Head Office : Palmiye Mah. Adnan menderes Bulv. Oktay Sitesi No: 9/8 PK = 33100 Yeniehir /Mersin TURKEY P:+90 324 3260595 F:+90 324 3260596 Ankara Office : UUR MUMCU CAD(krolu cad) ERDL APT 87/13 Gop-ankaya -Ankara-TURKYE P: +90 312 447 17 18 / 20 F:+90 312 447 17 21 stanbul Office: Burhanye Mahalles amlca Caddesi hlamur villalar no 28 / 6^RD3K Villa ^ Beylerbeyi skdar stanbul / TURKEY P : +90 216 4220414 PBX F: +90 216 4220415 www.edopec.com. info@edopec.com

Document Title

SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK


Document No.
Rev EDO
Co. Org. Cod

Scale

PLN
Doc Type

QAC
Disc. Code

GNR
Unit Code

INT
Prj. Type

XXX
Prj. NO

013
Prj. Year

110
Proj. Seq.No

111
DCC Seq.No

A
Page

11

of 31

INDEX
1.
1. General

Quality Management 3

3
3 3 5 6

Objectives EDOPEC Duties CUSTOMER Duties Specific Requirements

Quality Management System


EDOPEC 's Plans and Procedures

6
7

EDOPEC Interface and Oversight of Sub-contractors, Vendor and Sub-Vendors ATTACHMENTS 2. Attachment Quality Plan Contents 9
Overview of Quality Plan Contents: The Quality Plan should provide detailed descriptions of:

8 9
9 9

3. Attachment :Inspection and Test Plans


Overview:

11
11 12 12 12

4. Attachment 1-3:Criticality Rating System 12


General Principles Process

5. Attachment : Criticality Rating (CR) Determination 6. Attachment: Organizational Responsibilities 14


Personnel and Responsibilities:

13
14

7. Attachment 1-6:Control Procedures 16 8. Attachment: Form B-2 Typical Inspection and Test Plan Format

17

Page 1 of 5 17 9. ORIGINATOR: 17 10. STORAGE TANKS 17 Preparation of activity 17 Verification of inspectors qualifications 17 17 Verification of NDT technicians qualifications FABRICATE AND ERECTION 18 Submit radiographs. 19 Monitor quality of test medium. 20 20 Hydrostatically test tank. Survey fill vertical levels and Peaking and Banding 20 20 Internal inspection (post hydrotest) 11. AS BUILT DRAWINGS 21 12. Attachment: Form C-1 Design EDOPEC Quality Submittal Requirements (DQSR) 22 13. Attachment 5-8: Form D-1 Page 2 24 14. Attachment 5-8: Form E-1 Page 1 Construction/Installation/Hook-Up Quality Submittal Requirements (CQSR) 25 Attachment 5-8: Form E-1 Page 2 26
. Project: Document Title: Revision:
SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

3
15. Attachment 5-9: Levels of Vendor Surveillance and Site Inspection
Levels of Vendor or Site Surveillance

of 31
27

27

1. Quality Management General


This section establishes CUSTOMER 's Quality assurance and control (QA/QC) requirements that will provide assurance that Ammonia Storage Tank Project will conform to Tender Documents regulatory requirements, and sound and generally accepted engineering and construction practices. In this regard, Quality Management is applicable to all Ammonia Storage Tank works activities of EDOPEC.

Objectives
The objectives of quality assurance are: Ensure installed CUSTOMER meet requirements as defined in Tender Documents and the supporting design and construction specifications, drawings, etc. Ensure non-conformances are reported and resolved through approved dispositions and follow up actions to confirm acceptable results. Provide documentation that confirms compliance with project requirements and is sufficient to support production operations. Provide early identification of process failures and hardware non-conformance to minimize rework cost and schedule impacts.

EDOPEC Duties
a. Comply with TENDER DOCUMENTS , through the application of approved Quality Plans, Inspection and Test Plans and Control Procedures and ensure that EDOPEC has and utilizes similar plans and procedures. b. Ensure Quality through, CUSTOMER and Storage Tank works , ,CUSTOMER and Storage Tank works performed by EDOPEC. c. Provide Quality Assurance for Storage Tank works , consisting of all those planned and systematic activities that are necessary to establish quality requirements and to ascertain with confidence that Storage Tank works will conform to established requirements and perform satisfactorily in service.

d. Provide Quality Control for and Storage Tank works , consisting of those quality assurance controls, operational techniques, and activities that provide a means of measuring and controlling the characteristics of an item, element, component, product, service, or installation to meet the established requirements. e. Prepare required Quality Plans and Inspection and Test Plans and submit to CUSTOMER for approval, before start of the corresponding part of Storage Tank works . Prepare and submit Control Procedures for CUSTOMER review and comment. f. Define and staff the overall organization to manage and control quality of Storage Tank works

g. Identify and resolve deficiencies detected during the execution of Storage Tank works . h. Ensure qualified inputs, qualified resources, personnel, tools, equipment and materials, and qualified Storage Tank works processes are used to produce Storage Tank works products in conformance with Tender Documents .
. Project: Document Title: Revision:
SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

4
i. Address and resolve, to CUSTOMER 's satisfaction, issues identified during: j. CUSTOMER reviews, audits, surveillance, and inspection

of 31

Third party reviews and inspections (e.g., Warranty Survey, Class Certification, Regulatory Certification, Source Inspection)

Provide CUSTOMER personnel and designated representatives timely and free access to all places where Storage Tank works is performed, including, but not limited to, materials, equipment, Storage Tank works SITES documents, and records for the purpose of review, inspection, audits and surveillance. EDOPEC shall ensure that Subcontractor s, vendors and sub-vendors are also required to provide this right of access. Support CUSTOMER 's QA/QC activities related to Storage Tank works . In addition, EDOPEC shall: Submit EDOPEC 's Quality Audit schedule, including audits of EDOPEC , Subcontractor s, vendors and sub-vendors to CUSTOMER for review and comment. Implement and maintain the Quality Audit Schedule to provide periodic verification of compliance with the approved Quality Plans, Inspection and Test Plans and associated Control Procedures including those of Subcontractor s, vendors and sub-vendors. Perform design control, including establishing design requirements, reviewing design inputs, and reviewing and approving design outputs. Provide design review and approval matrix identifying EDOPEC and CUSTOMER participation. Control design changes. Maintain design change control log. Include review by Quality Representative for compliance with Quality requirements. Prepare design review plan and design verification plan. Conduct design reviews and verification, including independent reviews, to ensure that design requirements are met. Define Equipment Criticality Ratings and provide Criticality Rating Matrix for procured items unless advised by CUSTOMER of items for which Criticality Rating is not required. Approve Manufacturing Procedures for major procured materials such as line pipe and structural steel. Include review by Quality Personnel for compliance with Quality requirements. Require and approve Subcontractor and vendor Quality Plans, Control Procedures and Inspection and Test Plans as applicable. Track all Quality submittals and maintain a register of status to ensure that submittals are provided, and approved in a timely manner. Conduct reviews of procurement documents by Quality personnel for compliance with Quality requirements. Conduct pre-production and pre-inspection meetings as applicable to Storage Tank works for Subcontractor and vendors providing critical services, material and equipment. Detect, report and control non-conforming processes and items, including Subcontractor , vendor and sub-vendor activities. Conduct vendor and Source Inspection and Field Inspection and Surveillance in accordance with EDOPEC 's Control Procedure. Identify, segregate, control, track, and certify equipment and materials that will be incorporated into the FACILITY, including Positive Materials Identification (PMI) for alloy materials.

k. l.

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

of 31

Conduct in-process inspection during fabrication, construction, installation and hook-up and commissioning. Cover all disciplines required to complete critical items. Provide sufficient notification as required by CUSTOMER of impending inspection and tests involving CUSTOMER participation. Provide Quality metrics for gauging Quality performance, and report status monthly. Develop and implement corrective and preventive actions to resolve Quality issues and concerns for all phases of Storage Tank works . Resolve all non-conformances. Provide and control all Inspection and Test records and associated Quality related documentation, including the collation in relevant sections of the Documentation for Operations (DFO) and the ultimate hand-over to CUSTOMER as specified in the Coordination Procedures. Review and approve DFO provided by the respective Subcontractor s, vendors and sub-vendors to ensure that Project Quality requirements have been met. Forms C-1, D-1 and E-1, are a tool for ensuring identification, organization and submittal of all Quality related documentation. EDOPEC may utilize its own system and format for this activity as long as it captures the same degree of information contained in CUSTOMER 's forms.

CUSTOMER Duties
a. CUSTOMER shall perform certain QA/QC activities, however the performance of which shall not relieve EDOPEC of its responsibilities to ensure compliance with Tender Documents or EDOPEC 's overall responsibility for quality of Storage Tank works . CUSTOMER 's Quality activities include: Source Inspection CUSTOMER may conduct independent source inspections as Storage Tank works progresses. Results of CUSTOMER source inspections will be made available to EDOPEC . Design Reviews (both day-to-day review of design documents and EDOPEC conducted formal design review meetings) Storage Tank works , CUSTOMER will perform reviews of design documents. CUSTOMER 's Specialists will meet with EDOPEC 's engineers periodically to discuss various aspects of and Storage Tank works . EDOPEC shall provide the documentation required for Design Reviews and shall follow up on all items not resolved during a review. QA Audit CUSTOMER will audit EDOPEC 's QA/QC program. Audit scope will include but not be limited to: (i) review of EDOPEC 's documented QA/QC procedure, (ii) random review of EDOPEC 's procurement documents for inspection and specification content, (iii) EDOPEC 's specific equipment inspection plans in relation to specification requirements and Criticality Rating assessments, (iv) review of inspector's surveillance and nonconformance reports, (v) EDOPEC 's deviation log and procedure approval logs, (vi) receipt inspection discrepancy reports and field inspection reports, and (vii) activities undertaken by Subcontractor s, vendors and sub-vendors.

b. Approve EDOPEC , Subcontractor and critical vendor and sub-vendor Quality Plans and Inspection and Test Plans prior to start of Storage Tank works . c. Review and comment on EDOPEC's Control Procedures and audit schedule and monitor compliance. CUSTOMER will monitor the resolution of any issues raised.

d. Participate in design control, including review design input and review and approve design output per identified review and approval requirements.

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

of 31

e. Approve Equipment Criticality Ratings and Criticality Rating Matrix prior to procurement or provide the Equipment Criticality Ratings. f. Review procurement documents, including changes, for technical and Quality compliance for critical items prior to issue.

g. Participate in selected pre-inspection and pre-production meetings. h. Conduct oversight of EDOPEC 's Quality activities including but not limited to vendor Inspection activities, Field Inspection and surveillance activities. Participate in inspection and test stages per approved Inspection and Test Plans (ITPs). i. Approve Non-Conformance Reports (NCRs) where proposed dispositions do not result in meeting the Tender Documents .

Specific Requirements
Quality Management System
EDOPEC shall have a documented and functional Quality Management System or Program in place to ensure the quality of Storage Tank works . EDOPEC is not required to submit the Quality Management System and Program for CUSTOMER approval, but it shall be available to CUSTOMER Representatives for reference during the execution of Quality audits, inspection, testing and surveillance. The Quality Management System shall: a. Emphasize building Quality into Storage Tank works product through use of documented control processes that incorporate necessary activities to ensure Quality. b. Be formally documented and in compliance with a recognized national or international Quality Standard such as ISO-9000 or API-Q1. Accreditation is not required, except where specifically defined for a specific component. (e.g., API Specification Q1 monogram or ASME Code Stamping). c. Be supported by an established Quality organization meeting the requirements, with qualified resources, and formally documented control procedures to effectively administer and implement the requirements.

d. Produce documentation to demonstrate the quality of Storage Tank works performed. e. Be supported by a functioning audit program to provide verification of compliance with quality requirements during Storage Tank works . f. Be able to demonstrate that: All personnel related to a given Storage Tank works job requirements. process, understand the respective

Qualified inputs are utilized in Storage Tank works processes to produce Storage Tank works products that meet Tender Documents . Quality process inputs include qualified workers, qualified tools, qualified equipment and qualified materials. Storage Tank works products are in compliance with the specified tender documents through inspection and surveillance. The extent of inspection and surveillance is commensurate with the risk, cost, schedule, safety, and the magnitude of any quality problems that may adversely impact Storage Tank works . All re-work is recorded and the cause is identified for all Storage Tank works processes.
Prj. Identification:

