MANAGEMENT OF HEALTH & SAFETY POLICY

Statement of Health and Safety Policy


It is the policy of Al Bawani Co. Ltd. (the Company) that the operations of the Company are executed and managed at all times in such
a manner so as to ensure as far as reasonable practicable, the health and safety at work of all the Company employees and all other
persons including sub - contractor and members of the public who may be affected by the company’s operation.
Al Bawani provides quality and assured, high scale development through out Saudi Arabia. The board of management regard the
promotion of occupational health safety and welfare as a priority at all levels within its organization.
Al Bawani is therefore committed to:
 Improving site management and best practices so as to provide a safe and healthy work environment in compliance with
the relevant regularity, legislative and cooperate requirements, including the OSHAS 18001 international management
system and standard for health and safety;
 Identifying hazards and hierarchy of control to eliminated or reduce, as far as reasonable practicable, any risk identified
so as to prevent injury and ill health.
 Meeting its obligations to employees and other interested parties on health and safety matters and encouraging
employees to participates in health and safety management system;
 Continual improvement and performance measurement, by setting and reviewing on regular basis health and safety
objectives,targets and management programs at all levels within their company;
 Ensuring through appropriate training, planning and communication, that all personnel on site are aware of their
responsibilities regarding health and safety and are competent to perform their job.

The success of this policy requires the commitment from all employees and contractor. It is the responsibility of each
employees to observe all health and safety rules and procedures and co-operate with its statutory obligations.Employees must
be aware at all times of the responsibility that they have for both their own safety and safety of others.
Responsibility of implementation of the site policy lies with the Project Manger’s and site management. Who ensures through
the General Manager and site management that the objective of the health and safety policy are met.This health and safety
policy is communicated, implemented and maintained at all level of the organization. It is periodically reviewed and revised to
ensure it is continuing suitability and adequacy, and is available to external in interested parties upon request.
 In order to implement and enforce this policy vigorously, the company has established a site management structure changed
with specific responsibility for controlling all aspects of health and safety. Further, the company has developed an organization
chart showing the company site management structure as included in section 2.
 A more detailed Company management structure is available in the Company QA Manual. The Company recognizes the
importance and values of Co-operation from employees at all levels within the organization and also from its sub-contractor
and suppliers. Details of the duties assigned to employees , sub - contractors and suppliers are listed in Section 2. The duties
detailed are also expectations by the Company of how employees will fulfil their obligations regarding arranging and
administering construction work activities. This includes, but without limitation, owners representatives, employees of the
consultant, suppliers representatives and agents of regulatory or inspecting authorities. To this end all of those mentioned are
expected to report to security gates and make themselves known to site management or site safety staff before entering any
construction site of the Company.
 The Company will make every effort to ensure that operations not under its control on the project, which might be carried out
by other contractors and will not endanger the safety of personnel or sub contractor’s engaged on the project. To this end all
employees engaged in tasks or operations which have interfaces with others must report hazardous activities or unsafe
situations or conditions to their Supervisors or Engineers who will inform the safety department.
 The Company’s senior management gives full support to the Project Director, his construction management team and the
safety department in the implementation of the provisions of the plan and will make all necessary resources available to
ensure this becomes a reality.
 The Company’s HSE Manual will be issued as a mandatory document to the recipients noted on the distribution list and will be
made available on site for perusal and information by all site supervisory staff. The contents, main points and thrust of the plan
should be relayed to the workforce at inductions, method statement briefings and toolbox talks ass required. Visitors to the
site should also be informed that the plan is in place and they should be afforded an opportunity to view the contents if
necessary.
 Each project HSE plan is revised and updated as the project develops and as different works are about to proceed, the hazards
and risks of a particular task are identified and included in the safety plan, no works will proceed until the revision is included
and expected by the safety team, project manager, engineer and owner.
 Al Bawani are also committed to following the requirement of the client at all the times and will ensure that all personnel, sub
contractors and others concerned will comply with all safety requirement at all times. The safety department will appoint
competent, experienced personnel for the day to day safety management of the project. These personnel will be experience
and qualified safety personnel with knowledge of the safety project.
All safety personnel will be made aware of the requirement of the project as detailed in the tender document and contract
agreement.On award of contract, the company will carry out a full and detailed hazard and risk assessment of the proposed work
area, which will also include the safety measures we purpose to take to eliminate or reduce the risk. These assessments will be
included in the safety plan for assessment and approval of the control measures by the consultant and client.
 A detailed traffic management plan will be designed and implemented in accordance with the requirement of the client and
consultant.This will involve full hazard identification and risk assessment and approved control measures to be implemented
vigorously.
 A detailed security management plan will be designed and implemented in accordance with the requirement of the client and
consultant.This will involve full hazard identification and risk assessment and approved control measures to be implemented
vigorously.
