You are on page 1of 6

Document No.

: PWA-RPD-CON-FM-1505
Inspection Notification Request Revision No. : 08
Issue Date : 29 Apr. 2020

Details Info
QS049-P04-ASH-GEN-GEN-IR-
INR No: Rev. No: 0
28626
Project Title: Roads & Infrastructure in South of Al Meshaf- Package 04
Project No: IA 2018 C 039 G Date: 7-Jun-23
Contractor: Al Sarh Trading & Contracting Co. GEC: Dorsch, Qatar
Part 1 - To be completed by Contractor

Inspection Date : 8-Jun-23 Time: 7:10AM Previous INR No.

To the GEC: The work detailed below is ready for inspection. We request your attendance to inspect the works

Discipline Roads Drainage Utilities Structure Landscaping Survey Material Others


Pre-checks for H&S, Existing
☐ H&S (signed checklist by Contractor attached) ☐ Overhead Permit (No… )
Overhead Services &
Underground Utilities ☐ Excavation to Expose ☐ Permit to Dig (No………..) ☐ Trail Pit ☐Scanning ☐N/A
Method Statement No. ITP No. & Inspection/Test Item BoQ Ref. Material Inspection Ref.

QS049-P04-ASH-CON-MST-
QS049-P04-ASH-CON-ITP-A10881 R6 4.1.2.1
A10881 R6

Drawing No(s): QS049-P04-ASH-HW-1027

Location of the work to be inspected: ZONE 1 ROAD A- T47


Ch.0+000 Ch.0+010
Carriageway

Description of the Work to be Inspection for Level of Existing Ground - including surface preparation +FDT (bottom
Inspected: of Roadbase)

Name/ Position(s): Engr. Ashraf Mohsen | Project Director Signature / Date: 7-Jun-23

Part 2 - To be completed by GEC (to be assigned by GEC RE/SRE)


Position(s): Comments: Name / Date / Signature
Supervision Consultant

Works Inspector
Comments

Land Surveyor

Safety Inspector

Material Engineer
Site Engineer
Supervision Consultant Response: ☐Approved ☐Approved with Comment ☐Rejected ☐Cancelled
Approval of the works will not release the contractor of its obligations and liabilities under the contract
Mohammed
Name: Zahid Masood Signature
Shelaby
RE -
Position(s): RE - Roads Date:
Drainage/Utilities

Name: Ioannis Kartsios Signature

Position(s): Senior Resident Engineer Date:


SRE / RE Comments

Received by Supervision Consultant Returned to Contractor

(GEC Receipt of INR – Stamp, Date & Sign) (Contractor Receipt of INR – Stamp, Date & Sign)

THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 19/04/2020 11:07 Page 1 of 1
QS049-P04- Road an Infrastructure in South of Al Meshaf Package 04 Project
Client: Consultant: Contractor:

CHECKLIST
CHECKLIST- FOR EARTHWORKS (Cutting, Filling & Subgrade Works)

Checklist Ref. INR No. : QS049-P04-ASH-GEN-GEN-IR-28626


Drawing Ref. No. : QS049-P04-ASH-HW-1027
Date of Inspection : 8-Jun-23

S/N Checklist Items Yes No N/A Remarks / Comments


1.0 Setting-out Line & Level to Start Excavation for Normal Cutting. (pegging center and edges of roads at
every 20m interval to identify as follows);
NORMAL CUTTING- Pegging/ marking & Indentify normal cutting/ excavation area (also pegs with
Survey record
plastic flags indicating depth of cutting required)

FILLING- Pegging/ marking & Indentify Filling area (also pegs with plastic flags indicating depth of
Survey record
filling required)

2.0 Check Line & Level to Start Rock Excavation

ROCK CUTTING- Pegging/ marking & Indentify Rock cutting/ excavation area (also pegs with plastic
Survey record
flags indicating depth of cutting required)

Rock Sampling (as requested by GEC)

Third party laboratory to take the sample witnessed by GEC


Test reports
TPL to provide the Test reports (at random); ( Crushing strength of not less than 7 N/mm2 when dry
and not less than 4 N/nn2 after submergence in water for 24 hours.

