Sheet 1 of 2

VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 01 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 4.34
Serial No.: 21417/02 Vector Connection: Dyn11
KVA rating: 200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 400 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 415 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 03
High: 3.50
Low: 278.24

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Primary to Earth Secondary to Earth Primary to Secondary
1 Minute 3.25 GΩ 1.04 GΩ 1.36 GΩ
10 Minute 5.49 GΩ 1.83 GΩ 1.91 GΩ
PI 1.69 1.76 1.40

WINDING RESISTANCE TEST

Primary Winding Secondary Winding


R-Y: 60 Ω R’-Y’: 6.68 mΩ R’-Y’: 3.43 mΩ
Y-B: 60 Ω Y’-B’: 6.80 mΩ Y’-B’: 3.42 mΩ
B-R: 60 Ω B’-R’: 6.74 mΩ B’-R’: 3.55 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 392 V Y-B: 388 V B-R: 389 V
Measured Current on HV side R Phase: 0.84 A Y Phase: 0.88 A B Phase: 0.83 A
Measured Short Circuit Current on LV side 73 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
U1U2: 0.137 V1U2: 392 W1U2: 389
U1V2: 4.53 V1V2: 388 W1V2: 389
U1W2: 4.65 V1W2: 388 W1W2 385

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 01 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG TEST R-Y: 392 V Y-B: 388 V B-R: 389 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-N Y-N B-N
Position Position
1 4.44 4.41 4.45 1 2.58 2.57 2.57
2 4.55 4.52 4.55 2 2.64 2.64 2.63
3 4.66 4.63 4.66 3 2.71 2.70 2.69
4 4.77 4.74 4.77 4 2.77 2.76 2.76
5 4.89 4.86 4.90 5 2.84 2.84 2.83
6 5.02 4.98 5.02 6 2.92 2.91 2.90
7 5.15 5.11 5.16 7 3.00 2.98 2.98
8 5.29 5.26 5.30 8 3.07 3.06 3.06
9 5.44 5.40 5.45 9 3.16 3.15 3.15

MAGNETIC BALANCE TEST


Voltage Measured on Secondary Side Voltage Measured on Primary Side
Supply Voltage
R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 392 V
3.4 2.7 5.0 392 160 329
B Phase Out
Y-B: 388 V
5.3 3.4 3.8 381 389 219
R Phase Out
B-R: 389 V
3.5 4.5 4.3 294 308 390
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 0.5 mA Y Phase: 0.6 mA B Phase: 0.6 mA

REMARKS:
TRANSFORMER TESTED – OK

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 02 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 4.36
Serial No.: 21416/01 Vector Connection: Dyn11
KVA rating: 200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 400 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 415 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 03
High: 3.50
Low: 278.24

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Primary to Earth Secondary to Earth Primary to Secondary
1 Minute 115 MΩ 8.29 GΩ 4.28 GΩ
10 Minute 234 MΩ 13.2 GΩ 6.33 GΩ
PI 2.04 1.59 1.48

WINDING RESISTANCE TEST

Primary Winding Secondary Winding


R-Y: 61 Ω R’-Y’: 6.69 mΩ R’-Y’: 3.47 mΩ
Y-B: 60 Ω Y’-B’: 6.71 mΩ Y’-B’: 3.47 mΩ
B-R: 60 Ω B’-R’: 6.69 mΩ B’-R’: 3.50 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 398 V Y-B: 394 V B-R: 395 V
Measured Current on HV side R Phase: 0.86 A Y Phase: 0.89 A B Phase: 0.85 A
Measured Short Circuit Current on LV side 73 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
U1U2: 0.214 V1U2: 398 W1U2: 395
U1V2: 4.92 V1V2: 393 W1V2: 395
U1W2: 4.78 V1W2: 393 W1W2 391

