Professional Documents
Culture Documents
Note:
• Service shall be performed by qualified personnel only.
• For NDE inspectors Level 2 is the minimal requirement.
• Inspection reports shall be submitted to Parker Drilling within 5 working days after the inspection has been finished
Document No: QF-0401-KRD-F001Document Name: Inspection Service Order FormApproved by: B. Musgrove Rrevision No.: 0Date Effective : 7-Jul-2013 Page 1 of 1