. Project: Document Title: Revision:

SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Document No.:

EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

of 31

EDOPEC 's Plans and Procedures


Quality Plan EDOPEC shall submit the Project Quality Plan (PQP) to CUSTOMER for approval. The Quality Plan may be based on existing Quality Management Systems or Programs in use but shall comply with the requirements listed. Individual Quality Plans are also required for the following: i. ii. Design Subcontractors. Vendors, and sub-vendors (as identified in the vendor's list of sub-vendors) approved by the CUSTOMER , supplying critical materials and equipment (medium and high criticality as defined including shop fabricators and manufactures.

iii. Construction, Installation, Hook-Up Subcontractors. a. Control Procedures EDOPEC shall provide control procedures to reflect the quality activities of the Tender Documents and implement the Project Quality Plan for all phases of Storage Tank works . EDOPEC shall, as far as practical, provide existing procedures that adequately address the controls required for quality activities. Detailed description of ,CUSTOMER and Storage Tank works is to be performed, reviews, approvals required and checks and inspection to be conducted, including responsibilities Timing of the required checks and inspections in Storage Tank works sequence Accept and reject criteria applicable to the activity and/or approval requirements.

b. Inspection and Test Plans EDOPEC shall submit Inspection and Test Plans (ITPs) in compliance with CUSTOMER for approval prior to start of Storage Tank works activity covered by tender documents. The preferred format is provided EDOPEC may adopt any format that conveys the same level of information and addresses the sequencing of Storage Tank works . ITPs may be submitted separately for each discipline or as a combined document. Individual ITPs for detailed design, manufacturing, fabrication, construction, installation, hook-up and commissioning are required for the following: i. ii. EDOPEC when Storage Tank works is performed directly Vendors, and sub-vendors as identified in the vendor's list of sub-vendors approved by CUSTOMER , supplying critical materials and equipment, including shop fabrication and manufacturers

iii. Construction, Installation, Hook-Up Subcontractors Additionally EDOPEC shall ensure that inspection and testing activities conducted during Storage Tank works are: iv. In accordance with approved control procedures v. Conducted at agreed pre-designated stages

vi. Coordinated with CUSTOMER and regulatory authority with adequate notification of nominated hold and witness points requiring their participation vii. Supported by documentation generated to provide objective evidence of acceptable quality and compliance with CUSTOMER specified requirements

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

8
EDOPEC Interface and Oversight of Sub-contractors, Vendor and Sub-Vendors
c. Criticality Rating for Procured Materials and Equipment

of 31

Criticality System shall be used to establish the criticality ratings. Criticality ratings are to be determined by EDOPEC and submitted for CUSTOMER approval prior to commitment. CUSTOMER requires that the extent of quality activities related to procured materials and equipment will be based on the criticality of the goods to be provided, where the SPECIFICATION does not have specific requirements.

d. EDOPEC is responsible for: Ensuring Subcontractor s, vendors and sub-vendors selected to execute elements of the project Storage Tank works scope are approved by CUSTOMER prior to commitment. Ensuring that applicable CUSTOMER quality requirements are communicated to Subcontractors, vendors and sub-vendors and ensuring that the requirements, including certification, are implemented. Identification of Subcontractor and vendor Quality Submittals, Quality Plans, Control Procedures and Inspection, and Test Plans for EDOPEC review and approval prior to start of Storage Tank works . Where identified by CUSTOMER and EDOPEC , submittal of Subcontractor , vendor and sub-vendor Quality Documents, Quality Plans, and Inspection and Test Plans for CUSTOMER approval. All quality-related documentation, inspection and test records are generated as required by SPECIFICATION. Providing notification and obtaining CUSTOMER prior approval of dispositions for any non-conforming conditions which do not result in meeting SPECIFICATION, including, but not limited to, "repair" or "use as is."

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

of 31

ATTACHMENTS Attachment Quality Plan Contents


Overview of Quality Plan Contents:
(a) (b) (c) (d) (e) (f) (g) (h) Scope Quality Objectives Definitions, Terms and Abbreviations Organization Chart and Quality related Roles and Responsibilities associated with Technical and Quality activities for all project phases Management Review of CONTRACT and Purchase Orders Information Management System Audit Planning including Project Audit schedule, to include timing and frequency for EDOPEC activities and critical Subcontractor s, vendors and sub-vendors. Listing of all Control Procedures required to perform Storage Tank works .

The Quality Plan should provide detailed descriptions of:


(i) Responsibilities of EDOPEC 's management related to Quality activities with special attention to interfacing with non-English speaking organizations.

The systems and procedures EDOPEC will use to ensure that quality is an intrinsic part of all aspects of Storage Tank works and the resulting FACILITY, including: How information, reports and records relating to quality assurance and quality control will flow among the various groups (e.g., design, engineering, purchasing, construction, controls, other EDOPEC s) and CUSTOMER and how this information will be stored and retrieved. How site specific codes and standards will be analyzed in conjunction with the SPECIFICATION and EDOPEC 's internal standards to ensure that the engineering design will comply with Tender Documents , sound and generally accepted practice, and regulatory requirements. How procurement documents will be prepared to properly establish requirements with Subcontractors, vendors and sub-vendors. EDOPEC shall have major Subcontractors, vendors and sub-vendors prepare a product-specific or service-specific quality assurance plan for their respective scopes of supply. How potential Subcontractors, vendors and sub-vendors will be evaluated/selected to ensure they have the requisite resources, tools, procedures, and quality capabilities to meet established requirements. How individual inspection plans will be prepared for each equipment or material item assigned a Criticality Rating Category of medium or high. Each plan shall include a list of the specifications that must be met, describe the tests that will be done to ensure compliance, and identify who will perform the tests. Further, each such plan shall identify
Prj. Identification:
SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

. Project: Document Title: Revision: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

10 of 31
inspections and Quality steps that will be taken by the Subcontractor s, vendors and subvendors in addition to those done by EDOPEC or CUSTOMER . How calculations and fabrication drawings prepared by Subcontractors, vendors and subvendors will be reviewed for consistency with engineering design and standards. How records will be maintained to demonstrate that all design, materials, equipment, and construction conforms to established requirements and how and in what form the records will be turned over to CUSTOMER . How nonconformities, concessions and waivers shall be controlled and resolved including the process that will be used, the personnel responsible for administering the process, and the information flow through EDOPEC 's organization for resolution. How all instruments used for testing and inspection in Storage Tank works will be properly certified, including positive material identification (PMI) devices, equipment for calibrating instrumentation, hydrostatic test gauges, and the like. EDOPEC shall identify the instruments to be certified and describe the methods to be used.

