Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to km 226+500 under
Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package – OD-3) (Length 47.500
km)
Health, Safety & Environment Compliance : Yes No Work Can be started : Yes No
Note 1: Please Mark if found 'In compliance', If found 'Non compliant' and NA if not applicable
Work Permit Issued HIRA Fire Extinguiser Tool Box Conducted
Safe Access for Workplace First Aid Box Dust Control Plan Traffic Control Plan Implemented
Aspect Impact Analysis PPE Provided Fall Protection Edge Barricading Provided
Hazardous Chemical use Safety Supervision Waterbody Contamination Prevention Actions Implemented
Request for Inspection of works of :
Note 2 : Attachment of Checklist of each activity and Concrete Pour is Mandatory with this RFI for Acceptance
Clearing & Grubbing Aggregate Layer Toll Plaza Works Landscaping
Survey Kerb Rest Area Works DLC / PQC
Excavation Prime Coat /Tack Coat Layout Marking Hume Pipe Laying
NGL/OGL DBM PCC Drainage & Protection
Embankment BC/SDBC Formwork Dismantling Work
Subgrade RE Wall Pile Boring Structure Miscellaneous Works
GSB Retaining Wall Reinforcement Traffic Sign Board
WMM Road Marking Concreting Material Testing
CTB Soil Nailing Prestressing Others
CTSB Highway Miscellaneous Works Girder Erection
Description of Works
:
Layer /Grade of Concrete:
Time of Inspection:
Requested By (EPC/Sub.Contractor) Received By (Concessionaire / IE):
Name : Name :
Signature : Signature :
Date : Date :
Time : Time :
Remarks / Comments / Observations / Remedial Action given by EPC / Concessionaire
Pre-Construction:
Construction:
Post -Construction:
Status
APPROVED Name Name Name
NOT APPROVED Sign Sign Sign
HOLD Date Date Date
EPC Sub-Contractor' Rep EPC/Concessionaire's Rep NHAI / IE's Representative
RFI Audited By Signature & Date Remarks if any
Format No.: ARTL/BKRP/F/02 R0
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to
km 226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid
Annuity Mode (Package – OD-3) (Length 47.500 km)
SAMPLE CARD
Date of Sample :
Chainage :
Sample Location :
Type of Sample :
Sample Quantity :
Sampled By :
Tests Required :
Trials
Weight of Sand in Cone Average
1 2 3
1. Weight of sand in pouring cylinder before pouring, Wa
(g)
2. Weight of sand in pouring cylinder after filling in the
cone,Wb (g)
3. Weight of sand in the cone W2 (g) = ( Wa - Wb )
Bulk Density of Sand
1. Weight of sand in pouring cylinder before pouring W1 (g)
2. Weight of sand in pouring cylinder after filling in the
calibrating container and cone, W3 (g)
4. Weight of sand in the calibrating container, Wa=W1-W3-
W2 (g)
5. Volume of calibrating container ,V (cc)
Note: Sand to be used shall be clean uniformly graded natural sand passing 1.00 mm sieve and
retained on 600 micron seive
RESULT
1. Average Bulk Density of Sand = g/cc
2. Weight of sand in Cone of the pouring cylinder = g
Remarks:
Wt of Dry Wt. of
RMM Wt. of Wet Soil+ Wt. Of Wt. of Moisture Water RMM Moisture
Soil+ Oven
Reading Container Container Water Content Added Reading Content
Container Dry Soil
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40
0.20
0.00
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0
RMM Reading
Allowable
variation in ±3 ±3 ±3 ±3
each batch
Average
: m/hr
Bin - 1 (40mm)
Weight per
Gate Out Put
Meter
Opening/
Moter
Speed kg TPH
Gate/ Motor opening
Output in TPH
Remark:
Source : Location :
Remarks:-
CRUSHER DUST
1
0.9
0.8
0.7
Production (TPH)
0.6
0.5
0.4
0.3
0.2
0.1
0
0 5 10 15 20 25 30 35 40
Load Setting (%)
Remarks :
Average OutPut
Weight (Kg/mt) Weight for 1m Production
Load Setting (%)
length of sample (TPH)
Trail -1 Trail -2 Trail -3
(Kg)
10MM AGGREGATE
60
50
40
Production (TPH)
30
20
10
0
0 0.2 0.4 0.6 0.8 1 1.2
Remarks :
EPC
Contractor's Contractor/Concessionaire's NHAI/Independent Engineer's
Representative Representative Representative
Format No.: ARTL/BKRP/F/08 R0
: M/s SA Infrastructure Consultants Pvt. Ltd. In Association with ROTRANS Infra Projects
Independent Engineer
Pvt.Ltd.
