1 Application of PSPC
4
1 Application of PSPC
5
1 PSPC General Principles
6
1 Coating works - IMO PSPC
7
1 Coating works - IMO PSPC
For a new construction
► These 7 main steps are to be considered at three main
phases:
Phase 1: Planning and specification of coating works
Tripartite agreement and basic technical documents
Phase 2: Performance of coating works
Coating work records by the qualified Coating Inspector
(CI)
Phase 3: Verification of records after the completion of
construction works
The Coating Technical File (CTF)
8
1 Coating works - IMO PSPC
IMO
2 PSPC
IMO PSPC -- Standard
International Coating
Coating Process
Process Definition and specification of the coating system
andstatement
issue Rule forofCPS Approval of the coating system request
compliance or TAC
Agreement on inspection procedures & plan
Inspection Agreement
Phase 1: Review of the Agreement between parties
Coating specifications Agree
Inspection Agreement (TechnicalCoating
data sheet & statement of
specifications
Coating specifications
compliance
(Technical
(Technical data or type
data sheets
sheets & approvalof
& statement
statement ofcertificate)
compliance
compliance or
or
TAC)
TAC)
review Inspection procedure & plan
Inspection procedure & plan
Shipyard
Phase 2: Verification of New Construction
compile
Phase 3: CTF Review Coating Technical File (maintained onboard)
Shipowner
system
• Coating technical data sheets
• Shipyard work records
• Inspection procedures
Coating inspection logs of CI
review •
• Shipyard inspection report verified by CI
13
2a Phase 1: Review of Inspection Agreement
14
2b Phase 2: Verification of PSPC implementation
– Coating Process
PSP
Primary Surface Preparation
Shop primer application
16
– Coating Process
1st Coating
17
– Coating Process
Surface treatment
Damage touch up
18
2b Phase 2: Verification of PSPC Implementation
19
2b Phase 2: Verification of PSPC Implementation
20
2b Phase 2: Verification of PSPC Implementation
21
2b Phase 2: Verification of PSPC Implementation
24
2c Phase 3: Review of the Coating Technical File
2c IMO PSPC BV Tasks/ Action
► CTF content
Coating log of CI
26
2c DFT measurements
► CTF content
-> 320 mu
-> 90/10 rule (90% of readings is > 320 mu AND none of the remaining 10%
readings is below 0,9 X 320 mu)
- 4 readings each 2 - 3 m on
profiles
- + more
27
2c IMO PSPC BV Tasks/ Action
30