Project Name & Details

CHECK LIST FOR Form No :


TOWER CRANE (TC-3) ERECTION AND MANAGEMENT Rev. No : 0
Page : 1 of 1
SUB CONTRACTOR CONTRACTOR Date :
SECTION OF WORK: CIVIL LOCATION: PI BUILDING
AREA……………………..…..
Level: As per approved method statement & Shop drawings ITR No:
Checked by Checked by
STAGE ITEM Date
S/C CONT Consultant
Check drawing / sketch as per catalogue.
APPROVALS
Check approved method statement.
Check layout and location of tower crane foundation.

Check level and coordinates of crane structure and


SETTING OUT concrete foundation.
Check the sleepers are laid in its correct position and are
aligned.
Check alignment base channel of crane structure fixed to
the foundation
Check assembling of crane structure work is completed.

Check operator cabin is properly fitted on its place.


ERECTION OF
TOWER CRANE Check access ladder is fitted.

Check all the bolts & nuts are fixed and tightened
properly.
Check precast concrete counter weight blocks are placed
correctly.

3RD PARTY Ensure 3rd Party inspection carried out and required test
INSPECTION reports / certificates are provided.

SAFETY Check all safety measures are taken during the erection
PRECAUTIONS and installation of tower crane.

For S/C QA/QC: Date: For CONTRACTOR QA/QC: Date: For Consultant Rep.: Date:

Name: Sign.: Name: Sign.: Name Sign.: