Anomaly Print

Report No. GL-IRR-4426

Inspection Date 02/03/2020 Inspection Type GVI

ASSET DETAILS

Process Unit METERING SKID X-501 Production Unit DAMIETTA ONSHORE

Previous Tag Name Drawing No. 1518-A1-2010T rev 5

Asset Name X-501 METERING SKID PEFD No.

Description X-501 METERING SKID

Fitness For AMBER


Purpose
INSPECTION DETAILS
Inspection Rev-01, Seq. 1, 2 and 4, Date: 17th June 2019-This inspection has been carried out as part of Jetty Above Sea Inspection Campaign
Comments for 2019* Seq. 1: More coating breakdown and corrosion was observed at uninsulated branches/SBP. Ref photos # 1 to 12.* Seq. 2:
More coating breakdown and corrosion on the steel structure of metering skid. Ref photo # 16.* Seq. 4: Cladding damage was
observed as in Rev.0, Ref. photos 13 to
15.=================================================================================================
===============Rev0,Inspection date: April, 25th 2017.1518-A1-2010T rev 5 Location:X-501 Summary of
inspection:====================** This report has been issued based on the current (2016/2017) integrity programs of External
survey for Damietta piping, vessels & structure external conditions in order to update the status of anomalies and reports the new
findings** A General and Close Visual Inspection were carried out on the items identified in SHIP LOADING /UNLOADING** This
Inspection survey was carried out by IMT Eng. With the below limitations**This anomaly is part of Report # UGDC/D/16/001 Rev. 0
Inspection Limitation ===================** A Close visual inspection was performed from all accessible
areas and General visual inspection has been performed from un-accessible areas.**Still digital photographs were recorded** No
NDE has been performed at the time of inspection. Findings and Inspection Observations=============================1-
The areas highlighted were generally seen to be in serviceable conditions without any obvious signs of damage that would impact
the immanent Integrity of these pressure retaining components2-Paint Failure and Rusted surfaces were noted on piping
Components out of insulation in Metering Skid X-501 Ref. to PID & Pho. Log # ( 13 to 15 )

Work Request No Work Order No

Condition Codes Raised Date 19/07/2017

Printed On: 08/03/2020 8:52 (dd/MM/yyyy hh:mm) Page 1 of 4


Time Zone: (UTC+02:00) Cairo
Printed from: Synergi Plant by AELBANNA
RECOMMENDATION
Closed Out Action Due
Seq. Un Confirmed Action Code Recommendation Text Priority FFP Status
Date Date
Rev.01, Date: 17th June 2019

1- Take off insulation around all uninsulated


branches/SBP that suspected to suffer from
CUI, and apply proper coating system and
re-insulation as per UGDC specs. Ref
Photos 1 to 12.

2- Call IMT for inspection/assessment after


insulation removal to carry out inspection
and assessment.
=================================
============================
Rev0,
Inspection date: April, 25th 2017.

1518-A1-2010T rev 5 19/01/2018


1 I PMT-PAINTING Location:X-501 HIGH
00:00:00
Findings and Inspection Observations
=============================

2-Paint Failure and Rusted surfaces were


noted on piping Components out of
insulation in Metering Skid X-501 Ref. to
PID & Pho. Log # ( 13 to 15 )

Recommendations:
================
** Apply proper painting system for all
deteriorated, rusted and coating breakdown
areas over all the pipe line as per
design/UGDC specification to avoid
spreading of corrosion flakes and maintain
piping integrity

INSPECTION DETAILS
Inspection Rev0,
Comments Inspection date: April, 25th 2017.