 A detailed safe plan of work will be completed and implemented in accordance with the requirement of the of the client and
consultant and prior to any works commencing. This will involve full hazard identification and risk assessment and approved
control measures to be implemented vigorously.
 The Company operates a no smoking policy on their projects and this will be vigorously enforced throughout the duration of
the project. The Company will operate within the working hours and days as allows, if work is required outside of this time,
prior approval will be requested through the consultant. All personnel working on behalf of the Company will wear
identification tags and uniform at all times, any person found without these items will be immediately dismissed from the
project.
 The Company will provide suitable accommodation for all of their personnel, which will be inspected weekly by a member of
the safety team and any faults or defects will be reported to the accommodation manager and repaired or replaced
immediately. Any work which may affect or obstruct other Company’s works will be coordinated and planned with the relevant
personnel through a pre- commencement meeting. All issues will be discussed and relevant controls agreed and put in place.
 The Company is committed to ensuring that all relevant personnel are trained and experienced. All personnel who enter the
site are included, TBTs are carried out weekly, operators of plant are required to be assessed and accredited by a third party.
Fire training and first aid training is arranged on regular basis, IOSH training is arranged for personnel who have a role in which
safety is key element.
 The Company is committed to delivering an excellent project, on time, in budget and with the highest safety standards
pursuant to applicable laws.
‫س اسة إدارة الصحة والسﻼمة‬
‫ب ان س اسة الصحة والسﻼمة‬
‫أن يتم تنف ذ عمل ات ال كة و دارتها جميع اﻷوقات ط قة تضمن قدر المستطاع العم والصحة والسﻼمة العمل )ال كة( تتمثل س اسة كة البوا المحدودة‬
‫‪.‬موظ ال كة وجميع اﻷشخاص اﻵخ ن ما ذلك المقاول من ال اطن وأفراد الجمهور الذين قد يتأثرون عمل ات ال كة ‪.‬للجميع‬
‫عت مجلس اﻹدارة تع ز السﻼمة والصحة المهن ة أول ة ع جميع ‪.‬توفر البوا تط را عا الجودة ومضمونا ع نطاق واسع جميع أنحاء الممل ة الع ة السعود ة‬
‫‪.‬المست ات داخل مؤسسته‬
‫‪:‬لذلك تل م البوا ما‬
‫‪‬‬ ‫تحس إدارة الموقع وأفضل الممارسات لتوف ب ئة عمل آمنة وصح ة تتوافق مع المتطل ات النظام ة وال ع ة والتعاون ة ذات الصلة ‪ ،‬ما ذلك‬
‫ومع ار الصحة والسﻼمة ؛ ‪ OSHAS 18001‬نظام اﻹدارة الدو‬
‫‪‬‬ ‫حد ممكن عمل ا ‪ ،‬أي خطر تم تحد ده لمنع اﻹصا ة واعتﻼل‬ ‫تحد د المخاطر وال سلسل الهر للتح م من أجل القضاء ع أو تقل ل ‪ ،‬إ أق‬
‫‪.‬الصحة‬