Concessionaire : M/s Badakumari Karki Road Private Limited
EPC Contractor : M/s Adani Road Transport Limited
20MM AGGREGATE
20MM AGGREGATE
70
60
50
Production (TPH)
40
30
20
10
0
0 2 4 6 8 10 12 14 16 18
100
80
Production (TPH)
60
40
20
0
0 5 10 15 20 25 30 35 40
Load Setting (%)
Remarks :
% 3 TRIAL31 3 2
TRIAL TRIAL
3 3 3
WATER CELL
8.00
7.00
6.00
MOISTURE CONTENT %
5.00
4.00
3.00
2.00
1.00
0.00
1 1.5 2 2.5 3 3.5 4 4.5 5
Load Setting (%)
Remarks :
WATER :
5.8 % i.e, 11.60 T/hr for 200 T/hr production, Required Rate of flow = 3.22 litres/sec
Load Setting adjusted for required flow is 3.0
Water collecting Time-60sec, Required Water for 60sec = 193.2 litres,
Amount of water collected-192.5 lit
1 2 3
Weight of saturated aggregates and Basket in water
(g)
(W1)
Weight of Basket in Water (W2) (g)
Weight of saturated surface dry aggregates in air
(g)
(W3)
Weight of oven dried aggregate in air (W4) (g)
Note 1 : A sample of not less than 2000g of the aggregte shall be tested.
2 : The sample shall be completely immersed in water during the operation and for a subsequent period of
between 24 ± 1/2h and maintain the water temperature between 22-32 °C.
Remarks:
1 2 3
o
Temperature of Water C
Pycnometer Number
Note: The sample shall be completely immersed in water during the operation and for a subsequent period of
between 24 ± 1/2h and maintain the water temperature between 22-32 °C.
Remarks:
mm mm W1 W2 W3 W4
63 50
50 40
40 31.5
31.5 25
25 20
20 16
16 12.5
12.5 10
10 6.3
Total Weight
Remarks:
Weight of surface dry sample passing 12.5mm and retained on 10mm IS sieves, W 1.
W4 = W1 - (W2 + W3)
Specifications:
Type of work BC DBM BM WMM GSB(wet AIV) Concrete DLC/PQC
MoRT&H Clause 507.2.2 505.2.5.1 504.2.2 406.2.1.1 401.2.2 IS 383 IS 383
Maximum Value (%) 24 27 30 30 40 45 30
Remarks :
Material :
Description Test 1 Test 2 Average
Remarks :
Temperature of Aggregate ( oC )
Temperature of Bitumen ( oC )
Weight of Bitumen (g)
RESULTS :
Remarks:
EPC
Contractor's NHAI/Independent Engineer's
Contractor/Concessionaire
Representative Representative Representative
Format No.: ARTL/BKRP/F/15 R0
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to
km 226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid
Annuity Mode (Package – OD-3) (Length 47.500 km)
Client : National Highways Authority of India
: M/s SA Infrastructure Consultants Pvt. Ltd. In Association with ROTRANS
INDEPENDENT ENGINEER
Infra Projects Pvt.Ltd.