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: COLLECTING STATION – 02 AUXILIARY TRANSFORMER
Test Completion Date: 22/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG TEST R-Y: 398 V Y-B: 394 V B-R: 395 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-N Y-N B-N
Position Position
1 4.52 4.46 4.53 1 2.64 2.59 2.60
2 4.63 4.57 4.64 2 2.70 2.65 2.66
3 4.74 4.68 4.76 3 2.77 2.71 2.73
4 4.86 4.79 4.87 4 2.84 2.78 2.80
5 4.98 4.92 4.99 5 2.91 2.85 2.86
6 5.11 5.04 5.12 6 2.98 2.92 2.94
7 5.25 5.18 5.26 7 3.06 3.00 3.02
8 5.39 5.32 5.41 8 3.14 3.08 3.10
9 5.54 5.47 5.55 9 3.23 3.17 3.19

MAGNETIC BALANCE TEST


Voltage Measured on Secondary Side Voltage Measured on Primary Side
Supply Voltage
R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 398 V
3.9 4.5 2.1 397 211 274
B Phase Out
Y-B: 394 V
4.4 2.3 4.0 273 394 234
R Phase Out
B-R: 395 V
2.2 3.6 4.7 177 303 395
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 0.6 mA Y Phase: 0.5 mA B Phase: 0.3 mA

REMARKS:
TRANSFORMER TESTED – OK

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 01 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.43
Serial No.: 22060/06 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 20.2 GΩ 2.21 GΩ 1.49 GΩ 4.62 GΩ 2.81 GΩ
10 Minute 32.6 GΩ 3.48 GΩ 2.23 GΩ 4.89 GΩ 3.39 GΩ
PI 1.61 1.57 1.49 1.06 1.21

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.4 Ω R’-Y’: 0.95 mΩ R’-Y’: 0.97 mΩ
Y-B: 3.4 Ω Y’-B’: 0.91 mΩ Y’-B’: 0.98 mΩ
B-R: 3.4 Ω B’-R’: 0.95 mΩ B’-R’: 0.99 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 402 V Y-B: 398 V B-R: 398 V
R LV1: 2.9 A Y LV1: 3.6 A B LV1: 3.2 A
Measured Current on HV side
R LV2: 3.2 A Y LV2: 3.5 A B LV2: 3.2 A
Measured Short Circuit Current on LV side WDG-1: 285 A WDG-2: 286 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.254 V1U2: 404 W1U2: 399 U1U2: 0.258 V1U2: 404 W1U2: 399
U1V2: 4.68 V1V2: 400 W1V2: 399 U1V2: 4.68 V1V2: 400 W1V2: 399
U1W2: 4.88 V1W2: 400 W1W2 394 U1W2: 4.90 V1W2: 400 W1W2 395

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 01 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.46 4.41 4.47 1 4.46 4.41 4.47
2 4.57 4.52 4.57 2 4.57 4.52 4.57
3 4.68 4.63 4.68 3 4.68 4.63 4.68
4 4.79 4.74 4.80 4 4.80 4.74 4.80
5 4.91 4.86 4.92 5 4.92 4.86 4.92
6 5.03 4.98 5.05 6 5.04 4.98 5.05
7 5.17 5.12 5.18 7 5.17 5.11 5.18
8 5.31 5.25 5.32 8 5.32 5.25 5.33
9 5.46 5.40 5.47 9 5.47 5.40 5.48

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
4.8 1.3 3.7 403 288 122
B Phase Out
Y-B: 398 V
4.2 4.3 0.4 195 399 208
R Phase Out
B-R: 398 V
2.3 5.4 3.0 32 365 399
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
4.8 1.3 3.7 404 289 125
B Phase Out
Y-B: 398 V
4.2 4.3 0.4 197 400 207
R Phase Out
B-R: 398 V
2.3 5.4 2.9 30 368 400
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 2.2 mA Y Phase: 1.3 mA B Phase: 1.6 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 02 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.32
Serial No.: 22058/04 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 35.8 GΩ 4.72 GΩ 8.15 GΩ 6.92 GΩ 8.26 GΩ
10 Minute 74.7 GΩ 6.36 GΩ 11.9 GΩ 11.2 GΩ 10.3 GΩ
PI 2.09 1.35 1.46 1.62 1.25