The auditing, appraising, sampling techniques, reviews, and reporting EDOPEC intends to carry out for Storage Tank works to confirm the effectiveness of the Quality activities, and that the Quality programs and systems are indeed delivering the quality required. The way EDOPEC plans to meet CUSTOMER s requirements for PMI, source inspection, and field quality control including the frequency of testing, the locations where the testing will be conducted and the types of test equipment to be used.

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

11 of 31

Attachment :Inspection and Test Plans


Overview:
(j) Where practical all disciplines involved in Storage Tank works should be included in a single Inspection and Test Plan (ITP).

Each ITP format may vary however, the following information is required to be included in an ITP: Activity and associated control procedure and specification reference governing the activity ACCEPTANCE Criteria Responsibility for activity execution Objective evidence of activity execution or verifying document EDOPEC and Vendor participation at the inspection and test stages listed CUSTOMER participation as required Certification as required Authorized Inspector and CVA participation

ITPs shall, as far as practical, follow Storage Tank works sequence. ITPs shall identify the stages requiring approval, inspection and testing that include participation by CUSTOMER , Third party and others, in addition to those inspection stages normally undertaken by EDOPEC .

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

12 of 31

Attachment 1-3:Criticality Rating System


General
(k) Quality activities are driven by a formal criticality rating processes which considers: Safety, operability, and financial consequences Probability factors, including design complexity and manufacturing and fabrication complexity

Principles
(l) (m) The degree of Quality planning, level of inspection, oversight and verification is driven by criticality. Users are responsible to use this criticality rating process as a tool to reach a reasonable action plan. It is not intended to replace good judgement and experience. Actions can be added or deleted from the those indicated for the risk rating, based on a variety of factors such as experience or knowledge of vendor strengths and weaknesses.

Process
(n) (o) Criticality Ratings and Inspection coverage levels are developed for each procurement package for materials, equipment, and group of similar packages as outlined below. Identify the item or group of items to be procured. Use the Criticality Rating Form, to develop the base Criticality Rating established from the following, The lowest criticality index number (i.e., 1 is lower than 2) determined for any of the following: FACILITY or financial consequences or safety factors, and The lowest criticality alphabetical index (i.e., A is lower than B) determined for either design factors or manufacturing complexity.

The indices shall be plotted on the block chart as included in order to determine the base criticality rating. This value may be amended based on judgement factors such as experience and previous knowledge of the vendor, and or vendor location, selected to provide the materials or equipment for incorporation into the project. In the event that the base rating is amended, the Worksheet shall be used to record the justification for the change. The Worksheet shall be used to identify the inspection coverage required during the execution of Storage Tank works . Generally the following Levels of Inspection Coverage are applied. High Criticality = Inspection Level I or II Medium Criticality = Inspection Level II or III Low Criticality = Inspection Level III or IV

The Worksheet shall be signed off by the parties determining the rating, which shall be responsible for recommending the level of inspection coverage during fabrication and manufacture of the items.

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

13 of 31

Attachment : Criticality Rating (CR) Determination

Item/Equipment Title: Item/Equipment No: Criticality Element FACILITY Consequences What impact would equipment failure have on plant/unit operation? Results in long term production shutdown due to mobilization time of repair equipment or fabrication time for replacement parts Cause operational upset and/or production downtime of more than 24 hours. Moderate impact so as to inhibit full production and require emergency maintenance and control operations. Inconvenient to plant operation and result in operational difficulties without loss of process operations. 1 2 3 4 Requisition No: CR Base

Form B-1

CR Assigned

Financial Consequences What would be the likely financial consequences of equipment failure during commissioning, start-up and/or operation? Replacement or repair cost above 1M US$ Replacement or repair cost between 100k US$ to 1M US$. Replacement or repair cost between 10k US$ and 100kUS$ Replacement cost below 10k US$ Safety Factors Would failure during commissioning, start-up and/or operation jeopardize health and safety of personnel or the environment? Significant risk to personnel or environment due to or toxic or high inventory of hazardous fluid/process/temperature/ pressure/corrosiveness. Medium risk to personnel or environment due to hazardous fluid/process/temperature/ pressure/corrosiveness Moderate risk to personnel or environment due to medium hazard process or fluid. Low risk to personnel or environment due to inherently low risk of fluids or process Design Factors Are there critical or new design features which warrant special engineering or inspection follow-up? New innovative design with unproven reliability or non-code based requirements. Extrapolation of proven design with limited reliability data or previous experience. Modification of proven design with known reliability and past experience Frequently used and well-proven design with easily obtained spare parts Manufacturing Complexity Is the manufacturing complexity of the equipment such that a high level of in process verification is required? Large number of complex processes, exotic, highly specified or modified materials of construction, which require extensive testing or are not easily secured At least one complex process, special materials, etc., with limited previous experience. Large number of routine processes with common materials of construction Few routine processes with common materials of construction. A 1 2 3 4 H H M L B H M M L C M M L L D L L L L Rating Code High Criticality Component Medium Criticality Component Low Criticality Component Established Rating Print Name Prepared by JV Checked by Approved by CUSTOMER Recommended Inspection Coverage Level I Resident Full Time Level II Regular Weekly Visits Level III Random For Witness Tests Level IV No Inspection Required Signature Input/Justification for amending Criticality Rating H M L Final Rating Date A B C D A B C D 1 2 3 4 1 2 3 4

