This permit document outlines the details of a planned excavation work, including: 1) The location and extent of excavation work to be completed. 2) Checks that were performed to identify the locations of any underground utility lines. 3) Required safety precautions that must be adopted during excavation such as test digging and using a spotter. 4) Sign-off from supervisors approving the permit and work plans.

Uploaded by

Marco Donati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views3 pages

Permit To Dig

This permit document outlines the details of a planned excavation work, including: 1) The location and extent of excavation work to be completed. 2) Checks that were performed to identify the locations of any underground utility lines. 3) Required safety precautions that must be adopted during excavation such as test digging and using a spotter. 4) Sign-off from supervisors approving the permit and work plans.

Uploaded by

Marco Donati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

PERMIT TO DIG A (3) 1.

018
This permit only applies to the work specified below,
and is only valid for the period of issue stated

PERSON COMPLETING
DATE:
PERMIT:
SITE LOCATION:

DETAILS AND EXTENT OF WORK:

Services Locations and drawings


Checked Attached Marked on Site
Water
Gas
BT
Electricity <415v
Electricity 415v – 11Kv
Electricity > 11Kv
Other
Total number of drawings attached

Actions to be adopted (Person approving permit delete as appropriate) Required


1 CAT survey prior AND during excavation work
2 Hand digging trials prior to excavation
3 Hand excavation only where services are marked or believed to be in existence
4 Use of spotter at point of excavation
5 Supervisor/Site Manager checks during excavation
6 Shoring/propping of excavation
7 Other (Details):

PERMIT VALID DATE PERMIT VALID TIMES


Details of restrictions relating to permit (To be identified before issuing)

All available drawings have been checked, statutory undertakers contacted and all services are
marked or staked out.

I have checked the intent of this permit and am of the opinion that all know information has been
checked/consulted and that the area is marked and ready for excavation.

Signature of Person Name of Person


Issuing Permit Issuing Permit
SIGNATURE OF PERSON NAME OF PERSON IN
IN CHARGE OF WORK CHARGE OF WORK

I certified that this permit to work is cancelled and that the task/activity detailed above has
been:- (* delete as applicable)

*a. Completed at___:___hrs on the______ (date).

*b. Stopped/Suspended. I concur that the task was stopped/suspended for the reasons
detailed below and arrangements have been put in place to prevent unauthorised
access.

The task detailed above has been stopped/suspended for the reasons detailed:

The following arrangements are in place to prevent unauthorised access to the work area:
Signature of Person Name of Person
Cancelling Permit Cancelling Permit

PERMIT TO DIG  
A (3) 1.018
This permit only applies to the work specified below,
and is only valid for the period of issue s
Details of restrictions relating to permit (To be identified before issuing)
All available drawings have been checked, statut
Signature of Person 
Cancelling Permit 
Name of Person 
Cancelling Permit