You are on page 1of 3

INSPECTION & TEST PLAN(ITP)

ITP Subject: Project: Project ID: Revision Number:


HDPE Drainage Design & Build Of External Works For Landscape, Document Ref. No.
Pipe Installation Irrigation Network, Car Parking & Services At Lusail P-16-26-DB-02
Works (Al-Daayan Area) 00

INSPECTION & TEST PLAN(ITP)


ITP Subject: Project: Project
Inspection & TestID:
Code Revision Number:
Item Inspection Test Control & Type Of HDPE
Acceptance Criteria Drainage
Frequency Of Design & Build
Responsible Of External Works For
Verification RecordLandscape,
(R,S,W,H) Document Ref. No.
No: Activity Reference Control PipeInspection/Testing
Installation Irrigation
Person Network, Car Parking & Services At Lusail
UI-JV AA P-16-26-DB-02
3RD Party
Document Works (Al-Daayan Area) 00
A
Required Documents & Submittals

A.1 Construction QCS 2014/Sec Approval Approved By As Per Activity PM, CM,QC Submittals H H N/A Inspection & Test Code
Drawings 1/Part/CL.7.14 Supervising Item Inspection Test Control & Type Of Acceptance Criteria Frequency Of Responsible Verification Record (R,S,W,H)
Consultant No: Activity Reference Control Inspection/Testing Person UI-JV AA 3RD Party
Document
±10mm width, dept.
A.2 Method QCS 2014/Sec Approval Approved By C.2 As Per
Excavation
Activity& PM, CM,QC Submittals AS Per Approved
H Hand pipe
N/Abedding 95% PM, CM, QC, Inspection Request H H N/A
Statement 1/Part 7/CL Supervising Formation QCS 2014 Inspection IFC/Shop Drawing & compaction in All Survey
7.14 Consultant Level Of The Section 8,Part Method Statement Trenches Prior To
Trench 2/2.2 & Excavation Permit Geotextile & Bedding
Material QCS 2014/Sec
A.3 Submittals 8, part 4,Part Approval Approved By Prior To Start Of The PM, CM,QC Submittals H H N/A
2/2.3.1, 2.3.3, Supervising C.3 Work
Wrapping Of QCS 2014/Sec Inspection Approved Drawing Visual Inspection PM, CM, QC Inspection Request H H N/A
2.3.4, QCS Sec Consultant the Geotextile 8,Part 2/2.3.3 & Method
2 Part 2 Statement

C.4 Pipe Bedding QCS 2014 Sec 8 Approved Drawing 20mm size of PM, CM, QC Inspection Request H H N/A
B Material Delivery At Site
Of Trench ,Part 2/2.3.1 Inspection & Method material, All trenches Survey
Table 4.2.1 Statement
Check For the Materials Inspection
D Pipe Laying
B.1 Material QCS 2014 Inspection As Per The Prior To Start Of The PM, CM, QC request/ Delivery Note H H N/A
Deliver(HDPE,G Section 8 Approved Material Work
eotextile, Pipe QCS 2014 Sec 8 Approved Drawing
Backfill) D.1 Installation & ,Part 4 /4.2.1 Inspection
& Method All Trenches Prior To PM, CM,QC & Inspection Request H H N/A
Trench Excavation Jointing Statement & Survey Inspection Survey
C ITP(Fusion Joint Test
C.1 As Per QCS 2014
Setting Out & QCS 2014/Sec AS Per Approved ±10mm.
Check For Pipe PM, CM, QC, Inspection Request H
Coordinate & Level H N/A
Trench 8/Part 2/2.2 Inspection IFC/Shop Drawing D.2
& All Top
Trenches Prior
Level & To Survey
QCS 2014 Sec 8 Inspection In Accordance With ±10mm. PM,CM, QC & Inspection H H N/A
Alignment Method Statement Excavation
Alignment ,Part 4 /4.2 Approved Drawing All Trenches Prior To Survey Request/Survey
Backfill Surround Inspection Records
Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control
Compliance With
D.3 Butt Fusion QCS 2014 Sec 8 The Approved IFC, PM, CM, QC Inspection Request H H H
Jointing ,Part 4 Cl. Inspection Shop Drawing& Each Location
4.3.8 Method Statement
INSPECTION & TEST PLAN(ITP)
ITP Subject: Project: Project ID: Revision Number:
INSPECTION & TEST PLAN(ITP)
Design & Build Of External Works For Landscape, Document Ref. No.
HDPE Drainage ITPServices
Irrigation Network, Car Parking & Subject:At Lusail Project: Project ID: Revision Number:
P-16-26-DB-02
Pipe Installation (Al-Daayan Area) 00
Works HDPE Drainage Pipe
Installation Works Design & Build Of External Works For Landscape, Irrigation
P-16-26-DB-02 Document Ref. No. 00
Network, Car Parking & Services At Lusail (Al-Daayan Area)
Inspection & Test Code
Item Inspection Test Control & Type Of Acceptance Criteria Frequency Of Responsible Verification Record (R,S,W,H)
No: Activity Reference Control Inspection/Testing Person UI-JV AA 3RD Party
Document Inspection & Test Code
Item No: Inspection Test Control & Type Of Control Acceptance Criteria Frequency Of Responsible Verification Record (R,S,W,H)
Layers Of Not 20mm Size Material,
Activity Reference Inspection/Testing Person UI-JV AA 3RD Party
D.4 Pipe Surround Greater than Each Layer, Visual PM, CM, QC, Inspection H H H
Document
QCS 2014/Sec Inspection 150mm, Light Inspection Survey Request/Checklist
8, Part 2/2.3.2 E.3
Compaction Continue
With Pipe QCS 2014 Inspection Approved Drawings & All Pipe Section PM,CM,QC Visual Inspection W W N/A
Surround
Plate Compactor Backfill Section 8, Part Material Approval
Till 30cm Above 2/2.3
D.5 Pipe Bedding QCS 2014 Sec 8 The
Approved Drawing Crown Of
20mm size of PM, CM, QC Inspection Request H H N/A
Of Trench ,Part 2/2.3.1 Inspection & Method Pipe material, All trenches Survey
Table 4.2.1 FStatement Backfilling Of Trench
QCS 2014 Lab Test Approved Drawing, 1 Test Every 30m Of PM,CM,QC Inspection
Section 8, Part Nuclear Density Method Statement, Min Trench Length Each Request/Checklist H H H
F.1 Compaction Test 2/2.3.4, QCS Measurement 95% Of MOD & +/- 2% Of Layer
2014 Sec. 6, Test(NDMT) MC
Part 03, CL.
3.6.7/2,3
PREPARED BY CHECKED BY APPROVED BY
Name Name Name
Signature Signature Signature
Date Date Date

Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control
Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control