Inspection Service Order

Rig No.: 269 ISO No.: 269-2022-014


Date: 7-Mar-2022 Issued To: SGS

Equipment Make & Applicable


No. Asset No. Equipment Name Serial No. Scope Of Work
Model Standards

This Category IV inspection should be performed in a suitably equipped workshop.


-Perform all steps outlined in the rotary table Category IV inspection.
-Completely disassemble, clean and inspect the Rotary Table components. Check
the housing, case, mounting pad eyes, alignment blocks, gear set, and upper load
carrying bearings, and bearing mountings, for excessive wear, cracks, deformation,
corrosion and other flaws. NDT/MPI inspect all the rotary table load carrying
components.
-Remove the solid bushings.
1 049684 Rotary Table National Oilwell / D-375 H4274 - Measure the ID of the turn table bore in (2) two locations. Measure at 12;00 to 6:00 API RP-7L
and 3:00 to 9:00 and record these measurements on the rotary table bore
indicator in Ivara. These measurements need not be done in exactly the same place
year after year. Pay special attention to the lower part of the bowl where
the material thickness is minimal.
- Measure the backlash. Take several digital photographs of the areas that were
inspected.If all of the rotary table components are within manufacturer's allowable
wear guidelines assemble following the steps shown in the service manual.

Perform a magnetic particle inspection of all major components. Complete a detailed


2 046002 Master Bushings Varco / Split Type 6601-1 report of the results of the magnetic particle examinations for each piece of API RP 8B
equipment inspected.

Perform a magnetic particle inspection of all major components. Complete a detailed


062104 Casing Bushing Varco / Split Type 10187 report of the results of the magnetic particle examinations for each piece of API RP 8B
equipment inspected.
046003, 046004,
Perform a magnetic particle inspection of all major components. Complete a detailed
063870, 063871,
3 Insert Bushings ##1,2,3 Varco N/A report of the results of the magnetic particle examinations for each piece of API RP 8B
049699, 049700,
049698, 049697, equipment inspected.
Perform a magnetic particle inspection of all major components. Complete a detailed
4 N/A Bushing Puler Varco 93460 report of the results of the magnetic particle examinations for each piece of API RP 8B
equipment inspected.

Note:
• Service shall be performed by qualified personnel only.
• For NDE inspectors Level 2 is the minimal requirement.
• Inspection reports shall be submitted to Parker Drilling within 5 working days after the inspection has been finished

The scope of work is understood and agreed upon.


Rig Manager: Bernard Langan Service Company Authorized Representative:

Signature/Print Name Signature/Print Name

Document No: QF-0401-KRD-F001Document Name: Inspection Service Order FormApproved by: B. Musgrove Rrevision No.: 0Date Effective : 7-Jul-2013 Page 1 of 1