FAT Test Report

Project Name: Panel Name:


Project No.: Date:
Job order: Panel Barcode:

Doc. No. :Astrolabe.Jo-QMSF-51/14-R6 Page (1 / 2)


TIGerDoc® Generated Document
Official Only When Properly Signed / Stamped
1.VISUAL INSPECTION: Remarks
Check general dimension of electrical panel, general specifications as per
1.1
drawings, fixing method, etc.  
1.2 Check components in the panel against the BOQ.
Check for the position of all installed device according to the approved
1.3
drawing.  
1.4 Check the paint adhesion, color of finish.
Check for the location and correct fixing of all nameplates, labels and
1.5
warning signs.
1.6 Confirm for any damaged pieces, defective material.
1.7 Confirm general arrangement.
1.8 Check the panel barcode on its specified location.
2. MECHANICAL INSPECTION: Remarks

2.1 Check all copper connections. This includes busbar and busbar supports.

2.2 Check wiring and fixing method.  


Check busbar support fixings and busbar connections. Check bolts torque  
2.3
required.
 Bolts
  M6 5-10 N.M  
M8 20 N.M  
M10 40 N.M  
M12 70 N.M  
Check for all draw our breakers/device installation and removing.  
2.4

Check for Proper functioning of all operating mechanisms including


2.5
doors, hinges and looks.
 
2.6 Visual check for IP level
3. ELECTRICAL INSPECTION: Remarks
3.1 Check continuity of all wiring according to the wiring diagram.  

3.2 Check all breakers rating and position according to the drawing.  

3.3 Check the operation of all breakers.  


3.4 Check the continuity of all.  
Check the rating and position of all installed devices according to the  
3.5
drawing.
3.6 Check earth bonding.  
4. TESTING:
a. Insulation Test: Remarks
Quality Control Engineer: Signature:
Switch off control breaker to isolate the circuit to prevent damage to the  
4.1
instruments.
Testing
4.2 Technician:
Switch on all circuit breakers and fuses. Signature:  
 
Inject 2500 for 60 sec between Phase to Phase, Phase to Neutral, Phase to
4.3:Astrolabe.Jo-QMSF-51/14-R6
Doc. No. Page (2 / 2)
Earth, and Neutral to earth.
TIGerDoc® Generated Document
Official Only When
b. Insulation Properly
Test Signed / Stamped
Results:
Phase A Ω Phase B Ω Phase C Ω