CONCRETE WORK
Equipment description: NA
Tag/Item number(s): NA
1.0 DEFINITIONS....................................................................................................................................................3
ATTACHMENTS
REVISION HISTORY
REV. O : ORIGINAL
CEMENT TYPE CEM IIIB CEM IIIB CEM IIIB+SR CEM IIIB+SR CEM IIIB+SR CEM IIIB
1. 2) Concrete supply and test Each Mix Design a) Ready mixed concrete shall be supplied by Waybill R R R
Delivery T-4.102.006 Rev.B concrete supplier designated by COMPANY
b) Design and testing of concrete mixes, and
all testing on ready mixed concrete shall be
carried out by the concrete supplier.
c) The concrete mixes to be supplied by the
supplier shall be in accordance with the
above mix design
d) Compressive strength test results shall be
confirmed periodically with provided test
results by COMPANY and THC shall
maintain and update the list of waybill to
assure traceability
2. Reinforcing Steel Each Standard Drawing a) The reinforcing material shal be in Mill H W SW
Delivery T-4.102.111 accordance with BS4449, BS4483, Certificate
Material Sec.4 ENV10080, ASTM A615 or ASTM A617(T-
4.102.111 Sec.4)
b) Reinforcing material for general concrete
work shall be hot rolled high yield deformed
bars Type-2, with minimum yield strength of
460Mpa in accordance with BS4449(T-
4.102.111 Sec.4)
c) Steel wire fabric reinforcement shall be
A193 in accordance with BS4483 or
equivalint(T-4.102.111 Sec.4)
3. Embedded Items
1) Anchor Bolts Each Standard Drawing a) Anchor bolts shall comply with the Mill R R R
Delivery T-4.102.111 requirement of BS 3692 and BS EN ISO Certificate
(Material Sec. 6) 898-1 Grade 8.8(T-4.102.111 Sec.6)
T-4.102.118 b) Nuts shall be one grade higher than their
(Detail for Anchor Bolt) respective bolt, e.g. grade 10 for gard 8.8
bolts, with requirement of BS EN ISO
4032(T-4.102.111 Sec.6)
c) Washers for all grades of bolt shall comply
with requirements of BS4320, Form E(T-
4.102.111 Sec.6)
d) Materials for sleeves and anchor plates for
all grades of bolts shall comply with the
requirements of BS EN 10025 grade
S275JR(T-4.102.111 Sec.6)
2) Embedded Plates Each Standard Drawing a) Miscellaneous steel shall comply with the Mill R R R
Delivery T-4.102.113 requirements of BS EN 10025 Grade Certificate
(Material Sec. 2) S275JR or ASTM A36 or JIS G3101 SS400 Galvanizing
(T-4.102.113 Sec.2) Record
b) Miscellaneous steel including embedded
item in concrete shall be hot dip galvanized
in accordance with BS EN ISO 1461 or
ASTM A123(T-4.102.113 Sec.2)
4. Protective coating Each T-4.102.112 Sec.9 a) All buried structural concrete, including top Mill R R R
Delivery (Coating) surface of blinding, is to be coated with Certificate
water based bituminous emulsion.(T-
4.102.112 Sec.9)
: Nitoproof10 from FOSROC or Equivalent
5. Engineering Fill Material Any chage T-4.102.010 Sec.3.0 a) Engineering fill (Type A or Type B fill) will Test W SW SW
source or be used to replace the deleterious natural Report
every material or to raise natural ground surface
1,000㎥ elevation to required levels(T-4.102.010
Sec.3.0)
T-13.376.490 Sec.10
Fines
Type Max. Size LL Compaction test
content
A 50mm 15% max 25% max every 300㎡
B 75mm 30% max 40% max every 750㎡
1) Cleanness Inspection of Base Rock) a) Loose particles, debris and any foreign No.16
materials shall be removed (TB-00641)
5. Protective coating Each T-4.102.112 Rev.A General a) All buried structural concrete including top F02:005 W SW SW
Bleow Note 9 surface of blinding, is to be coated with
Ground T-4.102.006 Rev.B Att.2: T- water based bituminous emulsion
Structure 13.376.358 Rev.G b) Coating shall extend above grade 250mm