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.6 Ω R’-Y’: 1.00 mΩ R’-Y’: 1.06 mΩ
Y-B: 3.5 Ω Y’-B’: 0.96 mΩ Y’-B’: 1.06 mΩ
B-R: 3.6 Ω B’-R’: 1.00 mΩ B’-R’: 1.07 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 398 V Y-B: 394 V B-R: 394 V
R LV1: 3.2 A Y LV1: 3.7 A B LV1: 3.3 A
Measured Current on HV side
R LV2: 3.2 A Y LV2: 3.6 A B LV2: 3.3 A
Measured Short Circuit Current on LV side WDG-1: 289 A WDG-2: 292 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.193 V1U2: 398 W1U2: 393 U1U2: 0.207 V1U2: 400 W1U2: 396
U1V2: 4.68 V1V2: 394 W1V2: 393 U1V2: 4.69 V1V2: 396 W1V2: 396
U1W2: 4.84 V1W2: 394 W1W2 389 U1W2: 4.86 V1W2: 396 W1W2 392

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 02 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 398 V Y-B: 394 V B-R: 394 V
@ LV WDG-2 TEST R-Y: 398 V Y-B: 394 V B-R: 394 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.42 4.37 4.43 1 4.44 4.39 4.43
2 4.53 4.47 4.53 2 4.54 4.49 4.53
3 4.64 4.58 4.64 3 4.65 4.60 4.64
4 4.75 4.70 4.76 4 4.76 4.71 4.76
5 4.87 4.82 4.88 5 4.88 4.83 4.88
6 4.99 4.94 5.00 6 5.01 4.95 5.01
7 5.13 5.07 5.14 7 5.14 5.08 5.14
8 5.27 5.21 5.28 8 5.28 5.21 5.28
9 5.42 5.36 5.42 9 5.42 5.36 5.42

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 398 V
4.8 1.4 3.6 397 295 111
B Phase Out
Y-B: 394 V
4.4 4.0 0.4 218 393 176
R Phase Out
B-R: 394 V
2.0 5.2 3.1 53 338 393
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 398 V
4.9 1.4 3.6 399 298 112
B Phase Out
Y-B: 394 V
4.4 4.1 0.4 220 396 177
R Phase Out
B-R: 394 V
2.0 5.2 3.2 56 338 396
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 2.6 mA Y Phase: 1.6 mA B Phase: 1.8 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 03 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.28
Serial No.: 22059/05 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 55.4 GΩ 108 MΩ 268 MΩ 216 MΩ 219 MΩ
10 Minute 84.3 GΩ 162 MΩ 312 MΩ 342 MΩ 334 MΩ
PI 1.52 1.62 1.16 1.58 1.53

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.4 Ω R’-Y’: 0.97 mΩ R’-Y’: 0.98 mΩ
Y-B: 3.4 Ω Y’-B’: 0.94 mΩ Y’-B’: 1.00 mΩ
B-R: 3.4 Ω B’-R’: 1.02 mΩ B’-R’: 1.02 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 402 V Y-B: 397 V B-R: 397 V
R LV1: 3.2 A Y LV1: 3.6 A B LV1: 3.2 A
Measured Current on HV side
R LV2: 3.2 A Y LV2: 3.7 A B LV2: 3.1 A
Measured Short Circuit Current on LV side WDG-1: 292 A WDG-2: 295 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.212 V1U2: 402 W1U2: 397 U1U2: 0.222 V1U2: 403 W1U2: 397
U1V2: 5.08 V1V2: 397 W1V2: 397 U1V2: 4.68 V1V2: 398 W1V2: 397
U1W2: 4.91 V1W2: 397 W1W2 393 U1W2: 4.88 V1W2: 398 W1W2 393

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 03 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 397 V B-R: 397 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 397 V B-R: 397 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.43 4.38 4.43 1 4.43 4.38 4.44
2 4.54 4.49 4.54 2 4.53 4.49 4.54
3 4.64 4.59 4.64 3 4.64 4.59 4.65
4 4.75 4.70 4.76 4 4.76 4.70 4.77
5 4.88 4.82 4.89 5 4.88 4.83 4.89
6 5.00 4.94 5.01 6 5.00 4.95 5.02
7 5.13 5.07 5.14 7 5.14 5.08 5.15
8 5.27 5.21 5.28 8 5.27 5.22 5.29
9 5.41 5.35 5.42 9 5.41 5.36 5.43

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.0 1.8 3.4 402 322 94
B Phase Out
Y-B: 397 V
4.4 4.0 0.4 222 397 173
R Phase Out
B-R: 397 V
2.4 5.4 3.0 26 370 397
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.1 1.8 3.4 402 323 93
B Phase Out
Y-B: 397 V
4.4 4.0 0.4 223 397 174
R Phase Out
B-R: 397 V
2.4 5.4 3.0 26 371 397
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 2.7 mA Y Phase: 1.2 mA B Phase: 1.4 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 04 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.36
Serial No.: 22062/08 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 36.2 GΩ 25.9 GΩ 2.21 GΩ 14.9 GΩ 4.16 GΩ
10 Minute 69.5 GΩ 28.2 GΩ 2.94 GΩ 16.2 GΩ 6.32 GΩ
PI 1.91 1.09 1.33 1.08 1.51

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.5 Ω R’-Y’: 0.99 mΩ R’-Y’: 0.99 mΩ
Y-B: 3.5 Ω Y’-B’: 1.00 mΩ Y’-B’: 0.95 mΩ
B-R: 3.5 Ω B’-R’: 1.02 mΩ B’-R’: 0.99 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 400 V Y-B: 395 V B-R: 395 V
R LV1: 3.1 A Y LV1: 3.6 A B LV1: 3.2 A
Measured Current on HV side
R LV2: 3.2 A Y LV2: 3.5 A B LV2: 3.1 A
Measured Short Circuit Current on LV side WDG-1: 298 A WDG-2: 297 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.265 V1U2: 400 W1U2: 396 U1U2: 0.269 V1U2: 401 W1U2: 396
U1V2: 5.11 V1V2: 396 W1V2: 396 U1V2: 4.63 V1V2: 397 W1V2: 396
U1W2: 4.93 V1W2: 396 W1W2 392 U1W2: 4.86 V1W2: 397 W1W2 392

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 04 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 400 V Y-B: 395 V B-R: 395 V
@ LV WDG-2 TEST R-Y: 400 V Y-B: 395 V B-R: 395 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.43 4.39 4.44 1 4.42 4.39 4.44
2 4.53 4.49 4.54 2 4.52 4.49 4.54
3 4.64 4.60 4.65 3 4.64 4.60 4.65
4 4.76 4.71 4.76 4 4.75 4.71 4.77
5 4.88 4.82 4.88 5 4.88 4.83 4.89
6 5.00 4.96 5.02 6 5.00 4.96 5.02
7 5.13 5.09 5.15 7 5.13 5.08 5.16
8 5.27 5.23 5.29 8 5.27 5.23 5.28
9 5.42 5.38 5.44 9 5.42 5.38 5.44

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 400 V
4.8 1.3 3.7 400 282 124
B Phase Out
Y-B: 395 V
4.5 3.9 0.6 235 395 158
R Phase Out
B-R: 395 V
2.0 5.2 3.1 57 338 396
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 400 V
4.8 1.3 3.7 401 284 121
B Phase Out
Y-B: 395 V
4.5 3.9 0.5 230 395 164
R Phase Out
B-R: 395 V
2.0 5.2 3.2 60 335 397
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 2.3 mA Y Phase: 1.9 mA B Phase: 1.7 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 05 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.39
Serial No.: 22061/07 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 38.5 GΩ 36.2 GΩ 25.7 GΩ 32.4 GΩ 26.1 GΩ
10 Minute 97.1 GΩ 42.1 GΩ 32.4 GΩ 38.9 GΩ 34.9 GΩ
PI 2.52 1.16 1.26 1.20 1.34

