PROJECT NAME

CHECK SHEET FOR:


Form No. :
DRIVEN SHEET PILE WORK
Rev. No. :

SUBCONTRACTOR CONTRACTOR Page :

Section of Work: CIVIL – SITE WORKS Location:


Level:
Checked by Checked by
STAGE ITEM YES/NO DATE
S/C CONT. CONSULTANT

Document MS/ITP/Shop drawing/Method Statement


Verification are approved.

Setting out - Check setting out of sheet pile


centerline as per shop
drawing/method statement
- Check reference line and points as
per shop drawing/method statement
- Check driving guide of adequate
length
Equipment and - Vibro-hammer in working condition
Tools - Lifting crane of sufficient capacity and
boom length
- Weight unit (if any)
Driving process - Proper handling of sheet piles
- Check sheet pile penetration depth
following shop drawing/method
statement
- Check sheet pile verticality
- Check sheet pile interlock

For S/C: Date: For CONTRACTOR Date For CONSULTANT Rep. Date:
QA/QC:

Name: Sign: Name: Sign Name Sign: