You are on page 1of 26

UNNAO

PRAYAGRAJ PVT.
LTD
Salient Features of the Project
Project Expressway Length 156.847 Km [ start-445+000 to 601+847 End]

Service Road 185.697 Km [155.817 Km of width 3.75 meter & 29.88 Km of


width 07 meter]
Major Bridge & Flyover 2 No’s & 6 No’s in MCW and 2 Nos in Interchange

Minor Bridge 66 No’s in MCW, 77 No’s in SR and 3 No’s in Diamond


Interchange
Box Culverts & Hume Pipe Culverts 226 No’s & 33 No’s
Vehicular Underpass 16 No’s
Small Vehicular Underpass & Light Vehicular Underpass • 30 No’s in MCW and 2 No’s in Interchange
• 51 No’s
Toll Plazas 5 No’s : CH 487+285 -Double Trumpet (8 Lanes)
CH 517+708- Double Trumpet (8 Lanes)
CH 554+951- Ramp Plaza (2 Lanes Each)
CH 589+450- Toll Plaza (16 Lanes)
At Start Point of Group- IV- Additional Toll Plaza, as per
Concessionaire’s Discretion
EGIS

 We are Egis India. Here we are appointed by ADANI group for providing
consultancy services for independently carrying out surveillance inspection of
ongoing construction work to ensure compliance to quality of executed works at
various locations of Package 10 , Package 11 and Package 12 of Ganga
Expressway in the state of Utter Pradesh.
Scope of work

 scope of work is broadly classified as Inspection & approval on stage passes with
all QA documents as per specification i.e. for Roads layer like Embankment Top,
Subgrade Top, CTSB Top, WMM Top, wearing course and for Structures
Reinforcement checking, post concrete check, compressive strength checking at
28 days.
 • Inspection on calibration of all weight and measures, laboratory equipment’s,
plant’s (crusher, batching plant, wet mix plant, hot mix plant etc.) and maintaining
related assurance documents.
 • Review of daily production report, monthly quality reports and assure the
frequency of tests conducted as per the approved project ITP and specifications.
 • Consultant shall be responsible to check & approve minimum 10% in daily
construction activity
Egis Organogram:
 At Next Slide:
Team Leader
(Project Quality In-Charge)

Plant Support
Plant In-Charge
Engineer(3)

Package-10 Package-11 Package-12

Quality Lead Quality Lead Quality Lead


Highway Highway Highway

Quality Lead Quality Lead Quality Lead


Structure Structure Structure
Quality Lead Quality Lead Quality Lead
Material Material Material
Project Photos – Highway
FDD checking FDD checking of
of Subgrade Embankment 1st
1st layer; layer;
satisfactory Satisfactory

FDD checking of
Embankment 4th layer;
Not Satisfactory Checking of
FDD Checked and Reinforcement,
compaction found 92.01% shuttering and pouring
against required of concrete for Precast
compaction of 95% as per RE Panel (34 Nos.)
MoRTH Specifications.
Project Photos – Structure

Checking of Boring, Reinforcement, Cage


lowering and concreting of Working pile
Site Recommendation
Comments & Observation

 Reinforcement of cage checked and found satisfactory, Bentonite density


achieved 1.05g/cc.
 Checking of reinforcement, the shuttering which was in the line level and the
cover block was in place. According to dimension, length width was found to be
ok.
Project Photos – Structure

Checking of Checking of Reinforcement,


Reinforcement, framework and pouring of
framework and pouring concrete for Pre-cast Plank
of concrete for Pre-cast
box

Checking of
Layout, level and
Curing of Box culvert segment
laying of PCC for
Box culvert
Project Photos – Materials

Witness of CBR Testing at Site Witness of Proctor Test Soil Sampling of Borrow Area
Sample Ch 454+500; Barrow area no 204; Work Observations: Soil Sampling Done of Borrow
Satisfactory Area no. 243 and Sample Sent to Laboratory.
in progress
Project Photos –Plant

Checking production summary of previous day and same day production at RMC
Plant.

Checking the temperature of concrete.


PKG 10-Subgrade, CTSB ,WMM ,DBM and
Concrete Status Updated on 30.09.2023

 Total Subgrade tested qty (Pkg 10) - 27,13,236 CUM


 C.T.S.B Production -
2,23,591 MT
 W.M.M. Production -
98,067 MT
 DBM Production - 46,699 MT
 Concrete -
71,050 CUM
PKG 11-Subgrade, CTSB ,WMM ,DBM and
Concrete Status Updated on 30.09.2023

 Total Subgrade tested qty (Pkg 11) - 09,61,000 CUM


 C.T.S.B Production -
81,482 MT
 W.M.M. Production -
46,878 MT
 DBM Production - 22,706 MT
 Concrete -
71,459 CUM
PKG 12-Subgrade, CTSB ,WMM ,DBM and
Concrete Status Updated on 30.09.2023

 Total Subgrade tested qty (Pkg 12) - 10,77,500 MT


 C.T.S.B Production -
89,185 MT
 W.M.M. Production -
41,108 MT
 DBM Production - 17,449 MT
 Concrete - 59,673 MT
Site Instructions