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.8 Ω R’-Y’: 0.97 mΩ R’-Y’: 0.97 mΩ
Y-B: 3.9 Ω Y’-B’: 0.93 mΩ Y’-B’: 1.01 mΩ
B-R: 3.7 Ω B’-R’: 0.97 mΩ B’-R’: 1.02 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 394 V Y-B: 390 V B-R: 390 V
R LV1: 2.9 A Y LV1: 3.5 A B LV1: 3.2 A
Measured Current on HV side
R LV2: 3.1 A Y LV2: 2.4 A B LV2: 2.2 A
Measured Short Circuit Current on LV side WDG-1: 285 A WDG-2: 250 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.160 V1U2: 394 W1U2: 390 U1U2: 0.094 V1U2: 396 W1U2: 391
U1V2: 4.95 V1V2: 390 W1V2: 390 U1V2: 4.73 V1V2: 391 W1V2: 391
U1W2: 4.84 V1W2: 390 W1W2 386 U1W2: 4.79 V1W2: 391 W1W2 387

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 05 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 394 V Y-B: 390 V B-R: 390 V
@ LV WDG-2 TEST R-Y: 394 V Y-B: 390 V B-R: 390 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.35 4.32 4.37 1 4.37 4.33 4.38
2 4.45 4.42 4.47 2 4.48 4.43 4.49
3 4.56 4.52 4.58 3 4.59 4.54 4.59
4 4.67 4.63 4.69 4 4.69 4.64 4.70
5 4.79 4.73 4.81 5 4.81 4.76 4.82
6 4.92 4.87 4.93 6 4.93 4.87 4.94
7 5.05 5.00 5.06 7 5.06 5.00 5.06
8 5.18 5.14 5.20 8 5.19 5.13 5.19
9 5.33 5.28 5.35 9 5.34 5.27 5.34

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 394 V
5.1 2.0 3.3 395 331 86
B Phase Out
Y-B: 390 V
4.3 4.0 0.4 217 390 171
R Phase Out
B-R: 390 V
2.5 5.4 2.8 13 377 390
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 394 V
5.1 2.0 3.3 396 330 89
B Phase Out
Y-B: 390 V
4.3 4.0 0.4 218 391 172
R Phase Out
B-R: 390 V
2.5 5.4 2.8 12 379 391
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 2.0 mA Y Phase: 1.9 mA B Phase: 1.6 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 06 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.46
Serial No.: 22063/09 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level >1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 38.2 GΩ 257 MΩ 3.30 GΩ 689 MΩ 2.29 GΩ
10 Minute 69.4 GΩ 639 MΩ 4.11 GΩ 948 MΩ 4.43 GΩ
PI 1.82 2.49 1.25 1.38 1.94

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.5 Ω R’-Y’: 1.02 mΩ R’-Y’: 1.01 mΩ
Y-B: 3.5 Ω Y’-B’: 1.03 mΩ Y’-B’: 1.02 mΩ
B-R: 3.5 Ω B’-R’: 0.97 mΩ B’-R’: 1.00 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 402 V Y-B: 396 V B-R: 396 V
R LV1: 3.1 A Y LV1: 3.6 A B LV1: 3.2 A
Measured Current on HV side
R LV2: 3.1 A Y LV2: 3.6 A B LV2: 3.2 A
Measured Short Circuit Current on LV side WDG-1: 285 A WDG-2: 284 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.155 V1U2: 402 W1U2: 398 U1U2: 0.141 V1U2: 401 W1U2: 396
U1V2: 4.76 V1V2: 398 W1V2: 398 U1V2: 5.01 V1V2: 396 W1V2: 396
U1W2: 4.89 V1W2: 398 W1W2 394 U1W2: 4.91 V1W2: 396 W1W2 392

