LV Busduct Test Report
LV Busduct Test Report
1. Ensure the LV Bus Duct mechanical & electrical installation correctly done
2. Check the all components are properly mounted.
3. Check that cable & wire are connected correctly.
4. Check clearance and tightness of all termination points.
S. No Details Result
5.1.1 Dimensions Check Passed
5.1.2 Size of Main horizontal Busbars
5.1.3 R, Y, B Phase identification Passed
Check Firmness of connection- in Torque Wrench
5.1.4
method
5.1.5 All bolts fixing
5.1.6 Make, rating and type of components
5.1.7 Identification of components Passed
Check the Proper Tightness of Bus-bars- in Torque
5.1.8
Wrench method
5.1.9 Arrangement as per the Drawing Passed
Tested by Witnessed by
Date Date
-6-
5.2 Continuity test
1 R-E
R Passed
2 Y-E
Y Passed
3 B-E
B Passed
4 N-E
N Passed
5 -E -
Tested by Witnessed by
Date Date
-2-
5.3 Insulation Resistance Test
1. Ensure that the panel/circuits under the test are isolated from the supply.
2. Isolate incoming and outgoing supply cables related bus duct.
3. Connect the Megger leads to the bus through any end outgoing feeder
terminals as listed in the below table with respect to the individual test.
4. Apply 500 V DC voltage through Megger.
5. Note down the reading after I minute as per the below table.
Tested by Witnessed by
Date Date
-8-
5.4 Hook & Bolt connection Test
Tested by Witnessed by
Date Date
-9-