Remarks:
Refinery and Petrochemical Integrated Development Project
(RAPID)
ATTACHMENT LIST
No. Item / Material / Sample Laboratory / Supplier Remarks
1
2
3
4
5
6
7
8
9
10
Comments:
Signature
SUB-CONTRACTOR TOYO RAPID PMC VENDOR/OTHER
Name
Signature
Date / / / / / / / /
LEGENDACC : ACCEPT N.A. : Not Applicable REJ : REJECT
Toyo Ref. GC-001
Refinery and Petrochemical Integrated Development Project
(RAPID)
Signature
SUB-CONTRACTOR TOYO RAPID PMC VENDOR/OTHER
Name
Signature
Date / / / / / / / /
LEGENDACC : ACCEPT N.A. : Not Applicable REJ : REJECT DWG : DRAWING
Toyo Ref:.GC-002
Refinery and Petrochemical Integrated Development Project
(RAPID)
Reference Document
1 Drawing No. Rev. No.
2 Location Road No.
INSPECTIONS ACC REJ N/A REMARKS
Check Items
A. SUB-GRADE
1. Compaction
2. Preparation
2. Survey, Line Grade per Drawing?
B. BASE
1. Equipment
2. Layer Thickness / Total Thickness
3. Compaction
4. Material
5. Survey
C. SURFACE, PAVING
1. Weather Condition
2. Mix Temperature
3. Layer Thickness / Total Thickness
4. Overlaps / Joints
5. Rolling
6. Tack Coat
7. Prime Coat
8. Repairs
9. Finish Surface Condition
D. TEST
1. Test completed and acceptable?
COMMENTS
Signature
SUB-CONTRACTOR TOYO RAPID PMC VENDOR/OTHER
Name
Signature
Date / / / / / / / /
LEGENDACC : ACCEPT N.A. : Not Applicable REJ : REJECT
Toyo Ref. C-002
Refinery and Petrochemical Integrated Development Project
(RAPID)
(AASHTO T230)
REMARKS:
Signature
SUB-CONTRACTOR TOYO RAPID PMC VENDOR/OTHER
Name
Signature
Date / / / / / / / /
LEGENDACC : ACCEPT N.A. : Not Applicable REJ : REJECT
Toyo Ref. C-0xx
Refinery and Petrochemical Integrated Development Project
(RAPID)
B. KERB
1. Compaction of grade prior to installation
2. Alignment/Levelness
C. SHOULDER
1. Compaction of grade prior to installation
2. Alignment/Levelness (No Sagging)
3. Sloping followed as per drawing
4. Shoulder surface finished as per drawing
D. ROAD MARKING
1. Marking carried-out as per related Drawing
E. ROAD SIGNS
1. Signs installed as per related Drawing
F. DRAINAGE
1. Drain installed as per related Drawing
2. Joints sealed as per requirement (RAPID-P0005-TYO-CVS-
SPN-2000-0004, Reinforcement Concrete Foundation and
Structure)
REMARKS:
Signature
SUB-CONTRACTOR TOYO RAPID PMC VENDOR/OTHER
Name
Signature
Date / / / / / / / /
LEGENDACC : ACCEPT N.A. : Not Applicable REJ : REJECT
Toyo Ref. C-019