BASE PLASTER WORKS CHECKLIST

Project Info The Shoreline Residence Mixed Use Development Date 9/13/2022

Referance NTC No 1892-KG-X-X-XX-SI-W-GE-GE-0979 BOQ Item

Zone / Sub-Zone Block B Axis / Level / Location Info L06

No General Y N* N/A

1 Are the materials approved?

2 Is the surface clean? Is all the debris cleaned?

3 The plum is in permissible deviation? (6.4 mm in 3m)

4 The smoothness check

5 Are there any cracks on the surface? Surface check

6 Are the corner bears applied?

7 Any other checks: _________________________________________________________________________________

If "NO" to any of the above, please explain in the "Comments" section.

Comments

Notice: Authorization Matrix should be followed for signature

Date Name-Surname Signature

KGML Related Field Engineer 9/13/2022 Burak Girisen

KGML Quality Control Engineer 9/13/2022 Ege Duruer

If "NO" to any of the above, please explain in the "Comments" section.

Comments

Notice: Authorization Matrix should be followed for signature