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 06 INVERTER DUTY TRANSFORMER
Test Completion Date: 22/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 396 V B-R: 396 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 396 V B-R: 396 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.46 4.41 4.46 1 4.44 4.39 4.45
2 4.56 4.51 4.57 2 4.54 4.49 4.55
3 4.67 4.62 4.68 3 4.65 4.60 4.66
4 4.78 4.74 4.79 4 4.77 4.72 4.78
5 4.90 4.86 4.91 5 4.89 4.84 4.90
6 5.03 4.98 5.04 6 5.02 4.96 5.03
7 5.16 5.11 5.16 7 5.15 5.09 5.16
8 5.30 5.25 5.31 8 5.29 5.23 5.30
9 5.45 5.39 5.46 9 5.45 5.37 5.45

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.0 1.7 3.5 402 318 101
B Phase Out
Y-B: 396 V
4.5 4.0 0.5 232 397 165
R Phase Out
B-R: 396 V
2.3 5.4 3.0 30 367 398
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.0 1.7 3.5 400 315 101
B Phase Out
Y-B: 396 V
4.5 3.9 0.5 231 395 164
R Phase Out
B-R: 396 V
2.3 5.4 3.0 30 364 396
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 2.4 mA Y Phase: 2.1 mA B Phase: 3.1 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 07 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.42
Serial No.: 22055/01 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 31.9 GΩ 258 MΩ 14.9 GΩ 12.1 GΩ 11.9 GΩ
10 Minute 79.5 GΩ 430 MΩ 16.0 GΩ 16.2 GΩ 15.8 GΩ
PI 2.49 1.66 1.07 1.34 1.33

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.4 Ω R’-Y’: 0.96 mΩ R’-Y’: 0.96 mΩ
Y-B: 3.4 Ω Y’-B’: 0.93 mΩ Y’-B’: 0.98 mΩ
B-R: 3.5 Ω B’-R’: 0.96 mΩ B’-R’: 0.99 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 402 V Y-B: 398 V B-R: 398 V
R LV1: 3.1 A Y LV1: 3.4 A B LV1: 3.1 A
Measured Current on HV side
R LV2: 3.2 A Y LV2: 3.6 A B LV2: 3.2 A
Measured Short Circuit Current on LV side WDG-1: 290 A WDG-2: 285 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.260 V1U2: 402 W1U2: 398 U1U2: 0.091 V1U2: 403 W1U2: 398
U1V2: 5.13 V1V2: 397 W1V2: 398 U1V2: 4.82 V1V2: 398 W1V2: 398
U1W2: 4.95 V1W2: 397 W1W2 394 U1W2: 4.90 V1W2: 398 W1W2 394

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 07 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.44 4.40 4.45 1 4.45 4.41 4.46
2 4.54 4.50 4.55 2 4.55 4.51 4.56
3 4.65 4.61 4.66 3 4.65 4.62 4.67
4 4.76 4.72 4.78 4 4.77 4.73 4.79
5 4.88 4.84 4.90 5 4.89 4.84 4.91
6 5.00 4.97 5.02 6 5.02 4.97 5.03
7 5.14 5.10 5.15 7 5.15 5.10 5.17
8 5.27 5.24 5.30 8 5.28 5.24 5.30
9 5.42 5.39 5.45 9 5.43 5.38 5.44

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.1 1.8 3.4 403 325 95
B Phase Out
Y-B: 398 V
4.5 4.0 0.5 231 397 166
R Phase Out
B-R: 398 V
2.3 5.4 3.0 31 366 398
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.1 1.8 3.4 403 327 95
B Phase Out
Y-B: 398 V
4.5 4.0 0.5 233 398 166
R Phase Out
B-R: 398 V
2.4 5.4 3.0 29 368 399
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 3.0 mA Y Phase: 1.9 mA B Phase: 2.1 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 08 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.35
Serial No.: 22057/03 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 58.3 GΩ 2.62 GΩ 1.04 GΩ 3.14 GΩ 2.19 GΩ
10 Minute 82.6 GΩ 3.92 GΩ 1.29 GΩ 6.22 GΩ 2.64 GΩ
PI 1.41 1.50 1.24 1.98 1.21