CONCESSIONAIRE : M/s Badakumari Karki Road Private Limited
EPC CONTRACTOR : M/s Adani Road Transport Limited
SILT & CLAY CONTENT OF FINE AGGREGATE
Test Method (IS:2386 Part II)
Laboratory Date Sampled
Location/Source Sampled by
Type of Materials Date of Test
Proposed Use Tested by
Wt. of Sample (g)
Description of Sample :
Weight of sample
Total Weight of Silt & Clay content
retained on 75µ IS Average
S.No. Sample (W1) {[(W1-(W2)]/W1}X100
Sieve (W2) (%)
(g) (%)
(g)
Remarks:
CONCESSIONAIRE
EPC CONTRACTOR
CONSTRUCTION CONTRACTOR
Format No.: ARTL/KKRPL/F/15 R0
Specifications:
Type of work BC DBM BM WMM Concrete DLC/PQC
MoRT&H Clause 507.2.2 505.2.5.1 504.2.2 406.2.1.1 IS 383 602.2.6.1/2
Maximum Value (%) 30 35 40 40 50 35
Remarks :
INDEPENDENT ENGINEER
CONCESSIONAIRE
EPC CONTRACTOR
CONSTRUCTION CONTRACTOR
Proposed Use:
A. Sand Reading
B. Clay Reading
Note: As per MoRT&H CL. 505.2.3 & 602.2.6.3, Sand equivalent value is 50 minimum
Remarks :
#REF! Page
National Highways Authority of India
(Ministry of Road Transport & Highways)
Government of India
INDEPENDENT ENGINEER
CONCESSIONAIRE
EPC CONTRACTOR
CONSTRUCTION CONTRACTOR
Format No. : SKRPL/QC/AGG/07 R0
AGGREGATE CRUSHING VALUE TEST
[As per IS 2386, (Part - IV) ]
REMARKS :
INDEPENDENT ENGINEER
CONCESSIONAIRE
EPC CONTRACTOR
CONSTRUCTION CONTRACTOR
Format No. SKRPL/QC/AGG/11 R0
SOUNDNESS OF AGGREGATE
As per IS 2386 Part-V
63 mm 40mm 31.5mm
Loss with Na2So4 Max.12%
40mm 20mm 16mm
63 40
40 20
20 10
10 4.75
Total
Remarks:
0 Page
Format No.: ARTL/BKRP/F/16 R0
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000
to km 226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on
Hybrid Annuity Mode (Package – OD-3) (Length 47.500 km)
Client : National Highways Authority of India
INDEPENDENT : M/s SA Infrastructure Consultants Pvt. Ltd. In Association with ROTRANS Infra
ENGINEER Projects Pvt.Ltd.
CONCESSIONAIRE : M/s Badakumari Karki Road Private Limited
EPC CONTRACTOR : M/s Adani Road Transport Limited
CEMENT TEST REPORT (PHYSICAL PROPERTIES)
(AS PER IS: 4031 )
Source : Date of Sampling :
Brand of Cement : Date of Testing :
Batch No. : Sampled By :
Grade of Cement : Tested BY :
FINENESS OF CEMENT NORMAL CONSISTENCY OF CEMENT
Weight Trail No. 1 2 3 4
% wt.
Weight of of
Test No. Retain Average Wt. of Sample
the sample Sample
ed
retained Wt. of water
Consistency
(%)
Penetration
Standard
Consistency
Maximum Limit <10 % Standard Consistency at 5-7 mm Penetration
SOUNDNESS OF CEMENT
Test Method: (IS 4031 PART - 3)
Measured distance in
between the two
separating indicators Soundness in terms of
Sample Taken Normal Water required Specified
Before Le-Chatelier's
S.No. (W) Consistency (P) (0.78 X P X W) After putting 3 limits as per Remarks
putting in (A) -(B)
(g) (%) (g) hours in boiling IS: 8112 - 2013
boiling (mm)
water (B)
water (A)
(mm)
(mm)
Max 10 mm
Remarks:
INDEPENDENT ENGINEER : M/s SA Infrastructure Consultants Pvt. Ltd. In Association with ROTRANS Infra Projects Pvt.Ltd.
