIN Name : MOHAMED JIYATH