VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 01 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 01 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG TEST R-Y: 392 V Y-B: 388 V B-R: 389 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-N Y-N B-N
Position Position
1 4.44 4.41 4.45 1 2.58 2.57 2.57
2 4.55 4.52 4.55 2 2.64 2.64 2.63
3 4.66 4.63 4.66 3 2.71 2.70 2.69
4 4.77 4.74 4.77 4 2.77 2.76 2.76
5 4.89 4.86 4.90 5 2.84 2.84 2.83
6 5.02 4.98 5.02 6 2.92 2.91 2.90
7 5.15 5.11 5.16 7 3.00 2.98 2.98
8 5.29 5.26 5.30 8 3.07 3.06 3.06
9 5.44 5.40 5.45 9 3.16 3.15 3.15
REMARKS:
TRANSFORMER TESTED – OK
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 02 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 02 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG TEST R-Y: 398 V Y-B: 394 V B-R: 395 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-N Y-N B-N
Position Position
1 4.52 4.46 4.53 1 2.64 2.59 2.60
2 4.63 4.57 4.64 2 2.70 2.65 2.66
3 4.74 4.68 4.76 3 2.77 2.71 2.73
4 4.86 4.79 4.87 4 2.84 2.78 2.80
5 4.98 4.92 4.99 5 2.91 2.85 2.86
6 5.11 5.04 5.12 6 2.98 2.92 2.94
7 5.25 5.18 5.26 7 3.06 3.00 3.02
8 5.39 5.32 5.41 8 3.14 3.08 3.10
9 5.54 5.47 5.55 9 3.23 3.17 3.19
REMARKS:
TRANSFORMER TESTED – OK
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 01 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 01 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.46 4.41 4.47 1 4.46 4.41 4.47
2 4.57 4.52 4.57 2 4.57 4.52 4.57
3 4.68 4.63 4.68 3 4.68 4.63 4.68
4 4.79 4.74 4.80 4 4.80 4.74 4.80
5 4.91 4.86 4.92 5 4.92 4.86 4.92
6 5.03 4.98 5.05 6 5.04 4.98 5.05
7 5.17 5.12 5.18 7 5.17 5.11 5.18
8 5.31 5.25 5.32 8 5.32 5.25 5.33
9 5.46 5.40 5.47 9 5.47 5.40 5.48
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 02 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 02 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 398 V Y-B: 394 V B-R: 394 V
@ LV WDG-2 TEST R-Y: 398 V Y-B: 394 V B-R: 394 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.42 4.37 4.43 1 4.44 4.39 4.43
2 4.53 4.47 4.53 2 4.54 4.49 4.53
3 4.64 4.58 4.64 3 4.65 4.60 4.64
4 4.75 4.70 4.76 4 4.76 4.71 4.76
5 4.87 4.82 4.88 5 4.88 4.83 4.88
6 4.99 4.94 5.00 6 5.01 4.95 5.01
7 5.13 5.07 5.14 7 5.14 5.08 5.14
8 5.27 5.21 5.28 8 5.28 5.21 5.28
9 5.42 5.36 5.42 9 5.42 5.36 5.42
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 03 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 03 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 397 V B-R: 397 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 397 V B-R: 397 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.43 4.38 4.43 1 4.43 4.38 4.44
2 4.54 4.49 4.54 2 4.53 4.49 4.54
3 4.64 4.59 4.64 3 4.64 4.59 4.65
4 4.75 4.70 4.76 4 4.76 4.70 4.77
5 4.88 4.82 4.89 5 4.88 4.83 4.89
6 5.00 4.94 5.01 6 5.00 4.95 5.02
7 5.13 5.07 5.14 7 5.14 5.08 5.15
8 5.27 5.21 5.28 8 5.27 5.22 5.29
9 5.41 5.35 5.42 9 5.41 5.36 5.43
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 04 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 04 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 400 V Y-B: 395 V B-R: 395 V
@ LV WDG-2 TEST R-Y: 400 V Y-B: 395 V B-R: 395 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.43 4.39 4.44 1 4.42 4.39 4.44