Sampled By Tested By
Description 1 2 3
Weight of 50ml Bottle A gm
Weight of 50ml Bottle with Kerosene B gm
Weight of 50ml Bottle + Cement C gm
Weight of 50ml Bottle + Cement + Kerosene D gm
Remarks:
#REF! Page
INDEPENDENT ENGINEER
CONCESSIONAIRE
EPC CONTRACTOR
CONSTRUCTION CONTRACTOR
SIEVE ANALYSIS OF SINGLE SIZED COARSE AGGREGATE FOR CONCRETE
As per IS 2386 Part - 1
40 85-100 100 -
20 0-20 85-100 -
12.5 - - 100
2.36 - - 0-5
Pan
Remarks:
40 100
20 85-100
10 0-20
4.75 0-5
12.5 100
10 85-100
4.75 0-20
2.36 0-5
40 100
20 95-100
10 25-55
4.75 0-10
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000
to km 226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on
Hybrid Annuity Mode (Package – OD-3) (Length 47.500 km)
Pan
Fineness Modulus = (Sum of cumulative percentage retained on each sieve) / 100 =
Fineness Modulus Specified Limit : > 2.0 & < 3.5 (MORTH CL. 1008)
For Crushed stone sand (Crusher Dust), the permissible limit on 150 micron IS sieve is incresed to 20%
Remarks
40 mm 100
20 mm 95-100
4.75 mm 30-50
Pan
100
90
80
70
% of Passing
60
50
40
30
20
10
0
0.1 1 10 100
IS sieve size in mm
Remarks:
Weight Average
Density of Failure Compressive
Cube of the Compressive
S.No. Cube Load Strength Remarks
No. Cube Strength
(g/cc) (kN) (N/mm2)
(g) (N/mm2)
Note:
a) For l/d ratio, correction factors are as per Figure – 1 of IS: 516 – 1959 (Reaffirmed 1999).
b) Equivalent cube compressive strength = 1.25 x corrected cylinder compressive strength as per IS: 516 – 1959 (Reaffirmed 1999).
Acceptance Criteria as per IS: 456 - 2000: Concrete in the member represented by a core test shall be considered acceptable if the average equivalent cube strength of the
cores is equal to at least 85 percent of the cube strength of the grade of concrete specified for the corresponding age and no individual core has a strength less than 75
Remark:
Absorption
Corrected
Moisture
Moisture
Content
Water
Field
Material As per Design Mix (Kg/ M3) in SSD condition Corrected Design Mix (Kg/M3)
Remarks:
0 Page
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to km 226+500 under
Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package – OD-3) (Length
47.500 km)
Chainage : RFI No :
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000
to km 226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on
Hybrid Annuity Mode (Package – OD-3) (Length 47.500 km)
Dia
Bar Cut Total Unit
of Shape of Bar / Spacing No. of Total Weight
Mark Length Length Weight
Bar Designation of Bar (mm) Bars (Kg)
No. (m) (m) (Kg)
(mm)
Extra Reinforcement:
Remarks:
IS Sieve Cumulativ
Size Weight Cumulativ
e Weight Passing
(mm) Retained e Retained Lower Limit Upper Limit
Retained (%)
(g) (%)
(g)
Remarks:
EPC
Contractor's Contractor/Concession NHAI/Independent Engineer's
Representative Representative Representative
CONCESSIONAIRE
EPC CONTRACTOR : M/s Adani Road Transport Limited
CONSTRUCTION CONTRACTOR
Format No. : SKRPL/QC/FM/02 R0
SIEVE ANALYSIS OF FILTER MEDIA
As per MORTH CL. 309.3.2.2 (ii) & TABLE 300-3
IS Sieve Cumulativ
Size Weight Cumulativ
e Weight Passing
(mm) Retained e Retained Lower Limit Upper Limit
Retained (%)
(g) (%)
(g)
Remarks:
CONCESSIONAIRE
EPC CONTRACTOR : M/s Adani Road Transport Limited
CONSTRUCTION CONTRACTOR
