Professional Documents
Culture Documents
Doc No 004
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR Architectural Works Date 25th Jun, 2020
Page 1 of 8
No Part of this document or the information it contains may be reproduced or transmitted in any
form or by any means electronic or mechanical, including photocopying, recording, or by any
information storage and retrieval system, without permission in writing from SABIC or NCC
EPM-ITP-CC-
Doc No 004
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CMU INSTALLATION Date 25th Jun, 2020
Page 2 of 20
TABLE OF CONTENTS
Inspection Responsibility
Sr. Acceptance Verifying Sub-
B Inspection Activity Characteristic Verified (4) Reference Document (5)
No Criteria (6) Document (7) Contractor CONTRACTOR COMPANY
/Vendor
2 CMU Installation
SES A03-
2.1 Masonry Block Material Approved Document ASTM C-90//SOW E01,ASTM C-90 Approved Document I W A
2.3 Concrete Hollow Block Installation Conformance to Drawing SES-C02-S01 IFC Drawings CV-002-2 I W A
Doc No EPM-ITP-CC-004
Inspection Responsibility
Sr. Acceptance Verifying Sub-
Inspection Activity Characteristic Verified (4) Reference Document (5)
No Criteria (6) Document (7) Contractor CONTRACTOR COMPANY
/Vendor
4.1 Painting
4.1 Material Approval Approved Document IFC DRAWINGS SES A01-S02 Approved Document I W A
Primer/Intermidiate/Final Coating
4.3 SES T01-S01 CV-002-4 I W A
application
5.1 Material Approval Approved Document IFC DRAWINGS ASTM C 1396 Approved Document I W A
5.3 Gypsum Board Partition Installation IFC DRAWINGS SES AO1-FO1-02 CV-002-5 I W A
Doc No EPM-ITP-CC-004
Legend
(1) ‘Prepared by’ should be the name, signature and COMPANY’s name for the Vendor’s/Sub contractor’s representative.
(2) ‘Approved by’ should be the name, signature and COMPANY’s name for the CONTRACTOR’s representative.
(3) ‘Location’, ‘Item Name’ and ‘Tag Number’ shall be used if applicable.
(4) ‘Characteristics Verified’ are the parameters checked during the inspection activity.
(5) ‘Reference Document’ is the Project Specification / Code / Standard / Drawing, Procedure etc. on the basis of which inspection shall be conducted.
(6) ‘Acceptance Criteria’ is the tolerance, reading, value or an outcome derived from reference documents.
(7) ‘Verifying Document’ is the record generated during inspection & Testing using approved forms / checklists.
(8) ‘Inspection Responsibility’ is the role of Vendor / Sub contractor, CONTRACTOR and COMPANY for each inspection step. Inspection responsibility shall be ‘I’ for Inspection, ‘R’ for review, ‘A’ for approval, ‘S’ for
Surveillance, “W’ for 100% Witness, ‘SW’ for random witness and ‘H’ for hold.
EPM-ITP-CC-
Doc No 003
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CMU INSTALLATION Date 25th Jun, 2020
Page 5 of 20
2.0 Checklist-Material Receiving Inspection
CV-MRI-1
MATERIAL RECEIVING INSPECTION Record No
Date
IBB MCU PROJECT & MODIFICATION OF K-12 Disciplin
Project No. Civil Area No
BUILDING e
1 Material Type
2 Supplier
□ Satisfied
5 Visual Inspection
□ Unsatisfied
6 Remarks
Submitted by:
Review and approval Status:
□ (A) Approved without comments.
□ (B) Approved with comments.
□ (C) Disapproved.
Comments:
Name
Signature
Date
EPM-ITP-CC-
Doc No 003
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CMU INSTALLATION Date 25th Jun, 2020
Page 6 of 20
3.0 Checklist- CMU Installation
CV-002-2
Page 1 of 4
Reco
CMU INSTALLATION CHECKLIST rd
No
Date
Area
Project No SP-173100119
No.
Drawin
Location Description IBB/SAFCO
g No.
Ite Sub cont. NCC
Description of Check
m Acce Rejec Acce Reje
CMU material is approved in accordance with ASTM C-90
Nom. Width = Face Shell Thk.=Min. Equiv. Web Thk (Ave. 3
In.(mm) in(mm) Units)=in/linear ft.
3(76.2)&4(102) 3/4(19) 2&5/8(136)
13(208)
18(288)
CV-002-2
Page 2 of 4
Date
Record
No
Date
CV-002-2
Page 4 of 4
Name
Signature
Date
Steel window frames shall comply with NFPA 80. Windows shall be listed and
03 labeled by SABIC approved inspection and testing agency in accordance with
NFPA 257 test requirements
Fire rated window assembly shall comply with NFPA 80. Windows shall be
04 listed and labeled by SABIC approved inspection and testing agency in
accordance with NFPA 257 test requirements
08 Water shed members shall be provided with above side hinge ventilators
Sill shall be set with a bed of sealant or with gaskets as indicated in the drawing
10
for a weather tight construction
Allowable glass scratches
Smaller than 50 mm Allowed in any area
11 Allowed only in areas 75 mm of an
50 mm or longer
edge/not allowed in primary vision area
Large clusters of scratches Not allowed
Allowable glass pinholes
12 At a viewing distance of 1800 mm, pinholes greater than 1.6mm diameter shall
not be allowed
CV-002-3
Page 2 of 2
Reco
WINDOW INSTALLTION CHECKLIST rd
No
Date
Area
Project No SP-173100119
No.