S.NO Section QA/QC Highway Stucture

1
Package – 10 17 6 24

2
Package – 11 10 23 18

3
Package – 12 7 15 8
BORROW AREA

Sampling Qty in
Sr NO. Section Testing Qty
Cum

1. Package – 10 9568013 9101212

2. Package – 11 5767476 5662476

3. Package – 12 75,92130 6738130


STATUS OF MOBILIZATION OF PLANTS,
EQUIPMENT, MACHINERY &
MANPOWER
DETAILS OF MOBILIZATION OF MACHINERIES Mobilised as on date
Equipment Remark
S. No. Machinery Capacity UNIT
Mobilized s
Pkg-10 Pkg-11 Pkg-12

1 Crusher Plant 3 stage 300 TPH Nos 3 3 3 9

2 Hot Mix Plant 240 TPH Nos 1 0 1 2

3 WMM Plant with CTB / CTSB 200 TPH Nos 2 2 2 6

4 Cement Silo 100 Ton Nos 6 5 5 16

5 Fly Ash Silo 100 Ton Nos 2 2 2 6

6 Sensor Paver DBM/BC 9 Mtr Nos 2 1 0 3

7 Tandem Roller 10/12 MT Nos 0 0 0 0

8 PTR 25 MT Nos 0 0 0 0

9 Batching Plant 60 CPH Nos 1 1 1 3

10 Batching Plant 30 / 45 CPH Nos 1 1 1 3

12 Transit Mixer 6 Cum Nos 13 14 13 40


STATUS OF QUALITY WORKS
QUALITY ASSURANCE PLAN AND WORK METHODOLOGY

(i) The Construction methodology for structures/ Road works


submitting by EPC contractor on regular basis apart from
QAM.
Remarks: EPC are using standard formats as per
approved QAP.
STATUS OF SOURCE APPROVAL

Material To
S. No. Material Description Source of Material Name of Crusher Status be Used in Remark
Pkg

Lakhvinder Singh Stone


1 Coarse Aggregate Badhaura Kala, Chhatarpur MP Approved 10,11&12
Crusher

2 Coarse Aggregate Didwara Chhatarpur MP OM Granite Stone Crusher Approved 10,11&12

SKM/ Bhadrakali Stone


3 Coarse Aggregate Badhaura Kala, Chhatarpur MP Approved 11
Crusher

4 Coarse Aggregate Prakash Bhamori Chhatarpur MP SR Mines Approved 11

5 Coarse Aggregate Bharatkoop, Chitrakoot Ocean Build Space Approved 12

6 Fine Aggregate Jauharpur Banda Yamuna River Yamuna River Approved 10 & 11

7 Fine Aggregate Dando Chitrakoot Yamuna River Yamuna River Approved 12


Admixture &Curing
10 Sikka, Fosroc Approved 10,11&12
Compound
BASF Approved 10,11&12
11 Cement Ultratech, JK Super Approved 10,11&12
Wonder Cement Approved 10,11&12
MP Birla Approved 10,11&12
Ambuja Approved 10,11&12

12 MS Binding Wire Tata and Vedanta Electro steel Approved 10,11&12

13 Steel Sail Approved 10,11&12


JSW, JSPL, Tata Tiscon Approved 10,11&12
14 Polymer Ecodrill Fluid Approved 10,11&12
Wall Grip Approved 10,11&12

Prayagraj Power Generation Company Ltd,


15 Fly Ash Approved 10,11&12
Bara, UP

Precast RCC Pipe Source 30 km Kalpi Road, Vill. - Umran


16 Shree Concretes Pvt. Ltd. Approved 10,11&12
approval rania, Kanpur, Dehat, U.P.

17 GSB Source Koraon, Meza Prayagraj UP Mahakaleswar Stone Crusher Awaited 3rd Party Report 11 &12

18 CTSB
19 WMM
Techfab India Industries Ltd. Approved
10,11&1
19 RE Wall
Maccaferri Environmental Solution Pvt. Ltd Approved 2

10,11&1
JK Pre-stressing Co Approved
2
20 Prestressing Material
10,11&1
Dynamic Pre-stress Approved
2

10,11&1
Usha Martine Approved
2
21 HT Strands
10,11&1
Tata steel Ltd. Approved
2

10,11&1
22 Bridge Bearings Hercules Structural systems Pvt Ltd Approved
2

10,11&1
23 Bitumen IOCL Approved
2

10,11&1
24 Modified Binder Indian Oil total private Limited Approved
2

10,11&1
25 Emulsion HINCOL – Jhansi Approved
2

Note: QAP
Pkg 10 Near Sai Dhaba, Lalganj - Bachhrawan Road Vill- Merui, Lalganj, Dist- Raebareli UP 229206

Pkg 11 Karauli Road, Itaura Bujurg Village, The. - Unchahar Dist.- Raebareli UP 229401

Vill- Raiskaranpur Post-badgawan Near Azadnagar market Tehsil- Kunda District-Pratapgadh U.P
Pkg 12
Pin-230204
Details of stage passes reviewed by Egis

Domain No of Stage Passes reviewed by Egis Total No of Stage % Coverage of Stage pass review
Passes

Highway 200 1678 11.92%

Structure 27 46 26.50 %

Material 87 90 21.95 %

Plant 118 118