You are on page 1of 1

COSMO INFRASOLUTIONS

PROJECT: NXTRA DC, Mahape


Field Quality Record
Check List for Inspection of Plastering

Name of work : Location:

Type of Plaster - Ready Mix Plastering Cement Sand mortar plastering

a) No. of Coats and Thickness

Surface: External / Internal Level:- FROM TO

c) Finishing required

d) Addition of Water proofing admixtures as applicable


Name of Contractor- Date:
Satisfactory Remarks
Sl.No. Item
Yes No NA

A Pre-Application Check

1 Surface preparation for Plastering

2 Joint in Masonry and surface before plastering

3 Dampness of Base surface before plastering

B During Application Checks

4 Materials:

4.1 Cement

a) Type of Cement

b) Quality of Cement

4.2 Sand

a) Type of Sand & Source, Sieve analysis done

4.3 Added water qty per bag

4.4 Water Proofing Admixture Quality

5 Scaffolding: Single / Double

C Post Application checks

6 Line, Level,Plump & Surface finish

7 Curing:

7.1 After Scratch Coat (7 days)

7.2 After Base coat (7 days)

7.3 After finishing coat (7 days)


Remarks :

COSMO-Execution COSMO-FQE NXTRA/T&T -Representative