‫‪‬‬ ‫الوفاء ال اماتها تجاه الموظف واﻷطراف المعن ة اﻷخرى شأن مسائل الصحة والسﻼمة و شجيع الموظف ع المشاركة نظام إدارة الصحة‬
‫والسﻼمة ؛‬
‫‪‬‬ ‫التحس المستمر وق اس اﻷداء ‪ ،‬من خﻼل تحد د ومراجعة أهداف الصحة والسﻼمة ع أساس منتظم وأهداف و رامج اﻹدارة ع جميع المست ات‬
‫داخل ال كة ؛‬
‫‪‬‬ ‫الموقع ع درا ة مسؤول اتهم ف ما يتعلق الصحة والسﻼمةوكفاءة‬ ‫التأ د من خﻼل التدر ب المناسب والتخط ط واﻻتصال ‪ ،‬أن جميع الموظف‬
‫‪.‬ﻷداء عملهم‬

‫تقع ع عاتق ل موظف مسؤول ة مراعاة جميع قواعد و جراءات الصحة والسﻼمة والتعاون مع ‪.‬يتطلب نجاح هذه الس اسة ال اما من جميع الموظف والمقاول‬
‫‪ .‬جب أن كون الموظفون ع درا ة جميع اﻷوقات المسؤول ة ال يتحملونها عن سﻼمتهم وسﻼمة اﻵخ ن ‪.‬ال اماته القانون ة‬
‫من ضمن من خﻼل المدير العام و دارة الموقع تحقيق هدف س اسة الصحة والسﻼمة ‪. ،‬تقع مسؤول ة تنف ذ س اسة الموقع ع عاتق مدير الم وع و دارة الموقع‬
‫تتم مراجعتها ومراجعتها ش ل دوري للتأ د من استمرار ‪.‬يتم توص ل س اسة الصحة والسﻼمة هذه وتنف ذها والمحافظة عليها ع جميع مست ات المؤسسة‬
‫‪.‬مﻼءمتهاوكفايتها ‪ ،‬ومتاحة لﻸطراف الخارج ة لدى اﻷطراف المعن ة عند الطلب‬
‫عﻼوة ع ‪.‬من أجل تنف ذ وفرض هذه الس اسة قوة ‪ ،‬أ شأت ال كة ه ل إدارة موقع تم تغي ه مسؤول ة محددة للتح م جميع جوانب الصحة والسﻼمة ‪‬‬
‫‪ 2.‬ذلك ‪ ،‬طورت ال كة مخططا تنظ م ا يوضح ه ل إدارة موقع ال كة ما هو مدرج القسم‬
‫تدرك ال كة أهم ة وق م التعاون من الموظف ع جميع المست ات داخل المنظمة ‪.‬يتوفر ه ل إدارة كة أ تفص ً دل ل ضمان الجودة الخاص ال كة ‪‬‬
‫والواج ات المفصلة أ ضا ‪ 2.‬يتم د تفاص ل الواج ات المو لة إ الموظف والمقاول من ال اطن والموردين القسم ‪.‬وكذلك من المقاول من ال اطن والموردين‬
‫وهذا شمل ‪ ،‬ع س ل المثال ﻻ الح ‪ ،‬ممث المﻼك وموظ ‪.‬توقعات ال كة حول ك ف ة وفاء الموظف ال اماتهم ف ما يتعلق ب ت ب و دارة أ شطة أعمال البناء‬
‫ولتحقيق هذه الغا ة ‪ ،‬يُتوقع من جميع المذكور ن إ ﻼغ البوا ات اﻷمن ة و ﻼغ إدارة الموقع أو ‪.‬المس شار وممث الموردين وو ﻼء السلطات التنظ م ة أو التفت ش‬
‫‪.‬موظ سﻼمة الموقع أنفسهم ق ل دخول أي موقع بناء تابع لل كة‬
‫س ذل ال كة قصارى جهدها لضمان أن العمل ات ال ﻻ تخضع لس طرتها ع الم وع ‪ ،‬وال قد يتم تنف ذها من ق ل مقاول آخ ن ولن تعرض للخطر سﻼمة ‪‬‬
‫المهام أو العمل ات ال لها واجهات مع اﻵخ ن ‪.‬الموظف أو المقاول من ال اطن المنخرط الم وع‬ ‫تحق قا لهذه الغا ة ‪ ،‬جب ع جميع الموظف المشارك‬
‫‪.‬اﻹ ﻼغ عن اﻷ شطة الخطرة أو المواقف أو الظروف غ اﻵمنة إ الم ف أو المهندس الذين س لغون إدارة السﻼمة‬
‫تقدم اﻹدارة العل ا لل كة الدعم ال امل لمدير الم وع وف ق إدارة اﻹ شاءات وقسم السﻼمة تنف ذ أح ام الخطة وستوفر جميع الموارد الﻼزمة لضمان تحقيق ‪‬‬
‫‪.‬ذلك‬
‫س تم إصدار دل ل الصحة والسﻼمة والب ئة الخاص ال كة كوث قة إلزام ة إ المستلم المذكور ن قائمة التوز ــع وس تم توف ه الموقع لﻼطﻼع عل ه ‪‬‬
‫جب نقل محت ات الخطة ونقاطها الرئ س ة ودفعها إ القوى العاملة التح ضات و جازات ب ان ‪.‬والمعلومات من ق ل جميع موظ اﻹ اف ع الموقع‬
‫‪ .‬جب أ ضا إ ﻼغ زوار الموقع أن الخطة جاهزة و جب منحهم فرصة لعرض المحت ات إذا لزم اﻷمر ‪.‬الط قة ومحادثات صندوق اﻷدوات المطل ة‬
‫ل م وع مع تطور الم وع ‪ ،‬ومع اق اب دء اﻷعمال المختلفة ‪ ،‬يتم تحد د المخاطر والمخاطر ‪‬‬ ‫تتم مراجعة وتحد ث خطة الصحة والسﻼمة والب ئة‬
‫‪.‬المتعلقة مهمة معينة و دراجها خطة السﻼمة ‪ ،‬ولن ستمر العمل ح يتم تضم المراجعة والمتوقعة من ق ل ف ق السﻼمة ومدير الم وع والمهندس والمالك‬
‫تل م البوا أ ضا ات اع متطل ات العم ل جميع اﻷوقات وستضمن امتثال جميع الموظف والمقاول الفرعي وغ هم من المعني لجميع متطل ات السﻼمة ‪‬‬
‫س كون هؤﻻء الموظفون من ذوي الخ ة وموظ السﻼمة ‪.‬س قوم قسم السﻼمة بتعي موظف أ فاء وذوي خ ة ﻹدارة السﻼمة اليوم ة للم وع ‪ .‬جميع اﻷوقات‬
‫‪.‬المؤهل ع درا ة م وع السﻼمة‬
‫س تم إعﻼم جميع موظ السﻼمة متطل ات الم وع ما هو مفصل وث قة المناقصة واتفاق ة العقد ‪ ،‬وعند إرساء العقد ‪ ،‬ستقوم ال كة ب جراء تقي م امل ومفصل‬
‫س تم تضم هذه ‪.‬للمخاطر والمخاطر منطقة العمل المق حة ‪ ،‬وال س نفذ أ ضا شمل تداب السﻼمة ال نهدف إ اتخاذها للقضاء ع المخاطر أو تقل لها‬
‫‪.‬التقي مات خطة السﻼمة لتقي م واعتماد تداب الرقا ة من ق ل اﻻس شاري والعم ل‬
‫س تم تصم م وتنف ذ خطة مفصلة ﻹدارة حركة المرور وفقا لمتطل ات العم ل واﻻس شاري ‪ ،‬وس شمل ذلك تحد دا ام ً للمخاطر وتقي م المخاطر و جراءات ‪‬‬
‫‪.‬التح م المعتمدة ال س تم تنف ذها قوة‬
‫س تم تصم م وتنف ذ خطة إدارة أمن ة مفصلة وفقا لمتطل ات العم ل والمس شار ‪ ،‬وس شمل ذلك تحد دا ام ً للمخاطر وتقي ما للمخاطر وتداب الرقا ة المعتمدة ‪‬‬
‫‪.‬ال س تم تنف ذها قوة‬
‫وس شمل ذلك التحد د ال امل للمخاطر وتقي م ‪.‬س تم اﻻنتهاء من خطة عمل مفصلة وآمنة وتنف ذها وفقا لمتطل ات العم ل والمس شار وق ل دء أي أعمال ‪‬‬
‫‪.‬المخاطر وتداب الرقا ة المعتمدة ال س تم تنف ذها قوة‬
‫مشار عها وس تم تطبيق ذلك قوة طوال مدة الم وع ‪‬‬ ‫ستعمل ال كة غضون ساعات وأ ام العمل ما سمح ‪ ،‬إذا ان ‪.‬تطبق ال كة س اسة عدم التدخ‬
‫س تدي جميع الموظف الذين عملون ن ا ة عن ال كة طاقات تع ف ة وز ا ‪.‬العمل مطل ا خارج هذا الوقت ‪ ،‬فس تم طلب موافقة مس قة من خﻼل اﻻس شاري‬
‫‪.‬رسم ا جميع اﻷوقات ‪ ،‬وس تم طرد أي شخص يتم العثور عل ه دون هذه العنا ع الفور من الم وع‬
‫ستوفر ال كة أما ن إقامة مناس ة لجميع موظفيها ‪ ،‬وال س تم فحصها أسبوع ا بواسطة أحد أعضاء ف ق السﻼمة وس تم إ ﻼغ مدير اﻹقامة أي عيوب أو عيوب ‪‬‬
‫س تم مناقشة ‪.‬س تم الت سيق والتخط ط ﻷي عمل قد يؤثر أو عيق أعمال ال كة اﻷخرى مع الموظف المعني من خﻼل اجتماع ما ق ل ال دء ‪.‬و صﻼحها ع الفور‬
‫‪.‬جميع القضا ا واﻻتفاق ع الضوا ط ذات الصلة وتنف ذها‬
‫يتم تضم جميع العامل الذين دخلون الموقع ‪ ،‬و تم تنف ذ مرك ات ثﻼ بوت ل القصدير ‪.‬تل م ال كة ضمان تدر ب جميع الموظف المعني وذو ــهم ‪‬‬
‫يتم ترت ب التدر ب ع الحرائق والتدر ب ع اﻹسعافات اﻷول ة ع أساس منتظم ‪. ،‬أسبوع ا ‪ ،‬و لزم أن يتم تقي م مشغ المصنع واعتمادهم من ق ل طرف ثالث‬
‫‪.‬لﻸفراد الذين لعبون دورا تكون ف ه السﻼمة عن ا أساس ا ‪ IOSH‬و تم ترت ب تدر ب‬
‫‪.‬تل م ال كة بتقد م م وع ممتاز الوقت المحدد و الم ان ة و أع معاي السﻼمة وفقا للقوان المعمول بها ‪‬‬