Form QHSE-ST069

METITO (OVERSEAS) LIMITED


Rev 2

Date 09.06.2021
INSPECTION REPORT
Page 1 of 1

Vendor
Client
Project
Project No
Metito PO. No.
RFI Ref. No. RFI – DDMMYY-Project no.-items
Stage of Inspection
Date of Inspection
Project Engineer and Manager

S.No Item Description Qty Observations

Conclusions

Actions Required (if any) Action by

Next Stage of inspection and date


(in agreement with all interested parties i.e Vendor, Client (TPI))

Attachments (if any) :

Metito Main Contractor Client/ TPI


Name
Designation
Signature

lin69083 03-Mar-2023 00:22:11 P411870 65.1310 4-1800070 P. 7/8 St:EN 03/03/23 MC-00405
SKID ASSEMBLY LEAK TEST RECORD

PROJECT TITLE: MANYAR SMELTER DESALINATION PROJECT

CONTRACT NO.: REPORT No.

SKID TITLE. : DATE:

LOCATION:

NO. PIPING GA DRAWING NUMBER REV. SKID TITLE / TAG NUMBER REMARKS

FLUSHING : DRYING (AFTER HYDRO TEST):

TEST CONDITIONS

Test Medium : Chloride Content (for Stainless Steel):

Ambient Temp. : Pressure Gauge Serial No :

Test Pressure : Calibration Expiry date :

Test Started at : PRV serial No. / Cal. expiry date

Test Ended at : PRV Set Pressure:

Holding Time : Manifold Serial No.

REMARKS:

TEST RESULT : Accepted Rejected


METITO CONSTRUCTION METITO QC BV END USER

NAME

DESIGNATION
SIGNATURE
DATE