Witness
Sr. or hold Conformed?
Description Remarks
No. point? Yes / No
W/H
1 Material Testing
1.1 Are all materials tasted as per ITP? No
2 Execution
Remarks if any:
Checked By:
Name Company/Designation Signature
Verified By:
Name Company/Designation Signature
TWJO-ITP-EMB-0006-CHK-002 Page 1 of 2
TOKYU-WIKA JOINT OPERATION
Surface Section CP101 & CP102
Construction of Jakarta Mass Rapid Transit Project
TWJO-ITP-EMB-0006-CHK-002 Page 2 of 2