Format No. : SKRPL/QC/FM/03 R0
SIEVE ANALYSIS OF FILTER MEDIA
As per MORTH CL. 309.3.2.2 (iii) & TABLE 300-3
IS Sieve Cumulativ
Size Weight Cumulativ
e Weight Passing
(mm) Retained e Retained Lower Limit Upper Limit
Retained (%)
(g) (%)
(g)
53 100 100
45 97 100
22.4 58 100
11.2 20 60
5.6 4 32
2.8 0 10
1.40 0 5
0.09 0 3
Remarks:
Page
Format No: ARTL/BKRP/F/29 R0
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to km
226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid
Annuity Mode (Package – OD-3) (Length 47.500 km)
Location/Source Sampled by
Wt. of Sample
Cumulative Cumulative
Weight Passing
Weight Retained
Retained (g) (%)
IS Sieve Size Retained (g) (%) Specification Limit
26.5mm 100
19.0mm 75-95
9.5mm 50-70
4.75mm 30-55
2.36mm 17-42
0.600mm 8-22
0.300mm 7-17
0.150mm 2-12
0.075mm 0-10
Pan
Remarks :
Page
Format No: ARTL/BKRP/F/30 R0
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to km
226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid
Annuity Mode (Package – OD-3) (Length 47.500 km)
Location/Source Sampled by
Wt. of Sample
Cumulative Cumulative
Weight Passing
Weight Retained
Retained (g) (%)
IS Sieve Size Retained (g) (%) Specification Limit
31.5mm 100
26.5mm 85-95
19.0mm 68-88
9.5mm 45-65
4.75mm 30-55
0.600mm 8-30
0.150mm 5-15
0.075mm 0-5
Pan
Remarks :
Page
Format No: ARTL/BKRP/F/31 R0
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to km
226+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity
Mode (Package – OD-3) (Length 47.500 km)
Client : National Highways Authority of India
: M/s SA Infrastructure Consultants Pvt. Ltd. In Association with ROTRANS Infra
INDEPENDENT ENGINEER
Projects Pvt.Ltd.
CONCESSIONAIRE : M/s Badakumari Karki Road Private Limited
EPC CONTRACTOR : M/s Adani Road Transport Limited
FLEXURAL STRENGTH OF CONCRETE
(As per IS -516)
Age in Days
Remarks:
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to km 226+500 under Raipur-
Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package – OD-3) (Length 47.500 km)
INDEPENDENT ENGINEER : M/s SA Infrastructure Consultants Pvt. Ltd. In Association with ROTRANS Infra Projects Pvt.Ltd.
5 6 7 8
9 10 11 12
13 14 15 16
Page
Format No: ARTL/BKRP/F/33 R0
Development of Six Lane Badakumari – Karki Section of NH-130-CD Road from km 179+000 to km 226+500 under Raipur-
Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package – OD-3) (Length 47.500 km)
LEVEL SHEET
RFI No. : Layer Name Side Date
Offsets
Chainage FRL Camber Description Remarks
IS
Achieved level
Design level
Difference
IS
Achieved level
Design level
Difference
IS
Achieved level
Design level
Difference
IS
Achieved level
Design level
Difference
IS
Achieved level
Design level
Difference
IS
Achieved level
Design level
Difference
IS
Achieved level
Design level
Difference
INDEPENDENT ENGINEER
CONCESSIONAIRE
LEVEL SHEET
Name of layer :
TBM NO : RFI No :
TBM RL : Date :
BS : Chainage :
HI : Side :
Offset @ FRL
Chainage FRL Camber Description Offsets Remarks
IS
Achieved
Designed
Diff. (mm)
Offset
IS
Achieved
Designed
Diff. (mm)
Offset
IS
Achieved
Designed
Diff. (mm)
Offset
IS
Achieved
Designed
Diff. (mm)
Offset
IS
Achieved
Designed
Diff. (mm)
Offset
IS
Achieved
Designed
Diff. (mm)
Offset
IS
Achieved
Designed
Diff. (mm)