A. Coordination
1. MHIESP secured a work permit and discussed related concerns on the equipment.
1.1. Discussion with the owner representative related to the equipment and procedure of the maintenance work.
B. Maintenance Work
1
C. Checklist
1. Busbar and Power cable connection torque table
· For replacement of ComAp IV18 Display at Master Panel with UPS system to have separate supply from genset.
E. Remarks
· Synch panel PM and testing was completed and monitored, no untoward problem during the last testing.
Synch panel working normal at all function mode.