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

14 of 31

Attachment: Organizational Responsibilities


Personnel and Responsibilities:
(p) EDOPEC 's Quality Organization shall include personnel whose responsibilities, as a minimum, include the functions listed below: Quality manager, empowered by senior management with operational freedom and authority to manage Quality issues and their resolution, and to oversee the management of Quality project wide, and to issue stop Storage Tank works notices as required to correct non-conformances and or adverse Quality trends. Quality auditor to conduct formal internal and external audits on a project-wide basis throughout the applicable phases of the project execution. Quality engineer, for design, procurement, construction phases including installation and hook-up. viii. To prepare Quality procedures and plans ix. Conduct reviews prior to submittal to the CUSTOMER for approval, of technical specifications for Quality requirements x. Review RFQs, ITTs, POs, Contracts, and EDOPEC Quality submittals for compliance with CUSTOMER requirements listed in the contract

Inspection coordinator for Procurement, Construction Phases including Installation and Hook-Up: to oversee and implement the approved EDOPEC Inspection Execution Procedure for vendor supplied materials and equipment and the daily supervision of EDOPEC assigned qualified discipline inspectors, during Construction, Installation and Hook-Up activities undertaken by EDOPEC . Inspection supervision to oversee the daily inspection and testing activities associated with Construction, Installation, and Hook-Up and the daily supervision of EDOPEC assigned qualified field discipline inspectors. Adequate qualified inspection personnel by discipline to undertake vendor Inspection activities, and conduct surveillance and inspection, witness of testing during Construction, Installation and Hook-Up.

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

15 of 31

GUIDANCE ATTACHMENTS

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

16 of 31

Attachment 1-6:Control Procedures


Activity Q.1 Q.2 QA Q.3 Q.4 D.1 D.2 D.3 D.4 Design D.5 D.6 D.7 D.8 D.9 D.10 Field Procurement P.1 P.2 P.3 P.4 F.1 Fabrication, Construction, Installation, Hook-up F.2 F.3 F.4 F.5 F.6 F.7 F.8 F.9 F.10 F.11 F.12 F.13 Detect and report Non-conformances Resolve Quality Issues Conduct Quality Audits Process PO/CONTRACT Changes Provide design software/hardware Establish Design Input Develop CAD Drawings Review Technical Package intended for inclusion in RFQs and ITTs Approve Design Subcontractor and vendor Quality submittals and procedures Establish vendor Equipment Criticality Administer vendor Design Assess Design Output Process Design Changes Generate and maintain documentation and records Review of RFQs and ITTs for EDOPEC Procured items for Quality Requirements prior to issue Prepare POs and CONTRACTs, Process PO/CONTRACT Changes Approve Manufacturer and Subcontractors Quality submittals prior to submission to CUSTOMER Conduct Manufacture and vendor Oversight/Surveillance Control AFC Drawings, Prepare and Issue Shop Drawings Calibrate measuring and testing equipment, including welding equipment Control and Monitor Preheat application Evaluate production use of approved Welding Procedures Identify welds, Identify qualified welders, develop weld maps and maintain weld history records Maintain Status of Inspection activities Control timing and application of Production NDE Evaluate welder performance Conduct inspection by discipline during construction, Installation, Hook-Up Conduct Surveillance of Subcontractor and vendor activities Coordinate Mechanical COMPLETION Generate and Maintain Test and Inspection Records Compile Job Data Books Procedures Control of Non-Conformances Corrective and Preventative Actions Quality Audit Procedure Change Control Software QA Design Input Control CAD QA Technical Package Review Subcontractor Control Criticality Rating Matrix for vendor supplied materials and equipment Vendor Design Review Review and Approval Control, Design Verification Technical Review and Approval matrix for design Deliverables Change Control Document and Data Control RFQ and ITT Package Review Control of POs and CONTRACTs Approval of Quality Submittals Source Inspection Procedure Drawing Control Calibration Procedure Preheat application and Monitoring procedure WPS In-process verification Weld Mapping and Weld History Records Inspection and Test Status Requests For NDE Welder Performance Evaluation Inspection Procedures per discipline Source Inspection Procedure Mechanical COMPLETION Procedure Document Control Procedure Job Data Book Contents

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111PROJECT QUALITY REV-A.SAMPLE MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

17 of 31

Attachment: Form B-2 Typical Inspection and Test Plan Format


Page 1 of 5 DOCUMENT NO.: Stage No.
ST.1 ST.2 Verification of inspectors qualifications ST.3 ST.4 Verification of NDT technicians qualifications Verification of test house calibration certificates Verification of the equipment calibration certificates Check Plate Material records

ORIGINATOR: Description of Activity Controlling Document


Method statement Inspectors training records ASNT CP 189 Test House procedure Sub contractors procedure Mill Certificates

INSPECTION AND TEST PLAN SCOPE OF PLAN; DATE: STORAGE TANKS Acceptance Quality Inspection, Test and Witnessing Plan Criteria Record Contractor BP Third Party
Approved drawings
Equipment layout Certification Certification

Preparation of activity

Certification

ST.5

Certification

ST.6

Procurement requirements

MRR
Legend; W = Witness W x% = Witness percentage C = Check I = Inspection I x% = Inspection percentage H = Hold Point

Prepared By: Approved By:

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

18 of 31 Page 2 of 5 INSPECTION AND TEST PLAN

DOCUMENT NO.:

ORIGINATOR:

SCOPE OF PLAN; STORAGE TANKS Acceptance Criteria Quality Record

DATE: REVISION: C

Stage No.