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.4 Ω R’-Y’: 0.94 mΩ R’-Y’: 0.98 mΩ
Y-B: 3.4 Ω Y’-B’: 0.91 mΩ Y’-B’: 0.99 mΩ
B-R: 3.4 Ω B’-R’: 0.95 mΩ B’-R’: 1.00 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 399 V Y-B: 394 V B-R: 395 V
R LV1: 3.1 A Y LV1: 3.5 A B LV1: 2.9 A
Measured Current on HV side
R LV2: 3.2 A Y LV2: 3.6 A B LV2: 3.2 A
Measured Short Circuit Current on LV side WDG-1: 294 A WDG-2: 289 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.180 V1U2: 399 W1U2: 394 U1U2: 0.207 V1U2: 398 W1U2: 394
U1V2: 5.01 V1V2: 395 W1V2: 394 U1V2: 5.06 V1V2: 394 W1V2: 394
U1W2: 4.89 V1W2: 395 W1W2 390 U1W2: 4.88 V1W2: 394 W1W2 389

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 08 INVERTER DUTY TRANSFORMER
Test Completion Date: 21/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 399 V Y-B: 394 V B-R: 395 V
@ LV WDG-2 TEST R-Y: 399 V Y-B: 394 V B-R: 395 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.40 4.35 4.41 1 4.40 4.35 4.41
2 4.50 4.45 4.52 2 4.51 4.46 4.51
3 4.61 4.56 4.62 3 4.61 4.56 4.62
4 4.72 4.67 4.73 4 4.72 4.69 4.73
5 4.84 4.78 4.85 5 4.84 4.78 4.85
6 4.96 4.91 4.98 6 4.96 4.91 4.97
7 5.10 5.04 5.11 7 5.10 5.04 5.11
8 5.23 5.17 5.24 8 5.24 5.18 5.25
9 5.38 5.32 5.39 9 5.38 5.33 5.40

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 399V
5.0 1.6 3.5 399 311 101
B Phase Out
Y-B: 394 V
4.5 3.9 0.5 234 394 158
R Phase Out
B-R: 395 V
2.3 5.3 3.0 33 359 394
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 399 V
5.0 1.6 3.5 399 310 102
B Phase Out
Y-B: 394 V
4.5 3.9 0.5 234 394 158
R Phase Out
B-R: 395 V
2.3 5.3 3.0 33 358 394
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 1.8 mA Y Phase: 2.1 mA B Phase: 1.7 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 1 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 09 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023

NAME PLATE DETAIL


Manufacturer: SHILCHAR TECHNOLIGIES LTD % Impedance: 6.34
Serial No.: 22056/02 Vector Connection: Dy11y11
KVA rating: 2200 Type of Cooling: ONAN
Voltage Rating (Voltage) Volume of Oil: 2170 Ltrs
High: 33000 Year of Manufacture: 2015
Low: 405 – 405 Number of Tap: 09
Current Rating: (Ampere) Tap Setting: 05
High: 38.49
Low: 1568.11 – 1568.11

GENERAL CHECK-UP
1. Visual Inspection for External Damage to Transformer OK
2. Transformer Conservator Tank Oil Level > 1/2
3. Transformer Breather Silica Gel Condition Blue

INSULATION RESISTANCE TEST


Insulation Resistance Test @ 5000/1000V DC
Secondary to Earth Primary to Secondary
Primary to Earth
LV1 LV2 LV1 LV2
1 Minute 9.17 GΩ 2.23 GΩ 1.65 GΩ 10.6 GΩ 9.58 GΩ
10 Minute 15.4 GΩ 3.57 GΩ 1.75 GΩ 17.3 GΩ 16.2 GΩ
PI 1.68 1.15 1.06 1.63 1.69