2 4.53 4.49 4.54 2 4.52 4.49 4.54
3 4.64 4.60 4.65 3 4.64 4.60 4.65
4 4.76 4.71 4.76 4 4.75 4.71 4.77
5 4.88 4.82 4.88 5 4.88 4.83 4.89
6 5.00 4.96 5.02 6 5.00 4.96 5.02
7 5.13 5.09 5.15 7 5.13 5.08 5.16
8 5.27 5.23 5.29 8 5.27 5.23 5.28
9 5.42 5.38 5.44 9 5.42 5.38 5.44
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 05 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 05 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 394 V Y-B: 390 V B-R: 390 V
@ LV WDG-2 TEST R-Y: 394 V Y-B: 390 V B-R: 390 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.35 4.32 4.37 1 4.37 4.33 4.38
2 4.45 4.42 4.47 2 4.48 4.43 4.49
3 4.56 4.52 4.58 3 4.59 4.54 4.59
4 4.67 4.63 4.69 4 4.69 4.64 4.70
5 4.79 4.73 4.81 5 4.81 4.76 4.82
6 4.92 4.87 4.93 6 4.93 4.87 4.94
7 5.05 5.00 5.06 7 5.06 5.00 5.06
8 5.18 5.14 5.20 8 5.19 5.13 5.19
9 5.33 5.28 5.35 9 5.34 5.27 5.34
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 06 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 06 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 396 V B-R: 396 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 396 V B-R: 396 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.46 4.41 4.46 1 4.44 4.39 4.45
2 4.56 4.51 4.57 2 4.54 4.49 4.55
3 4.67 4.62 4.68 3 4.65 4.60 4.66
4 4.78 4.74 4.79 4 4.77 4.72 4.78
5 4.90 4.86 4.91 5 4.89 4.84 4.90
6 5.03 4.98 5.04 6 5.02 4.96 5.03
7 5.16 5.11 5.16 7 5.15 5.09 5.16
8 5.30 5.25 5.31 8 5.29 5.23 5.30
9 5.45 5.39 5.46 9 5.45 5.37 5.45
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 07 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 07 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.44 4.40 4.45 1 4.45 4.41 4.46
2 4.54 4.50 4.55 2 4.55 4.51 4.56
3 4.65 4.61 4.66 3 4.65 4.62 4.67
4 4.76 4.72 4.78 4 4.77 4.73 4.79
5 4.88 4.84 4.90 5 4.89 4.84 4.91
6 5.00 4.97 5.02 6 5.02 4.97 5.03
7 5.14 5.10 5.15 7 5.15 5.10 5.17
8 5.27 5.24 5.30 8 5.28 5.24 5.30
9 5.42 5.39 5.45 9 5.43 5.38 5.44
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 08 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 08 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 399 V Y-B: 394 V B-R: 395 V
@ LV WDG-2 TEST R-Y: 399 V Y-B: 394 V B-R: 395 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.40 4.35 4.41 1 4.40 4.35 4.41
2 4.50 4.45 4.52 2 4.51 4.46 4.51
3 4.61 4.56 4.62 3 4.61 4.56 4.62
4 4.72 4.67 4.73 4 4.72 4.69 4.73
5 4.84 4.78 4.85 5 4.84 4.78 4.85
6 4.96 4.91 4.98 6 4.96 4.91 4.97
7 5.10 5.04 5.11 7 5.10 5.04 5.11
8 5.23 5.17 5.24 8 5.24 5.18 5.25
9 5.38 5.32 5.39 9 5.38 5.33 5.40
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 09 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023
GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 09 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023
RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.40 4.36 4.40 1 4.40 4.36 4.41
2 4.51 4.46 4.51 2 4.50 4.46 4.51
3 4.61 4.57 4.62 3 4.61 4.57 4.62
4 4.73 4.69 4.73 4 4.72 4.68 4.74
5 4.84 4.80 4.84 5 4.84 4.80 4.85
6 4.97 4.92 4.98 6 4.97 4.92 4.98
7 5.10 5.05 5.11 7 5.10 5.05 5.11
8 5.25 5.19 5.25 8 5.24 5.19 5.25
9 5.39 5.33 5.39 9 5.38 5.33 5.39
REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED
Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By: