RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)

NON-CONFORMANCE REPORT

SECTION 1 GENERAL ORDER AND NON-CONFORMANCE REPORT INFORMATION


9686-PO0018-CPP-
(To be filled in by Originator) NCR Number Date 05/01/2021
NCR-001
Name of Title of Inspection 9686-PO0018-CPP-
Li Xiaogang
Originator Originator Assignment No. RFI-001
Project RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1) Project No.
Purchase Order/ CPP-RM-PO-0018 &
Revision Number Control Number
Contract Number CPP-RM-PO-0018-1
Supplier / Chaoda Valves Location / Shop / Contract PO0018 & PO0018-
Zhejiang
Contractor Name Group Co.,Ltd Address Order Number 01
SECTION 2: NON-CONFORMANCE DESCRIPTION
(To be filled in by Originator)
Non-Conformance Title Bolt, nut and trims are not conformed to the drawings.
Non-Conformance Details
1. The material of bolt for Item No.9/10/11 was A193 B8M, but the marking of the bolt with serial No.B20020007-9-8/ B20020007-
9-13/ B20020007-10-1 was "A4-70". The bolt with serial No.B20020007-11-2 has no marking
2. The material of nut for Item No.9/10/11/12 was A194 8M, but the marking of the nut with serial No.B20020007-9-8/
B20020007-9-13/ B20020007-10-1/ B20020007-11-2 was "A4-80".The nut with serial No.B20020007-12-2 has no marking.
3. Bolts and nuts shall be coated with TAKECOAT 1000 or XYLAN 1070 OR Coated with Primer 4090 or equivalent material which
was to be approved by Company. The colour of the coating shall be blue. But now the nut with serial No.B20020007-12-2, the bolt
and nut with serial No.B20020007-5-3/ B20020007-5-14/ B20020007-6-2 have no coating.
4. The material of bolt for Item No.2/15/7 was A193 B8M B7M,but the marking of the bolt with serial No.B20020007-2-2/
B20020007-15-4/B20020007-7-3 was "A4-70/A2-70/B7".
5. The material of nut for Item No.2/15/7 was A194 8M 2HM, but the marking of the nut with serial No.B20020007-2-2/
B20020007-15-4 was "8MA".The nut with serial No.B20020007-7-3 has no marking.
6. Bolts and nuts shall be coated with TAKECOAT 1000 or XYLAN 1070 OR Coated with Primer 4090 or equivalent material which
was to be approved by Company. The colour of the coating shall be blue. But now the bolt and nut of serial No.B20020007-4-
3/B20030056-8-1, the nut with serial No.B20020007-2-2/ B20020007-15-4/ B20020007-7-3 has no coating.
Non-Conformance Agreed to QMS Training and
Technical requirements
Causal Factor requirements Implementation Indoctrination

Material Material. Performance Turnover


Communications Other
Handling Management Requirements Docs.

Provide details for Other:

SECTION 3: NCR CLASSIFICATION


(As determined by the Originator and Project Quality Manager)
Category 1 (MAJOR NON-CONFORMANCE) Category 2 (MINOR NON-CONFORMANCE)
SECTION 4: PROPOSED CORRECTION

Accept As-Is Reject / Scrap Repair / Rework Return to sender

Est. Completion Date

SECTION 5: ISSUANCE OF NCR


(Signed by Project Quality Manager)
Name Signature Date

Originator / Inspector Li Xiaogang 05 Jan 21

1
From No: 9686-QA/QC-FRM-0003 Rev.01
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
NON-CONFORMANCE REPORT

Project Manager (Category 1) Luis / Yin Dangqiang 06 Jan 21


Project Quality Manager Anil.P.K. 05 Jan 21
SECTION 6: SUPPLIER / CONTRACTOR CORRECTIVE ACTION
(To be filled in by Recepient)

Root Cause

Correction Details

Completion Date

Corrective Action

Completion Date

Responsible Rep. Name Title Signature & Date

SECTION 7: DISPOSITION OF SUPPLIER / CONTRACTOR CORRECTIVE ACTION


(Signed response by Project Quality Manager)
Proceed Action
Name Signature Date
with action denied
Originator / Inspector
Engineering Mgr. / Construction
Mgr. (Category 1)
Project Manager (Category 1)
Project Quality Manager

Remarks:

SECTION 8: ACTION COMPLETION NOTIFICATION


(To be completed by Recepient)

Actions Taken:

Attachments:

Responsible Rep. Name Title Signature & Date

SECTION 9: FOLLOW-UP VERIFICATION AND CLOSE-OUT


(To be completed by the Originator and Project Quality Manager; Project Quality Manager to attach approved Supplier Technical
Deviation or Site Query Form, if applicable).

Follow-up Notes

Verified by (Inspector) [Name] [Signature] [Date]

Closed By (PQM) [Name] [Signature] [Date]


Approved By (PM)
[Name] [Signature] [Date]
(Category 1)
SECTION 10: DISTRIBUTION
(To be filled in by Originator and Project Quality Manager)
Project Engineering Manager Project Manager (PM)

2
Form No: 9686-QA/QC-FRM-0003 Rev.01
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
NON-CONFORMANCE REPORT

Project Engineer (PE) Procurement Manager


Project Quality Manager (PQM) Contractor /Supplier
Construction Manager (CM) Others (Specify)

3
Form No: 9686-QA/QC-FRM-0003 Rev.01