KNPC ZOR Project

Concrete Placement Inspection Checklist


P055BZOR-0051-Q-405
Rev.: O, 09-Aug-16

Tag No: N/A Tag Description: Concrete Placement Inspection


TOS No: N/A TOS Description: Concrete Pouring On Site Temporary Fence EPC # 2 Area
CWP: N/A PO No.: L9ZR-FI-00-K008
ITP Ref. No.: HUTC-FDH-K008-ITP-003 Rev 0 Subcontractor: Al Hana United Gen Trad & Const Co
Insp. Request No.: 0025 Drawing Ref.: N/A

Inspection Result
Description of Activities Remarks
Accept Reject N/A

Verify concrete complies with approved


1 √      
design mix

2 Check all field tests have been carried out √      

3 Check concrete is not re-tempered √      

Check vibration has been carried out


4 √     Manual with Steel Rod 
properly.
Check preparation of surface has been
5 √      
carried out properly
Check the placement and free drop
6 √      
conforms with specifications
Check the formed surface have been
7 √      
finished as per specification

           

 REMARK : On Site Temporary Fence Concrete Pouring on EPC # 2 EPC # 2 Area

Description Subcontractor Contractor Company

Name Shaik Hassin

Signature

Date 30-Nov-2016

Page 1 of 1