2. Location: Groin A
TPDP02Inspectionsheet/07-Nov-22/Rev03
Toamasina Port Development Project, Package2
Groin A - 100-500kg Slope trimming inspection_+280.00 to +250m NS
Inspection reference: P2C-PD-IS-BN 9-0267
Point X Y Z
OCG 13 7993626,619 332794,376
ILS 7 7993588,128 332787,772
R0 7993708,511 332771,892
250A-1 -1,00
250A-2 -2,50
250A-3 -4,79
+260.00
260A +0,50
260A-1 -1,00
260A-2 -2,50
260A-3 -4,75
+270.00
270A +0,50
270A-1 -1,00
270A-2 -2,50
270A-3 -4,74
+280.00
280A +0,50
280A-1 -1,00
280A-2 -2,50
280A-3 -4,71
LA R
LE BATEAU
REA EC
IVRE
5.29 300
4.00
28 29
5.02
5.02
27
511
511
23 24 25 26
19 20 21 22
7467-P2-PD- S-3108-A 17 18
AUXIMAD
2.00
13 14 15 16
9 10 11 12
5.01 5 6 7 8
1 2 3 4
0
5.03
S=1:4/3
5.07 Tetrapod
S=1:4/3
4.79 Tetrapod 8 ton S=1:4/3
5.14
5.22 S=1:4/3
THIS DWG Tetrapod 8 ton +3.50m
5.27 280A
3F
+3.50m 240A 250A 260A 270A
QUAY
230A +3.00m
DARSE
1F
5.74
QUAY 4F
QUAI 4F
SHERRITT
5.41 +3.00m +3.00m
QUAI AMBATOVY
5.27
2.25
102
road
excavated armor rocks. Level to match the existing
GALANA
AMBATOVY
QUAY 5F
GALANA
BUREAU
PLATE FORME1
5.35
QUAI GALANA
Existing road
B1
TUYAU
BUSE = 0.60
FLOOR-MILL
S=1:1.5
Armor Stone 2~3 ton Armor Stone 2~3 ton +3.50m
BUSEO=0.40H
0.50
GRUE PORTELINO
BUSE = 0.80
S=1:1.5
SAVONNERIE CUIVE
PARC
POIDS
wc
4.51
A VEHICULE
LOURDS
5.27
wc
5.63
WC
SAVONNERIE
BUSE
O=0.60
HOLCIM
SAVONNERIE TROPICALE
H=0.75
JOVENA
5C
6A
d'incendie
Bouche
280m 290m
CONTENEUR
ENROCHEMENT
6B
270m
FRIGORIFIQUE
+3.00m
+3.00m
220m
1:2
5.25
GROIN A - PLAN VIEW
Scale 1:1000
COORDINATES
POINTS EASTING NORTHING
250A 333044.757 7993655.337
260A 333054.753 7993655.637
270A 333064.748 7993655.937
280A 333074.744 7993656.237
3980 2100 3520 3050 2000 2000 5400 3675 11735 4005 2100 3495 3000 2000 2000 5400 3675 11755
FILE LOCATION D:\GROIN A\100-500 NORTHSIDE\GROIN A 100-500-INSPECTION STA 250-280 - North Side.dwg/DATE: vendredi 10 novembre 2023 10:17:07 /BY:Standard
+3.50 +3.50
Armor Stone 1~2 ton +3.00 Armor Stone 1~2 ton +3.00
1500
1600
1500
1600
Cap Concrete Cap Concrete
00
1:1
00
/3 +1.40 / 3 +1.40 1:1
16
1:4 .5
16
Arm 1:4 Arm .5
1000
1000
900
900
250A +0.50 or 260A +0.50 or
0
Sto Sto
0
90
90
Ru ne Ru ne
bb 2~ bb 2~
00
le
00
/3 3 le
on Sto 3t
10
on 3 Ru Sto
10
Ru ton /
d8
t 1 :4 bb ne t 1:4 bb ne on
po 250A1 -1.00 Rubble Stone 100kg~500kg le 10 d8 260A1 -1.00 Rubble Stone 100kg~500kg le
Sto 10
tra
Sto 0-5 po 0-5
Te ne 00 tra ne
1-7 Kg Te 1-7 00
30
0K Kg
30
0K
00
-2.50 g
00
3000
15
15
00
00
1500
1600
1500
1600
00
/3 +1.40 1:1
1:4
16
.5
00
1000
1: 4 .5
900
Arm or
1000
280A +0.50
900
0
or Sto
90
270A +0.50 Ru ne
0
Sto
90
Ru n e2 bb 2~
00
bb 3 Ru le 3t
on Sto
10
~3 /
00
le
on /3 Ru Sto 8t 1:4 bb ne on
10
ton -1.00 le
8t 1:4 -1.00
bb
le ne od 280A1 Rubble Stone 100kg~500kg Sto 10
od 270A1 Rubble Stone 100kg~500kg Sto 10 et rap ne 0-5
ap ne 0-5 T 1-7 00
etr
30
T 1-7 00 0K Kg
30
00
0K Kg -2.50 g
00
-2.50 g 280A2
270A2
3000
3000
15
15
00
00
280A3 -4.71
270A3 -4.74
Legends :
CODE 1 : Consent granted - Construction may proceed
REPUBLIC OF MADAGASCAR TOAMASINA PORT DEVELOPMENT PROJECT PACKAGE NO.2
CODE 2 : Consent granted except as noted - Make changes DRAWING GROIN-A RUBBLE STONE 100-500KG
and re-submit - Construction may proceed as noted TITLE DATE :
S00 09.12.23 FOR INSPECTION ST TNT TS PLAN VIEW & SECTION
CODE 3 : Rejected - Correct and re-submit
CODE 4 : Review not required Construction may procced Rev DATE Description Société du Port à Gestion DRAWING N°