Temperory diversion
(Tolerances for - Position: 100 mm in any direction at cut-off level; Vertiality: 1 in 75 deviation from vertical; Rake: 1 in 25
deviation from specified rake)
Is the excavation level for new culvert drainage verified by survey team?
Is the slump test carried out and slump found to be as per design?
TWJO-ITP-PRC-0005-CHK-001revB Page 1 of 3
TOKYU-WIKA JOINT OPERATION
Surface Section CP101 & CP102
Construction of Jakarta Mass Rapid Transit Project
TWJO-ITP-PRC-0005-CHK-001revB Page 2 of 3
TOKYU-WIKA JOINT OPERATION
Surface Section CP101 & CP102
Construction of Jakarta Mass Rapid Transit Project
Remarks:
Checked By:
(Subcon) Name Designation Signature
Verified By:
(TWJO) Name Designation Signature
TWJO-ITP-PRC-0005-CHK-001revB Page 3 of 3