1. Distribution is centralized - in this case through ACONEX. Any improvement suggestions should be forwarded to the
Quality Control Engineer
2. Each copy is issued to a particular person or organization.
3. Copy holders will be automatically issued with any amendments through ACONEX.
4. Photocopies of this document are uncontrolled and users should confirm validity inACONEX prior to use.
TWJO-ITP-E&M-0011 revA
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Project CP101&CP102 Inspection and Test Plan
Approval:
Jakarta Mass Rapid Transit Project CP101&CP102 Inspection and Test Plan
Contents
Cover Sheet
Revision History
Contents
Covered Scope Activity
Flow Chart
Inspection and Test Plan for Painting Pipe Works (CP101-CP102)
2. Checklist
TWJO-ITP-E&M-0011-CHK-0001 rev A Painting Pipe Works (Hydrant Pipe)
TWJO-ITP-E&M-0011-CHK-0002 rev A Painting Pipe Works (Sprinkler Pipe)
TWJO-ITP-E&M-0011-CHK-0003 rev A Painting Pipe Works (Water Supply Pipe)
TWJO-ITP-E&M-0011 revA Contents
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Project CP101&CP102 Inspection and Test Plan
Scope of this Inspection and Test Plan includes Material check, Position check, Rebar check,
Flexible Conduit check, formwork check, concrete check. The inspection work by QC Engineer of
subcontractor for Internal Inspection, checked by QC Engineer of TWJO and JMCMC Engineer as the
Acceptance for the Result of Inspection & Test Plan for this work item.
Tools of Inspection & Test Plan for Manhole Check Works are:
1. Measuring Tape
an instrument used to measure the distance or length. The meter is also useful for
measuring distance each rebar, check position and check dimension, (see in Picture 1)
Flow Chart
Start
Submit
Material Sample Approval (MSA), Revise
Method Statement (MS),
Inspection & Test Plan (ITP)
OK
Preparation Material
1. Pipe Surface Preparation
2. Painting Material Spec and Color Coding Repair
Not OK
OK
Painting Process Not OK
OK
OK
Not OK
Submit Request For Inspection (RFI)
OK
JMCMC and TWJO
Joint Inspection (Visual, and Thickness Check)
OK
End
TWJO-ITP-E&M-0011 revA
TOKYU-WIKA JOINT OPERATION
Surface Section CP101 & CP102
Construction of Jakarta Mass Rapid Transit Project
Subcont QC
Once Before Material sample Approval
1 Approval For Material Approved Material officer&TWJO Supplier Certificate P R R A
Procurement (TWJO-MSA-0130)
QC Engineer
2 Preparation Material
TWJO-ITP-E&M-
Subcont QC 0011-CHK-
Once Before Painting No Spatter, Mill Scale, Oil,
- Surface Preparation SSPC-SP-3 officer&TWJO 0001,0002,0003 P W I A
Process Grase and rust
QC Engineer Painting Pipe Works
Checklist
Subcont QC
Once Before Painting Material sample Approval
- Painting Spec Approved Material officer&TWJO Supplier Certificate P W I A
Process (TWJO-MSA-0130)
QC Engineer
Subcont QC
Once Before Painting Material sample Approval
- Painting Color Coding Approved Material officer&TWJO Supplier Certificate P W I A
Process (TWJO-MSA-0130)
QC Engineer
3 Visual Check
TWJO-ITP-E&M-
Subcont QC 0011-CHK-
Once After Painting Free of blister, sags, run and
- Painting Surface NA officer&TWJO 0001,0002,0003 P W W A
Process Porosity
QC Engineer Painting Pipe Works
Checklist
TOKYU-WIKA JOINT OPERATION
Surface Section CP101 & CP102
Construction of Jakarta Mass Rapid Transit Project
TWJO-ITP-E&M-
Subcont QC 0011-CHK-
Once After Painting Material sample Approval
- Painting Color Coding Approved Material officer&TWJO 0001,002,0003 P W W A
Process (TWJO-MSA-0130)
QC Engineer Painting Pipe Works
Checklist
Legends P: Perform R: Review I: For Information only H: Hold point W: Witness point NA: Not Applicable RW: Random Witness
Name: Name:
Signature: Signature:
All approved ITPs and related records shall be stored on TWJO server under Quality Assurance folder with a hard copy in office file.