Description of Activity

Controlling Document

Inspection, Test and Witnessing Plan Contractor BP Third Party CUSTOMER

FABRICATE AND ERECTION ST.7 ST.8 ST.9 Materials for tanks, fittings, walkways and ladders etc. Submit welders' quals. for approval. Material Takeoffs TA.Y.41 ASME IX ASME IX ASME IX ASME V specifications API 620 API 620 API 620 API 620 API 620 MRR Certificate Certificate Certificate Certificate TA.Y.60.f.0 1 I H/I H/I H/I H/I Wx%

Submit N.D.T. operators quals. for approval. ST.10 Submit weld procedure specs. for approval. ST.11 Submit N.D.T. procedures for approval. ST.12 Check datums i.e. a) level b) location orientation ST.13 Lay and weld Annular ring and Base plates to First course Vert. ST.14 Fit up and weld joints.. ST.15 NDT / Vacuum Box Floor ST.16 Visual Inspect Floor Prepared By:

API 620 API 620 API 620 API 620

Report Report Report Report Legend;

I I Wx% C I = Inspection I x% = Inspection percentage H = Hold Point

Approved By:
. Project: Document Title: Revision:
SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

W = Witness W x% = Witness percentage C = Check


Prj. Identification: Document No.:
EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

19 of 31

Page 3 of 5
DOCUMENT NO.: TPE-PLN-QAC-PTG-005-10 Stage No. ST.17 ST.18 ST.19 ST.20 ST.21 Description of Activity Submit radiographs. ORIGINATOR: TEPE

INSPECTION AND TEST PLAN SCOPE OF PLAN; STORAGE TANKS Acceptance Criteria API 620 ASME V ASME V API 620 API 620 API 620 API 620 API 620 API 620 Quality Record Report Report Report Report Report Report Report Report Report Report Legend;

DATE: 28/02/03 REVISION: C

Controlling Document API 620 API 620 API 620 API 620 procedure API 620 procedure procedure procedure

Inspection, Test and Witnessing Plan Contractor BP Third Party CUSTOMER I Wx% I W C W C C I H I = Inspection I x% = Inspection percentage H = Hold Point

Weld repairs MPI/DPT Visual surface checks Tank dimensional checks Complete all tank-welded attachments. ST.22 Perform Diesel / or DPT test on Annular ring to First Course Vertical Angle ST.23 Install all tank internals ST.24 Remove all temporary attachments. ST.25 Internal inspection prior to hydrotest. ST.26 Verify Technical Integrity Prepared By:

Approved By:

W = Witness W x% = Witness percentage C = Check

. Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

20 of 31

Page 4 of 5
DOCUMENT NO.: ORIGINATOR: TEPE

INSPECTION AND TEST PLAN SCOPE OF PLAN; STORAGE TANKS Acceptance Criteria API 620 API 620 API 620 API 620 API 620 API 620 Quality Record Certificate Report Report Report Report Report

DATE: REVISION: C

Stage No. ST.27 ST.28 ST.29 ST.30 ST.31 ST.32 ST.33 ST.34

Description of Activity Monitor quality of test medium. Hydrostatically test tank. Survey fill vertical levels and Peaking and Banding Internal inspection (post hydrotest)

Controlling Document API 620 API 620 API 620 Procedure

Inspection, Test and Witnessing Plan Contractor BP Third Party CUSTOMER I W W I C C

ST.35

Erect walkways, ladders, grating, etc. Bolt up manways. INTERNAL AND EXTERNAL COATINGS Review data sheets for suitability of coating materials for use in confined working spaces. Shot blast, prime and paint.

Procedure API 620

COSHH assessments Manufacturer Procedure API 620 Report Legend;

H Wx%

Prepared By:

Approved By:
. Project: Document Title: Revision:
SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

W = Witness W x% = Witness percentage C = Check

I = Inspection I x% = Inspection percentage H = Hold Point

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

21 of 31

Page 5 of 5
DOCUMENT NO.: Stage No. ST.36 ST.37 ST.38 ST.39 Description of Activity Apply intermediate coats. Apply final coats. Apply any special coating finishes. Clean out, Close and Contract gasket door / manway ORIGINATOR: Controlling Document Manufacturer Procedure Manufacturer Procedure Manufacturer Procedure

INSPECTION AND TEST PLAN SCOPE OF PLAN; DATE STORAGE TANKS Acceptance Quality Inspection, Test and Witnessing Plan Criteria Record Contract BP Third Party CUSTOM or ER API 620 API 620 API 620 API 620 Report Report Report Report C Wx% Wx% W

AS BUILT DRAWINGS
ST.40 ST.41 ST.42 ST.43 ST.44 Identify any non- conforming items. Raise any concession where applicable. Submit as-built drawings and documentation. Pre-commissioning Final Closure report
List of non conformances

H I I

Concession report Procedure API 620 Inspection report

Prepared By: Approved By:


. Project: Document Title: Revision:
SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Report W Mechanical API 620 W Completion report Legend; W = Witness W x% = Witness percentage C = Check

I = Inspection I x% = Inspection percentage H = Hold Point

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

22 of 31

Attachment: Form C-1 Design EDOPEC Quality Submittal Requirements (DQSR)


CONTRACT No. EDOPEC Item # QDR.1 QDR.2 QDR.3 QDR.4 Item # Title: Location: Submittals to be submitted with Bid For CUSTOMER Review ( 2 Copies required) Project Quality Plan (Typical) Project Quality Organization Chart Roles and Responsibilities (Typical) i) Audit Schedule (For Typical Project) ii) Details of No. of Audits Planned and No. conducted Listing of Control Procedures for Typical Project Post Award Submittal Topic (Submittals to be reflective of the scope of Storage Tank works ) required for Approval, required of submittals Approved for Use QUALITY PLANNING (QP) QDP.1 QDP.2 QDP.3 Project Specific Quality Plan Quality Audit Schedule ( Main EDOPEC to include Subs) Listing of EDOPEC Control Procedures applicable to Storage Tank works scope QUALITY ASSURANCE (QA) QDA.1 QDA.2 QDA.3 QDA.4 QDA.5 Control of Non-Conformances, Corrective and Preventative Actions Quality Audit Procedure ( Main EDOPEC ) CONTRACT Review Subcontractor Assessment, Selection and Control Design Control Q.6.1 Design Input Control QDA.6 Q.6.2 Design Output Control Review and Approval, inc. Matrix for Technical Review and Approval of Design Deliverables, Design Verification. Q.6.3 Change Control Q.6.3 Review of vendor Design (Main EDOPEC ) Q.6.4 Software and CAD QA QDA.7 QDA.8 QDA.9 QDA.10 QDA.11 QDA.12 QDA.13 QDA.14 QDA.15 QDA.16 QDA.17 Document and Data Control Review and Approval of Subcontractor Quality Submittals Interface Management Information Management Weight Control/Verification Criticality Rating Matrix for Procured Material and Equipment Review of Technical Package for Inclusion in ITT/IFB/RFQ s Required Yes No Page # Date

