Cable From :
Cable To :
Cable Size :
Cable Length:
Runs per Phase:
Make:
Drawing Ref:
Remarks:
VISUAL INSPECTION
Description
Checked
1.
Cable data matching with project specification.
2.
Check both ends.
3.
Check cable supports shield grounding, glanding &
terminations.
4.
Check the bending radius meet with prescribed values.
5.
Check for proper identification and supports.
Page 1 of 4
Remarks
2.1
SITE ACCEPTANCE TESTS
CONTINUITY TEST:
Cable Details
Status
RESULT:
REMARKS:
2.2
INSULATION RESISTANCE TEST:
Cable Details
Description
Applied Voltage
Time
Duration
Before HIPOT
Page 2 of 4
R (Y+B+E)
Y (R+B+E)
B (R+Y+E)
After HIPOT
RESULT:
REMARKS:
2.3
HIGH VOLTAGE TEST:
Cable
Details
RESULT:
Voltage
Applied
Phase
Earth
Y-B
B-R
R-Y
Leakage Current (A)
1 min
Page 3 of 4
2 min
3 min
5 min
10 min
15 min
REMARKS:
Page 4 of 4