WINDING RESISTANCE TEST


Secondary Winding
Primary Winding
WINDING-1 WINDING-2
R-Y: 3.4 Ω R’-Y’: 1.01 mΩ R’-Y’: 1.00 mΩ
Y-B: 3.4 Ω Y’-B’: 1.06 mΩ Y’-B’: 0.96 mΩ
B-R: 3.4 Ω B’-R’: 1.09 mΩ B’-R’: 0.98 mΩ

SHORT CIRCUIT TEST


Applied Voltage on HV side R-Y: 402 V Y-B: 398 V B-R: 398 V
R LV1: 3.2 A Y LV1: 3.7 A B LV1: 3.2 A
Measured Current on HV side
R LV2: 3.2 A Y LV2: 3.6 A B LV2: 3.2 A
Measured Short Circuit Current on LV side WDG-1: 290 A WDG-2: 287 A

VECTOR GROUP TEST


Short U1-U2 and Applied 440V on Primary Winding
WDG-1 WDG-2
U1U2: 0.229 V1U2: 398 W1U2: 393 U1U2: 0.269 V1U2: 397 W1U2: 393
U1V2: 4.63 V1V2: 394 W1V2: 393 U1V2: 5.09 V1V2: 393 W1V2: 393
U1W2: 4.83 V1W2: 394 W1W2 389 U1W2: 4.87 V1W2: 393 W1W2 389

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD
Sheet 2 of 2
VI-SOP-O&M-02
VI-IMSP-O&M-01-F02
TEST REPORT OF TRANSFORMER
Client: MITARSH ENERGY PRIVATE LIMITED
Project: 20MW GLOBUS STEEL & POWER PRIVATE LIMITED - NATARAM
Equipment Location: INVERTER STATION – 09 INVERTER DUTY TRANSFORMER
Test Completion Date: 20/03/2023

RATIO TEST
Applied Voltage on HV side
@ LV WDG-1 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
@ LV WDG-2 TEST R-Y: 402 V Y-B: 398 V B-R: 398 V
Measured Voltage on LV side
WDG-1 WDG-2
Tap Tap
R-Y Y-B B-R R-Y Y-B B-R
Position Position
1 4.40 4.36 4.40 1 4.40 4.36 4.41
2 4.51 4.46 4.51 2 4.50 4.46 4.51
3 4.61 4.57 4.62 3 4.61 4.57 4.62
4 4.73 4.69 4.73 4 4.72 4.68 4.74
5 4.84 4.80 4.84 5 4.84 4.80 4.85
6 4.97 4.92 4.98 6 4.97 4.92 4.98
7 5.10 5.05 5.11 7 5.10 5.05 5.11
8 5.25 5.19 5.25 8 5.24 5.19 5.25
9 5.39 5.33 5.39 9 5.38 5.33 5.39

MAGNETIC BALANCE TEST


Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-1) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.2 2.0 3.3 399 336 87
B Phase Out
Y-B: 398 V
4.4 4.0 0.4 222 394 171
R Phase Out
B-R: 398 V
2.5 5.4 2.9 16 379 394
Y Phase Out
Supply Voltage Voltage Measured on Secondary Side Voltage Measured on Primary Side
(WDG-2) R’-Y’ Y’-B’ B’-R’ R-Y Y-B B-R
R-Y: 402 V
5.1 2.0 3.3 398 335 88
B Phase Out
Y-B: 398 V
4.4 4.0 0.4 221 393 171
R Phase Out
B-R: 398 V
2.5 5.4 2.9 15 378 393
Y Phase Out

MAGNETIZING CURRENT TEST


R Phase: 2.8 mA Y Phase: 2.6 mA B Phase: 2.0 mA

REMARKS:
TRANSFORMER TESTED – OK
TR PROTECTION EQUIPMENT SIMULATION MARSHLING BOX TO PANEL CHECKED

Tested By: Witnessed by: MITARSH Customer Rep: GLOBUS STEEL MEERA ENERGY
LOKENDRA J. ENERGY PVT LTD & POWER PVT LTD SERVICES
Prepared By:
AMIT RATHOD