Professional Documents
Culture Documents
20 Jan 2021
Contractor Consultant
Description Inspector Inspector Remarks
Yes No N/A Yes No N/A
All MV Cables should be left grounded when not on test, during the
4
testing of other Cable, until completely discharged.
C TEST RESULTS
Cable Reel/PC Number Cable type Cable length Shield Resistance (Ω) Fail Re-Test Date
Temp.
MEASURED INSULATION RESISTANCE (MΩ)
Adjusted
Cable
Insulation Pass Fail Re-Test date
Reel #
Resistance R-Y Y-B B-R R-N Y-N B-N R-G Y-G B-G N-G
(MΩ)
REMARKS:
Page 2 of 3
Attachement-01(IR & Continuity Form)
Cable Megger
Cable
Cable Size Cable Type Voltage CONNECTION Results in
Identity
Rating Megohms
B CONTINUITY/PHASING CHECK