FORMWORK INSPECTION (Part-1 of 2)

Project :
Location :
Date :
SL. Description Inspection by Inspection by Remarks
No. Project In-charge Checking Team
(Internal) In-Charge
(External)
Grade Sign Grade Sign
1 Ground-level well compacted &
leveled including at periphery
2 Well & adequate bottom bearing
wood planks used below props
properly & tightened
3 Staging wood planks well & adequate
4 All leveled props are in the same
aligned
5 Iron nails are properly fixed at each
level
6 Each staging level has been done for
easy human entering
7 Spacing of
- Bamboo prop@ 600mm/2’C/C
- Steel prop@ 750mm/2.5’ C/C
8 Tightening of prop
9 Both direction lateral bracings of
props: Used necessary lateral bracing
to be tightened by 10/12mm Rod with
jute rope at the earlier specified levels
10 Vertical cross-bracing provided/ tied
with rope at periphery props: Used
necessary cross bracing if the clear
height is more than 12’, to be
tightened by 10/12mm Rod with jute
rope
11 Spacing and size of well/ adequate
planks in slab
12 Spacing and size of the runner in slab
13 Horizontal & vertical alignment &
level of beam
14 Horizontal alignment & level of the
slab, 4mm/m camber*** to be
counted.

FORMWORK INSPECTION (Part-2 of 2)


15 Additional support/ safety
precautions taken under the roof
winch/load pick-up equipment if
necessary
16 Additional support/ safety
precautions were taken for the ready-
mix concrete pump pipes fittings/
power trawling if necessary
17 Forms are cleaned
18 Leaks in form ensured by foam/
masking tape as necessary
19 Joint in form covered with thin
Rupban sheet cutting if applicable
20 Form oil used/Burned Mobil +
Diesel
21 Fixing of column
- Turn bolt
-Bolt
-Prop strut
- Nuts and bolts for fixing
22 Vertical and diagonal adjustment of
the dimension of column maximum
3mm allowable.
23 Maintenance of good housekeeping
around the working area and
passages
24 Guarding peripheral edges and floor
openings
25 Removal of defective props.

Approval

Grades of work: A= Good; B= Need Rectification; C= OK Rectification


Special Notes:
1. Concrete stacking/ mounding on shuttering during casting is not allowed.
2. Vibration and impact due to passing traffic, movement of workers and equipment on
formwork, and vibration because of concrete consolidation must be controlled as per
requirements
3. Ensure the presence of at least 3 nos experienced workers below shuttering keeping a
continuous watch during casting for checking dangerous situations/ variations/ loose
props/ leakage etc. if any
4. Safety training is a must for the workmen involved in formwork and concreting works
before casting
REBAR INSPECTION FORM
Project :
Location :
Date :
Sl. Description Inspection by Inspection Remarks
No. Project In- by
charge Checking
(Internal) Team In-
Charge
(External)
Grade sig Grade Sig
1 Form work cleaned and
oiled
2 Size of Rebar as per
drawing
3 Spacing of Rebar as per
drawing
4 Number of Rebar in
column or Beam as per
drawing
5 Clear cover in
Reinforcement
6 Provision of Mortar Blocks,
Chairs sufficient
7 Tying of rebar with 24G
wire (in each & every joint)
8 Horizontal alignment of
rebar
9 Cleaning of rebar from rust,
mud or grouting
10 Lap Length accurate
11 Any crack or injuries detect

12 Number of rebar counting


In slab
13 Stirrup Spacing of beam in
vertically & equal spacing
14 Re-bar crank for slab or
beam to be 45° to 60°
12 Others (Pl. Specify)

A- Good for Next Operation.


B- Needs Rectification.
C- Good after Rectification.
CHECKLIST FOR CONCRETING WORK
Before construction/ Casting
Sl. Item to be checked Yes/No Inspection by Remarks
No Project In- Checking Others
charge. Team In-
(Internal) Charge
(External)
01 Proper cleaning of shutter
02 Vertical horizontal
alignment & level of
shuttering work.
03 Proper sealing of
shuttering joints, cobla etc
04 Check the placement &
fixation of props.
05 Scaffolding & safety where
necessary.
06 Placing binding & spacing
check of Reinforcement
according to the drawing.
07 Clear cover of
reinforcement.
08 Check the ties, stirrups,
lapping, cranks, hooks &
all of its proper fixing.
09 Measurement of
reinforcement & electric
conduits before casting.
Ensure presence of
electrical/ mechanical
engineer if needed.
10 Quality & stock of cement
& other aggregates.
11 Mixture machine in good
condition.
12 Vibrator nozzle & machine
is in good condition. Spare
nozzle is available.

CHECKLIST FOR CONCRETING WORK (Contd….)


During Construction:

01 Spray the water on surface


of steel shutter.
02 Clear cover confirms
bottom & top layer from
M.S. Bar.
03 Vibrating properly in
vertical placement of
vibrator.
04 Vibrating grid system on
slab surface.
05 Electrical conducting check
ensure in proper place.
06 Top level of concrete must
be same level.
07 Take level each 3’- 0”
interval over the concrete
slab and ensure the slab is
perfect position.
08 AT MIXTURE MACHINE
LOCATION, SPECIFIC
PERSON FOR LOAD
COUNTING

09 In case of joint, fix it at


proper position and way
10 . Estimate the volume of
concrete and set the target
considering the capacity.
DO NOT allows
converting work at darks.

Special Notes:
 For large volume of casting, ensure two/ three engineers.
 Continue checking slump for pipe concreting.
 Water/ Cement ratio to be standard for good concreting.
 Use of all personal protective equipment (PPEs)
CEMENT CONCRETE POURING FORMAT

Project : ................................ Date: ......................


Location :............................. Time: ....................

Sl. No Description Signature


1 Start time
2 Finish time
3 Approximate Concrete Volume cft.
4 Mix Proportion (by volume)/Wt Jr. Engineer/
Engineer
5 Material Consumption
Cement Sr.
bag Engineer/AM
Aggregate. Stone Chips cf
t
Aggregate. Brick Chips cf
t
Coarse (Sylhet) Sand cft
Fine (Local) Sand cft
6 Mixing (concreting ) by
Ready mix
Electric Mixture machine
Diesel Mixture machine
Hand Mixing Counted by w.
A/ other
7 Reference concrete Pillar nos Checked by:
8 Reference Point for concrete top no Checked by:
surface s
9 Top Surface level Checked by:
10 Compaction Hand Vibrator
11 Cylinders (l set 1500 cft concrete) Taken by
12 Slump (1 of 500 cft concrete) Taken by
13 Remarks: