: PWA-RPD-CON-FM-1505
Inspection Notification Request Revision No. : 08
Issue Date : 29 Apr. 2020
Details Info
QS049-P04-ASH-GEN-GEN-IR-
INR No: Rev. No: 0
28626
Project Title: Roads & Infrastructure in South of Al Meshaf- Package 04
Project No: IA 2018 C 039 G Date: 7-Jun-23
Contractor: Al Sarh Trading & Contracting Co. GEC: Dorsch, Qatar
Part 1 - To be completed by Contractor
To the GEC: The work detailed below is ready for inspection. We request your attendance to inspect the works
QS049-P04-ASH-CON-MST-
QS049-P04-ASH-CON-ITP-A10881 R6 4.1.2.1
A10881 R6
Description of the Work to be Inspection for Level of Existing Ground - including surface preparation +FDT (bottom
Inspected: of Roadbase)
Name/ Position(s): Engr. Ashraf Mohsen | Project Director Signature / Date: 7-Jun-23
Works Inspector
Comments
Land Surveyor
Safety Inspector
Material Engineer
Site Engineer
Supervision Consultant Response: ☐Approved ☐Approved with Comment ☐Rejected ☐Cancelled
Approval of the works will not release the contractor of its obligations and liabilities under the contract
Mohammed
Name: Zahid Masood Signature
Shelaby
RE -
Position(s): RE - Roads Date:
Drainage/Utilities
(GEC Receipt of INR – Stamp, Date & Sign) (Contractor Receipt of INR – Stamp, Date & Sign)
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 19/04/2020 11:07 Page 1 of 1
QS049-P04- Road an Infrastructure in South of Al Meshaf Package 04 Project
Client: Consultant: Contractor:
CHECKLIST
CHECKLIST- FOR EARTHWORKS (Cutting, Filling & Subgrade Works)
FILLING- Pegging/ marking & Indentify Filling area (also pegs with plastic flags indicating depth of
Survey record
filling required)
ROCK CUTTING- Pegging/ marking & Indentify Rock cutting/ excavation area (also pegs with plastic
Survey record
flags indicating depth of cutting required)
3.0 Soil Sampling (to Check Existing Ground Suitability before Start Filling works)
4.0 Check Existing Ground Preparation before Start Filling Works (Level + FDT test)
The above activities are found to be as per contract requirements and are ready for Checking. The above activities are correct and released for the next activity
A A
-A
-A
H
H
C
AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM's express written consent.
C
T
T
A
A
M
M
C C
E
subjected -QS049-P04-Parking E
width dated-21/05/2022
This drawing has been prepared for the use of AECOM's client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law.
Design Consultant :
4th floor, Jaidah Square,
Al Matar Street,
Umm Ghuwalina
PO Box 6650 Doha, Qatar
Tel: +974 44079000
Fax: +974 44376782
Supervision Consultant :
Dorsch Qatar LLC
Al Salam Tower,
F F
Sheraton Roundabout
P.O.Box: 23593, Doha-Qatar
Phone: +974-4-480 2097
Fax: +974-4-480 2128
Main Contractor :
AL SARH TRADING &
CONTRACTING CO .W.L.L
P.O. BOX NO.1350 DOHA, QATAR
TEL NO. 44621886 / 44622053, FAX: 44620730
EMAIL: info@alsarh-holding.com
Project Name:
ROAD AND INFRASTRUCTURE IN
G
SOUTH OF AL MESHAF G
PACKAGE 04
SHOP DRAWING
Drawing Title:
PROPOSED ROAD
X
LAYOUT
ROAD A-C03
(ZONE- 4 & 5)
H Drawn:
KP
Approved:
OS H
Checked: Scale:
KA N.T.S.
25/7/2022 Date:
23 July 2022
Sheet Number:
1/1
Drawing Number: Revision:
QS049-P04-ASH-HW-1027 3
1 2 3 4 5 6 7 8 9 10 11 12
√
28/03/2021