Cable Test Report
PROJECT 50MW SOLAR PV PROJECT,Bhadla Page 1 of 1
CLIENT M/s Azure Power Date :12/03/2019
CUSTOMER M/s GE T&D INDIA LTD
1. GENERAL DETAILS
Make:- APAR Rating:- 33 KV
From :- MCR-1/0UT GOING-1 Length:- 2500 Meters
To:- 9A PSS
2. INSULATION RESISTANCE TEST
Applied voltage: - 5000V DC Duration: - 60s
PHASE REF. UNIT BEFORE HIPOT AFTER HIPOT
R1 – E GΩ 80.7 62.0
R2 – E GΩ 10.7 8.59
Y1 – E GΩ 57.0 63.8
Y2 – E GΩ 26.2 32.5
B1 – E GΩ 59.8 42.2
B2 – E GΩ 76.6 59.0
3. DC HIGH POTENTIAL TEST
Applied voltage: - 55 KV Duration:- 1 min
LEAKAGE CURRENT IN mA
PHASE REFERENCE RESULT
STARTING ENDING
R1 – E 0.4 0 WITHSTOOD
R2 – E 0.4 0 WITHSTOOD
Y1 – E 0.3 0 WITHSTOOD
Y2 – E 0.4 0 WITHSTOOD
B1 – E 0.5 0 WITHSTOOD
B2 – E 0.5 0 WITHSTOOD
CABLE IS FIT FOR CHARGING YES NO
Tested By: Witnessed By: Witnessed By: Verified By:
Mr Mr Mr.
Signature: Signature: Signature: Signature:
Snipe Engineers Pvt. Ltd. GE T&D INDIA LTD Azure Power