23 of 31
Attachment 5-8:Form D-1 Page 1 Procurement Quality Title Submittal Requirements (VQSR) PO # Vendor and Location: Criticality High Medium Low Item # Submittals to be submitted with Bid For CUSTOMER Review (2 Copies required) QVR.1 QVR.2 QVR.3 QVR.4 Item # Project Quality Plan (Typical ) Project Quality Organization Chart Roles and Responsibilities (Typical) i) Audit Schedule (for Typical Project) ii) Details of No. of Audits Planned and No. Conducted Listing of Control Procedures for Typical Project Post Award Submittal Topic to be reflective of the scope of Storage Tank works required for Approval, required of submittals Approved for Use QUALITY PLANNING QVP.1 QVP.2 Project Specific Quality Plan Inspection and Test Plans per Discipline QVP.2.1 Piping QVP.2.2 Structural and Equipment QVP.2.3 Equipment QVP.2.4 Electrical and Instrumentation QVP.2.5 HVAC QVP.2.6 Outfitting QVP.3 QVP.4 QVA.1 QVA.2 QVA.3 QVA.4 QVA.5 QVA.6 QVA 7 Quality Audit Schedule Listing of EDOPEC Control Procedures applicable to Storage Tank works scope QUALITY ASSURANCE Control of Non-Conformances, Corrective and Preventative Actions Quality Audit Procedure Document and Data Control Sub-vendor / Subcontractor Assessment, Selection and Control Review and Approval of sub-vendor/Subcontractor Quality submittals Vendor Inspection Procedure(Source Inspection) FABRICATION VF.1 VF.2 VF.3 VF.4 VF.5 VF.6 VF.7 VF.8 VF.9 VF.10 VF.11 VF.12 VF.13 Material Control Receipt, Storage, Segregation, Issue Material Traceability Positive Material Identification Weight Control and Verification Calibration of measuring and testing equipment, including welding machines Welding Procedure Specifications and Supporting Qualification Records NDE Procedure s NDE Technician Certification Welder/Operator Qualification Procedure and Records In-process Verification of WPS s Welder Performance Evaluation Weld Consumable Control Weld Mapping and Weld History Records

Page 1 of 2 Date

Required Yes No

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

24 of 31

Attachment 5-8: Form D-1 Page 2


PO # Title: Post Award Submittal Topic (Submittals to be reflective of the scope of Storage Tank works ) required for Approval, required of submittals Approved for Use FABRICATION Continued VF.14 VF.15 VF.16 VF.17 PWHT Procedure Dimensional Control Procedure Surface Treatment and Painting Procedure Inspection Procedures VF.17.1 Piping VF.17.2 Structural VF.17.3 Equipment VF.17.4 Electrical and Instrumentation VF.17.5 Surface Treatment and Painting VF.17.6 HVAC VF.17.7 Outfitting VF.18 VF.19 VF.21 VF.22 Pressure Testing Final Inspection and Release Notification Job Data Book Contents and Compilation Preparation, Review and Approval of As-Built Drawings Page 1 of 2 Required YES NO

Item #

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

25 of 31

Attachment 5-8: Form E-1 Page 1 Construction/Installation/Hook-Up Quality Submittal Requirements (CQSR)
CONTRACT # EDOPEC Item # QCR.1 QCR.2 QCR.3 QCR.4 Item # Project Quality Plan (Typical ) Project Quality Organization Chart Roles and Responsibilities (Typical) i) Audit Schedule (for Typical Project) ii) Details of No. of Audits Planned and No. conducted Listing of Control Procedures for Typical Project Post Award Submittal Topic (Submittals to be reflective of the scope of Storage Tank works ) required for Approval, required of submittals Approved for Use QUALITY PLANNING Project Specific Quality Plan Inspection and Test Plans per Discipline QCP.2.1 Piping QCP.2.2 Structural QCP.2.3 Electrical and Instrumentation QCP.2.4 HVAC QCP.2.5 Outfitting QCP.3 QCP.4 QCA.1 QCA.2 QCA.3 QCA.4 QCA.5 QCA.6 CP.1 Quality Audit Schedule Listing of EDOPEC Control Procedures applicable to Storage Tank works scope QUALITY ASSURANCE Control of Non-Conformances, Corrective and Preventative Actions Quality Audit Procedure Document and Data Control Subcontractor Assessment, Selection and Control Review and Approval of Subcontractor Quality submittals EDOPEC PROCUREMENT Procurement CP.1.1 RFQ and ITT Package Review CP.1.2 Selection of Qualified Bidders CP.1.3 Control of POs and CONTRACTs CP.1.4 Review and Approval of Manufacturer and vendor Quality Submittals CP.1.5 Source Inspection Procedure CONSTRUCTION/INSTALLATION/HOOK-UP CF.1 CF.2 CF.3 CF.4 CF.5 CF.6 CF.7 Material Control Receipt, Storage, Segregation, Issue Material Traceability Positive Material Identification Weight Control Verification Calibration of measuring and testing equipment, including welding machines Welding Procedure Specifications and Supporting Qualification Records NDE Procedure s Title: Location: Submittals to be submitted with Bid For CUSTOMER Review ( 2 Copies required) Page 1 of 2 Date

Required Yes No

QCP.1 QCP.2

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

26 of 31 Attachment 5-8: Form E-1 Page 2


CONTRACT # EDOPEC CF.8 CF.9 CF.10 CF.11 CF.12 CF.13 CF.14 CF.15 CF.16 CF.17 CF.18 NDE Technician Certification Requests for NDE Welder/Operator Qualification Procedure and Records In-process Verification of WPSs Welder Performance Evaluation Preheat Application and Monitoring Procedure Weld Consumable Control Drawing Control Weld Mapping and Weld History Record Procedure Inspection and Test Status Mechanical COMPLETION Procedure Inspection Procedures CF.19.1 Piping CF.19 CF.19.2 Structural CF.19.3 Electrical and Instrumentation CF.19.4 HVAC CF.19.5 Surface Treatment and Painting CF.20 CF.21 Data Book Contents and Compilation Preparation, Review and Approval of As-Built Drawings Title: Location: Page 2 of 2 Date

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

27 of 31

Attachment 5-9: Levels of Vendor Surveillance and Site Inspection


Note: The Actual Criticality Ratings will be developed during CONTRACT execution in accordance with Attachment 5-3 and implemented in accordance with the associated Inspection and Test Plan (Ref: Attachment 5-7 for typical format)

Levels of Vendor or Site Surveillance


(q) (r) A simplified system of coding the level of planned purchaser and EDOPEC inspection coverage shall be utilized for ease and clarity and defining requirements. Key factors such as complexity, special materials, unusual processes, safety, operational reliability quality history of supplier and EDOPEC, ease of replacement. Site location and delivery schedule should be considered with setting the required inspection level, in conjunction with the quality of the inspection and testing service by the vendor and EDOPEC. Use the following four (4) levels of inspection coverage: Level 4 Level 3 No inspection required or final inspection only, prior to shipment or at installation. Includes as a minimum, inspection meetings, one or more unspecified, "in-progress" surveillance type visits, or observations, all witness and hold points, final inspection and release for shipment or final ACCEPTANCE. Same as Level 3 above except that "in-progress" surveillance inspections shall be on a regular basis (weekly, monthly, etc.) Resident inspector continuously monitor Storage Tank works.

(s)

Level 2 Level 1

Refer to the following notes for clarifications:


Notes: Possible surveillance increase for fabrication of castings, forgings, NDT and welding on rotating equipment in hydrogen sulfide or carbon dioxide service. Possible surveillance increase for material procurement, fabrication, NDT, welding, stress relief, and mechanical testing of materials exposed to critical service, including cryogenic service. Possible surveillance increase for fire protection control systems. This requirement is for GE Frame 5 or larger gas turbines. Requirements may possibly be reduced for smaller units.

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

28 of 31

Criticality Level Preliminary Rating

Area

Numeric Level EDOPEC Proposes

1.0 CIVIL/STRUCTURAL 1.1 Structural Steel High High High High High 2.0 ROTATING EQUIPMENT 2.1 Installation Medium 3.0 VESSELS 3.1 Tank Construction High High High High High Medium Medium 5.0 PIPING AND PIPELINES 5.1 Piping Procurement Medium Medium 5.1.a 5.1.b 5.1.c Low Medium Low Low Medium 5.2 Pipelines Procurement Medium 5.2.a Steel making (pipeline) 5.1.d 5.1.e 5.1.f 1 2 Carbon Steel Piping Stainless and Alloy Piping Fittings, Flanges and Other Apparatus Carbon Steel Stainless and Alloy Bulk Items, i.e., Bolts, Gaskets Valves (build) Valves (engineered) 3.2.a 3.2.b 3.2.c 3.2.d 3.2.e 3.2.f 3.2.g Grading Foundation Tank Erection Painting Hydro Test Bund Walls/Approaches Tank Area Drains 2.2.a In place storage and preventive maintenance 1.6.a 1.6.b 1.6.c 1.6.d 1.6.e Welders qualification tests Welding procedure qualifications prior to any welding Shop Fabrication Application of any coating Field Erection

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

29 of 31
Criticality Level Preliminary Rating Area

Numeric Level EDOPEC Proposes

High High

5.2.b 5.2.c 5.2.d

Pipe-line (pipelines, flowlines, induction bends and risers) Induction bending Coating and wrapping 1 2 3 4 Pipelines and flowlines (FBE) Pipelines and flowlines (Concrete) Induction Bends (FBE) Risers (Polychloreprene) Anodes Subset valves 1 2 Castings Ball Valves

High High High High High 5.2.e 5.2.f High High 5.3 Piping Fabrication/Installation 5.3.a High High High High High High High High High 5.3.b High High High High High High 5.4 Pipelines Installation High 5.4.a

Fabrication 1 2 3 4 5 6 7 8 9 Receiving, inspection and storage Layout cutting, preparation of pipe and fittings Welding procedures Welding operations PWHT Visual and NDT Dimensional Verification Cleaning, Painting and Preservation Coating and Wrapping Installation Installation 1 2 3 4 5 6 Erection spools, etc. Restraints, supports, anchorages, and guides properly installed Hydrostatic/pneumatic testing Flushing and cleaning Painting and permanent markings Final Documentation

Transportation, receiving, inspection and storage

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

30 of 31
Criticality Level Preliminary Rating High High High High High High High High High High High 6.0 ELECTRICAL 6.1 Installation High Medium Medium High 7.0 INSTRUMENTATION 7.1 Procurement 7.1.a Medium Medium Medium 7.2 Installation High High High High 8.0 SPECIAL EQUIPMENT Medium 8.1 Package units, i.e., hydraulic control systems, driers, etc. 7.3.a 7.3.b 7.3.c 7.3.d General, i.e., proper layout correct scale range, nameplates, tagging of wire terminals, spare terminals, etc. Instrument calibrations Pressure tests Foundation testing of instrumentation loop 1 2 3 Panels Main Process Oil movement, remote tank gauging Water and waste water treatment 6.2.a 6.2.b 6.2.c 6.2.d Threaded conduit and cable trays Cable pulling Terminators Testing of circuits/cables verifies corrections/completeness Area

Numeric Level EDOPEC Proposes

5.4.b 5.4.c 5.4.d 5.4.e 5.4.f 5.4.g 5.4.h 5.4.i 5.4.j 5.4.k 5.4.l

Restraints and supports Preparation of pipe and fittings Welding procedure qualification and testing Welder testing Welding operations Visual and NDT Field joint coating (FBE and Polyurethane infill) Cleaning Leak and hydro testing Painting Final Documentation

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013

31 of 31
Criticality Level Preliminary Rating High Medium High High 9.0 LOSS PREVENTION 9.1 Not Used High 10.0 INSULATION Thermal and Acoustical (In Field) Area

Numeric Level EDOPEC Proposes

8.2 8.3 8.4 8.5

Internal erosion resistant linings Equipment designed and fabricated to fit a specific service, or involving Owner know-how and technology; i.e., quick-opening closure, special fire fighting equipment and fire suppression systems Fabrication of Single Point Pedestal Crane

11.0 BUILDINGS/QUARTERS 11.1 Construction

Project: Document Title: Revision:


SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK

Prj. Identification: Document No.:


EDO-PLN-QAC-GNR-INT-XXX-013-110-111REV-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANKB

Date:11.11.2013