Construction of Jakarta Mass Rapid Transit Project
CONCRETE POUR CHECKLIST
LOCATION: IDENTIFICATION NO: STA : CONTRACTOR/SUBCONTRACTOR: TYPE OF ELEMENT: GRADE OF CONCRETE: Internal Check Conformance INITIALS DATE REMARKS Yes No C NC A. Survey And Rebar Check A1 Drawing Check A1.1 Drawing status approved for construction A2. Prepour Survey Check A2.1 Alignment of structure checked A2.2 Positon and Levels checked A2.3 Form work level / line / verticality / position checked A3. Rebar check A3.1 Bar dimension (dia, length) checked A3.2 Bar shape, bend checked A3.3 No. of bars checked A3.4 Position & spacing of bars checked A3.5 Rebar covers checked A3.6 Gap for vibrators checked A3.7 Security & cleanliness of bars checked A3.8 Splice length checked A3.9 Couplers and bar arrangement checked Internal Checked by: Conformed by : Verified by:
B. Formwork Accessories Check B1 Formwork B1.1 Cleanliness checked B1.2 Release oil application checked B1.3 Blockouts / openings checked B1.4 Form Tightness / Sealing checked B1.5 Staging for labour access checked B2 Support check B2.1 Support placed at appropriate location B2.2 Cross bracing placed to avoid shifting of formwork B2.3 Props (pipe support) positioned in right position B2.4 Props (pipe support) supported on compacted ground B2.5 The Support used to avoid the slurry leakage prepared B3 Dowel and tie bar check B3.1 Position, level, alignment checked B3.2 Dimension,spacing, no. of bars checked
C. During Concrete Check C1. Approved mix / supplier used C2. Slump, Temperature, Cube Sampling checked C3. Method of Tremie installation verified against MS C4. Concrete pump, pipes, hopper condition checked C5. Internal Vibrators - no., condition, gap checked C6. External Vibrators - no., condition, gap checked C7. Concrete drop height checked. (shoud be ≤ 1.5 m) (Tick both boxes if initial inspection is unsatisfactory) NCR: Non Conformance Report C: Complies NC: Not Comply Prepared and Conformed by TWJO Civil Engineer : Verified by:
Name : Signature : Name : Signature :
D. Post Concrete Check D1. Concrete surface finish checked D2. Curing checked D3. Concrete remedials checked (if applicable) TWJO-ITP-GEN-0003-CHK-001rev C Page 1 / 2 Internal Checked and Conformed by Civil Engineer : Name : Signature :