TOKYU-WIKA JOINT OPERATION

Surface Section CP101 & CP102


Construction of Jakarta Mass Rapid Transit Project

GEOGRID INSTALLATION CHECKLIST

Lot No: Date of Installation:

Layer number: Location:

Witness
Sr. or hold Conformed?
Description Remarks
No. point? Yes / No
W/H
1 Material Testing
1.1 Are all materials tasted as per ITP? No
2 Execution

2.1 Is the ground surface or layer clear from debris? No

Is the elevation of the ground or layer surface as per design


2.2 No
drawing or construction drawing?
Are position and length of geogrid as per construction or design
2.3 No
drawing?
Are the Geogrid laid flat on the underlying surface, pull taut with
2.4 No
wrinkles or folds?
Is nominal tension applied to the geogrid and mantained by
2.5 staples, stakes, or hand tensioning until the geogrid has been No
covered by at least 150 mm of structural fill?
2.6 Is geogrid used as one contineous piece? (no everlap permitted) No
Is there any movement of tracked vehicle over the geogrid? ( no
2.7 any movement allowed unless and until 200 mm thickness of No
backfill is used above it)

Is there any movement of rubber tire equipment over the geogrid? (


Rubber tire equipment may pass directly over the geogrid at 7.5
2.8 No
km/hour and sudden braking and sharp turning while passing
directly over the geogrid should be avoided.)

Remarks if any:

Checked By:
Name Company/Designation Signature

Verified By:
Name Company/Designation Signature

TWJO-ITP-EMB-0006-CHK-002 Page 1 of 2
TOKYU-WIKA JOINT OPERATION
Surface Section CP101 & CP102
Construction of Jakarta Mass Rapid Transit Project

GEOGRID INSTALLATION CHECKLIST


Verified By:
Name Company/Designation Signature

TWJO-ITP-EMB-0006-CHK-002 Page 2 of 2