Drawin
Location Description IBB/SAFCO
g No.
Large clusters or small spacing of smaller pinholes shall not be allowed in any
EPM-ITP-CC-
Doc No 003
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CMU INSTALLATION Date 25th Jun, 2020
Page 11 of 20
area through which a person would normally look
When viewed against a bright uniform background at a distance of 3000mm or
more, color reflectance and transmission may vary slight and be considered
acceptable
NOTES :
Name
Signature
Date
03 1st, 2nd & final coat paint record shall be in accordance with SES-PCS 101-S01 4
CV-002-3
Page 2 of 2
Reco
PAINTING CHECKLIST rd
No
Date
Area
Project No SP-173100119
No.
Drawin
Location Description IBB/SAFCO
g No.
Drying time shall not be less than manufacturer’s recommendations
EPM-ITP-CC-
Doc No 003
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CMU INSTALLATION Date 25th Jun, 2020
Page 13 of 20
The priming coat shall cover the entire surface profile of the steel surface. Each
coat shall be applied as uniformly as possibly & without leaving any areas
uncovered
All materials shall be evenly applied to form continuous , unbroken coatings
The dry film thickness (DFT)) shall be field tested with a magnetic gage(for
steel). The testing method shall be in accordance with SSPC PA2
Precautions shall be taken to protect adjacent coated areas from damage caused
by local abrasive blasting
Defects in any paint coat which may lead to a reduction in the protection
provided by the coat, or which have a significant effect on appearance shall be
repaired prior to application of the next coat
NOTES :
Name
Signature
Date
CV-002-5
Page 2 of 3
Reco
GYPSUM BOARD PARTITION INSTALLATION CHECKLIST rd
No
Date
Area
Project No SP-173100119
No.
Drawin
Location Description IBB/SAFCO
g No.
Studs shall engage with the floor and ceiling /roof runner. The
gap between runners and stud shall not be more than 1/4 in.
(6mm)
Studs shall engage with the floor and ceiling /roof runner. The
gap between runners and stud shall not be more than 1/4 in.
(6mm)
NOTES :
Name
Signature
Date
CV-002-5
Page 3 of 3
Reco
GYPSUM BOARD PARTITION INSTALLATION CHECKLIST rd
No
Date
Area
Project No SP-173100119
No.
Drawin
Location Description IBB/SAFCO
g No.
Vertical studs shall be extended above the ceiling line in
accordance with figure 1,2& 3 of SSA01,F01-02
EPM-ITP-CC-
Doc No 003
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CMU INSTALLATION Date 25th Jun, 2020
Page 16 of 20
Name
Signature
Date
All concrete surfaces shall be sound, clean, dry & free from loose flaking
02
material, efflorescence, laitance, curing compounds, dust, oil, grease etc
High pressure fresh water wash shall be carried out with a fan jet lance providing
04 nozzle pressure of approximately 3000 psi (207 bar/210kg/sq.cm) with sufficient
volume of water
All blowholes, pinholes, shall be treated with an epoxy mortar- two packs or
05
three pack. Ensure to abrade the surface again prior to application of paint system
Power tool with lightly power disc needle gun is advised for areas less than 0.1
06
sq.m
All sharp dimension changes such as fillets shall be filled with the coating
manufacturer’s recommended patching compound to obtain a smooth contour.
07
The minimum throat dimensions of shell to bottom fillet in storage tank shall be
25 mm
08 Surface profile is 65-100 microns
Solvent free epoxy amine cured coating system for concrete sea water
immersion service
All concrete surfaces shall be sound, clean, dry and free from loose flaking
09
material, efflorescence, laitance, curing compounds, dust, oil, grease, etc.
NOTES :
Name
Signature
Date
CV-002-1
Page 2 of 2
Reco
CONCRETE SURFACE PREPARATION CHECKLIST rd
No
Date
Area
Project No SP-173100119
No.
Drawin
Location Description IBB/SAFCO
g No.
Sub cont. NCC
Item Description of Check
Acce Rejec Acce Reje
All blowholes, pinholes, shall be treated with an epoxy mortar- two packs or
10
three pack. Ensure to abrade the surface again prior to application of paint system
EPM-ITP-CC-
Doc No 003
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CMU INSTALLATION Date 25th Jun, 2020
Page 18 of 20
Surface shall be treated with amine cured epoxy sealer as per manufacturer’s
11 recommendation
Epoxy Coating System for concrete floor (Old/New)/ One pack moisture
Cured Polyurethane Coating system for above ground Concrete
Foundations/ Structures
New concrete /Old Concrete floors shall be removed of oil, grease, wax with
12
suitable degreaser with manual tool(if too dense/ thick)
Wash the surface with high pressure freshwater if necessary and allow to dry and
13
ensure moisture is less
Prepare the floor surface by grinding with a diamond disc grinding machine to
14 get the required profile as well for removing curing compound, laitance,
efflorescence, etc.
15 Remove any dust generated by using industrial heavy duty vaccum cleaner
Any holes or cracks (should be V-Cut) or any imperfections shall be filled with
16
compatible or appropriate sealer as per manufacturer’s recommendation
NOTES :
Name
Signature
Date