1518-A1-2010T rev 5
Location:X-501
Findings and Inspection Observations
=============================

3-Paint Failure and Rusted surfaces were noted on Metering Skid X-501 steel structure base Ref. to PID & Pho. Log # ( 16 to 18 )

Work Request No Work Order No

Condition Codes Raised Date 19/07/2017

Printed On: 08/03/2020 8:52 (dd/MM/yyyy hh:mm) Page 2 of 4


Time Zone: (UTC+02:00) Cairo
Printed from: Synergi Plant by AELBANNA
RECOMMENDATION
Closed Out Action Due
Seq. Un Confirmed Action Code Recommendation Text Priority FFP Status
Date Date
Rev.01, Date: 17th June 2019

- Apply proper coating system for all areas


of coating deterioration and corrosion/rust
on the metering skid steel structure, as per
UGDC specs. Ref Photo # 16.
=================================
========================
Rev0,
Inspection date: April, 25th 2017.

1518-A1-2010T rev 5
Location:X-501
Findings and Inspection Observations 19/07/2019
2 PMT-PAINTING ============================= 2 GREEN
00:00:00
3-Paint Failure and Rusted surfaces were
noted on Metering Skid X-501 steel
structure base Ref. to PID & Pho. Log # ( 16
to 18 )

Recommendations:
================
** Apply proper painting system for all
deteriorated, rusted and coating breakdown
areas over all the pipe line as per
design/UGDC specification to avoid
spreading of corrosion flakes and maintain
piping integrity

INSPECTION DETAILS
Inspection Rev0,
Comments Inspection date: April, 25th 2017.

1518-A1-2010T rev 5
Location:X-501
Findings and Inspection Observations
=============================

4-Cracks and damage areas were observed in concrete foundation/pedestals under Metering Skid X-501 Ref. to PID & Pho. Log #
( 16 to 18)

Work Request No Work Order No

Condition Codes Raised Date 19/07/2017

RECOMMENDATION
Closed Out Action Due
Seq. Un Confirmed Action Code Recommendation Text Priority FFP Status
Date Date
Rev0,
Inspection date: April, 25th 2017.

1518-A1-2010T rev 5
Location:X-501
Findings and Inspection Observations
=============================

4-Cracks and damage areas were observed 31/01/2018 19/07/2018


3 PMT-CVL in concrete foundation/pedestals under 3 AMBER
00:00:00 00:00:00
Metering Skid X-501 Ref. to PID & Pho.
Log # ( 16 to 18)

Recommendations:
================
** Apply proper repair system approved by
civil engineer for all cracked /damaged
concrete areas as per UGDC specs. to
maintain the mechanical integrity of asset.

Printed On: 08/03/2020 8:52 (dd/MM/yyyy hh:mm) Page 3 of 4


Time Zone: (UTC+02:00) Cairo
Printed from: Synergi Plant by AELBANNA
INSPECTION DETAILS
Inspection Rev0,
Comments Inspection date: April, 25th 2017.

1518-A1-2010T rev 5
Location:X-501
Findings and Inspection Observations
=============================

5-Damage of insulation/insulation cladding was observed at some piping of Metering Skid X-501 Ref. to PID & Pho. Log # ( 19,20)

Work Request No Work Order No

Condition Codes Raised Date 19/07/2017

RECOMMENDATION
Closed Out Action Due
Seq. Un Confirmed Action Code Recommendation Text Priority FFP Status
Date Date

Rev.01, Date: 17th June 2019

- The damaged insulation was found the


same as previous inspection. Ref photos 13
to 15.
=================================
======

Rev0,
Inspection date: April, 25th 2017.

1518-A1-2010T rev 5
Location:X-501 19/07/2018
4 PMT-INSU. 3 AMBER
Findings and Inspection Observations 00:00:00
=============================

5-Damage of insulation/insulation cladding


was observed at some piping of Metering
Skid X-501 Ref. to PID & Pho. Log #
( 19,20)

Recommendations:
================
**Insulation to be removed at the wetty
areas to allow performance of close visual
inspection and replaced with new insulation

Raised By Assessed By Approved By

Technical Assistant Technical Assistant

IMT Ahmed Talaat Ahmed Talaat

Distribution

Copy

Printed On: 08/03/2020 8:52 (dd/MM/yyyy hh:mm) Page 4 of 4


Time Zone: (UTC+02:00) Cairo
Printed from: Synergi Plant by AELBANNA