Section 3.2 & 3.32 c) Coating applying on the Blinding concrete
PI-098-THC-PMC-TQ-00797 Within 3~14days after pouring concrete
(PI098-THC-PMC-TQ-00797)
6. Construction Joint Each BS 8110-1 Clause 6.2.9 a) Removing surface laitance and expose F02:001 W W
control Joint T-4.102.006 Rev.B Att.2: T- aggregate(T-13.376.358 Sec.3.2.1)
13.376.358 Rev.G
b) Mechanical scrabbling depth : 5mm(T-
13.376.358 Sec.3.2.1)
7. Rebar installation Each T-4.102.006 Rev.B Att.2: d) Rebar shall be installed in accordance with F02:001
Structure T-13.376.358 Rev.G relevant drawings(spacing, size, locations,
T-4.102.006 Rev.B Att.3: number, length, lapping length)
DEP34.19.20.31 Section 6.2 e) Welding of reinforcing steel should be
avoided and if necessary the relevant
welding standards shall be adopted,
especially regarding welder qualifications
and the recommendations of the
reinforcement manufacturer(T-4.102.112
Sec.7.3)
f) Spacer blocks shall be proprietary factory
made type(DEP 34.19.20.31 Sec.6.2)
g) Non-concrete spacer blocks shall not be
used(DEP 34.19.20.31 Sec.6.2)
8. Embedded Items Each T-4.102.006 Rev.B Att.3: e) All projection water stop and metal seals F02:001
Installation DEP34.19.20.31 Section 13 shall be supported and protected from
(T-4.102.112 Sec.8)
damage and exposure during construction.
f) Anchor bolt shall be properly protected
against damage and corrosion until the
equipment/structure is permanently
installed(DEP 34.19.20.31 Sec.13)
9. - Pre-cast concrete Each T-4.102.006 Rev.B Att.2: T- a) Exposed to earth, weather or water F02:001 FSI
Formwork 13.376.358 Rev.G - Wall panels : 40mm Q03F Item
Section 3.2.2 - Other members : 50mm No.04
b) Not exposed to weather or not in contact
with the ground
- Wall panels, Slabs : 30mm
- Other members : 40mm
9. 2) Formwork Setting out Each T-4.102.006 Rev.B Att.3: DEP a) Construction tolerance F02:001
Formwork 34.19.20.31 Section 2.1
In the Lines and surfaces of columns, piers, In any story or 5.00m ±5mm
2
walls and arises max. and in 25.00m ±50mm
11. Pouring Each T-4.102.006 Rev.B Att.3: DEP - Mixing Time : total time required for Rabban
Mixer 34.19.20.31 mixing, transportation and pouring of the MedGulf
Truck TB-No.00561 concrete : Max. 60 minutes Format
( DEP 34.19.20.31 Sec.8.1.2)
- Cement content : 420kg for C32/40
(TB-No.00561)
- Actual W/C : 0.4 for C32/40
- Contents of Micro fiber(Cemfiber) : For
Paving concrete 0.6kg/m3(TB-No.00618)
12. Curing T-4.102.006 Rev.B Att.2: T- e) The curing system shall consist of fully pre- F02:003
13.376.358 Rev.G wetted Hessian installed in as close a
BS EN 1008 contact with the concrete as possible and a
protective double layer of 500 gauge
(125micron) opague or reflective polythene
sheeting wrapped around and sealed
immediately(T-13.376.358 Sec.9.12)
f) Formwork to slab and beam soffits shall be
kept in position for a minimum of 10 days to
prevent drying of the concrete surface (T-
13.376.358 Sec.9.15)
g) Curing system shall be kept in position and
maintained in a wet condition for a minimum
of 10 days from time of concrete pour
completion (T-13.376.358 Sec.9.19)
12. Curing T-4.102.006 Rev.B Att.2: T- h) All water used for curing shall comply with F02:003
13.376.358 Rev.G the requirements of BS EN 1008 “Using
BS EN 1008 water for concrete(T-13.376.358 Sec.9.16)
13. Heat of hydration Each a) Thermocouples shall be used to monitor F02:007 H W SW FSI Q03F
Case the temperature of wall and slab : ≥800mm(T- Feedback
13.376.358 Rev.G Section 7.4) Item No.01
16. Acceptance for Each T-4.102.006 Rev.B Att.3: a) Refer to This ITP (T-4.109.822 Sec.9 2)) F02:009 H W SW
Equipment Installation Foundation DEP34.19.20.31 (DEP 34.19.20.31 Section 2.)
17. Grouting Each T-4.102.006 Rev.B Att.3: a) Refer to ITP No. T-4.109.843 : ITP for H H H
Pouring DEP34.19.20.31 Sec.10 Steel structure & fireproofing work
A.3
7 B.8
Anchor Bolts, Embedded parts.
A.3 Confirmed by
8 B.8
Mechanical embedment Mech. section
A.3 Confirmed by
10 B.8
Piping embedment Piping section
11 Others
Remark :
Location : Discipline :
DWG No. :
Conclusion
ITP
NO. CHECK ITEM Checked (Accept REMARK
T-109.822
/Reject)
Check Waybill
4 Others
Remarks
Poured Location Detail(if required) :
Location : Discipline :
Curing
a) The curing system shall consist of fully pre- wetted
Hessian installed in as close a contact with the
concrete as possible and a protective double layer of
4 Others
Remarks
Poured Location Detail(if required) :
THC(Recorded)
THC CSC CSC CSC CSC CSC THC CSC THC CSC CSC
Tested CSC
Cement Site Test
Date Mark Mix Delivery Strength @ Strength @
Mix No. Truck No. Vol. Content Conc. Flow Location / Area
Casted No. Grade Ticket No. 7 days (MPa) 28 days (MPa)
(kg/m3) Temp (mm)
Material :
ITP Conclusion
NO. CHECK ITEM Checked REMARK
T-109.822 (Accept/Reject)
5 Others
REMARKS :
Location : Discipline :
DWG No. :
ITP Conclusion
NO. CHECK ITEM Checked REMARK
T-109.822 (Accept/Reject)
9 Others
REMARKS :
Location : Discipline :
DWG No. :
Date Time Point 1 Point 2 Point 3 Point 4 Point 5 Point6 Point7 Point8
Structure identification :
ITP Conclusion
NO. CHECK ITEM Checked
T-109.822 (Accept/Reject)
Cleanness
Required more
1 B.1 - Loose particles, debris and any foreign Acceptable
cleaning
materials shall be removed
Cracks on the rock
2 B.1 - Any visible crack to be sketched and do not exist found carcks
reported
Cavities
3 B.1 do not exist found cavity
- Width, depth and location to be reported
Distinctive rock
investigated
- Much distinctive rocks against the others No distinctive
4 B.1 much distintive
rock
shall be taken photo and reported rock
Sketch (if observed Crack, Cavity, Distinctive rock, inspector have to sketch at below and take photo)
Area :
Structure identification :
ITP
NO. Description of Check Conclusion
T-109.822
B.9.2)
1 B.16
Dimension of foundation □ Accept □ Reject
B.9.2)
2 B.16
Elevation of foundation □ Accept □ Reject
B.9.2) No Found
3 B.16
Any defect or damage on the concrete □ Defects
□ Defects
B.9.2)
4 B.16
Anchor bolts location, elevation, projection □ Accept □ Reject
B.9.2)
5 B.16
As-Built survey report for foundation □ Accept □ Reject
6 Others
Remark :