3.0 Soil Sampling (to Check Existing Ground Suitability before Start Filling works)

GEC to choose location where sample will be taken


Survey to peg choosen location and provide coordinates and levels Survey record

Third party laboratory to take the sample witnessed by GEC


Test reports
TPL to provide the Test reports (Per 2000m2) ; Liquid Limit (30% maximum), Plasticity Index (10%
maximum), California Bearing Ratio (CBR) (15% minimum at 95% MDD), Swelling (2% maximum)

4.0 Check Existing Ground Preparation before Start Filling Works (Level + FDT test)

Survey to provide Survey record Survey record


Third party laboratory to conduct FDT Test witnessed by GEC (1 test per 200m2); Field Density Test Test reports
(Min. 95% of MDD)

5.0 Filling/ Subgrade Works, _____ Layer (Level + FDT test)

Survey to provide Survey record Survey record


Third party laboratory to conduct FDT Test witnessed by GEC (1 test per 200m2); Field Density Test Test reports
(Min. 95% of MDD)

The above activities are found to be as per contract requirements and are ready for Checking. The above activities are correct and released for the next activity

Checked by: Verified by (DORSCH Engineer):

a. Main Contractor Site Engineer b. Main Contractor QA/QC Engineer/ Inspector

Sufian ARSHAD ________________________________


Name & Signature Name & Signature Name & Signature

7-Jun-23 7-Jun-23 ________________________________


Date Date Date
All measurements must be obtained from the stated dimensions.
1 2 3 4 5 6 7 8 9 10 11 12
N

A A

-A
-A

Do not scale this document.


LINE A
LINE A
KEY PLAN
NOTES & LEGEND:
B B

H
H
C

AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM's express written consent.
C
T
T
A
A
M
M
C C

REFERENCE DRAWING REV.


QS049-P00-AEC-HW-1040 & 1046 (LAYOUT) CD
QS049-P00-AEC-HW-1047 (LAYOUT) CB
QS049-P00-AEC-HW-1052 (LAYOUT) CC
D QS049-P04-DGQ-ASH-LET-815-(Letter) D

3 23-Jul-22 ISSUED FOR APPROVAL KP KA OS

LAYOUT LEGEND: 2 31-Jan-22 ISSUED FOR APPROVAL KP AR AR


1 12-Apr-21 ISSUED FOR APPROVAL KP AR AH
0 1-Mar-20 ISSUED FOR APPROVAL KP KI HK
Rev.
Date Revision Details Drawn Chkd. Appd.

Revision based on the letter Client :

E
subjected -QS049-P04-Parking E

width dated-21/05/2022

This drawing has been prepared for the use of AECOM's client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law.
Design Consultant :
4th floor, Jaidah Square,
Al Matar Street,
Umm Ghuwalina
PO Box 6650 Doha, Qatar
Tel: +974 44079000
Fax: +974 44376782
Supervision Consultant :
Dorsch Qatar LLC
Al Salam Tower,
F F
Sheraton Roundabout
P.O.Box: 23593, Doha-Qatar
Phone: +974-4-480 2097
Fax: +974-4-480 2128
Main Contractor :
AL SARH TRADING &
CONTRACTING CO .W.L.L
P.O. BOX NO.1350 DOHA, QATAR
TEL NO. 44621886 / 44622053, FAX: 44620730
EMAIL: info@alsarh-holding.com

Project Name:
ROAD AND INFRASTRUCTURE IN
G
SOUTH OF AL MESHAF G
PACKAGE 04

MATCH LINE B-B


MATCH LINE B-B
Project Code:
IA/2018/C/039/G
Type:
MATCH LINE A-A
MATCH LINE A-A

SHOP DRAWING
Drawing Title:

PROPOSED ROAD
X
LAYOUT
ROAD A-C03
(ZONE- 4 & 5)
H Drawn:
KP
Approved:
OS H

Checked: Scale:
KA N.T.S.

25/7/2022 Date:
23 July 2022
Sheet Number:
1/1
Drawing Number: Revision:

QS049-P04-ASH-HW-1027 3
1 2 3 4 5 6 7 8 9 10 11 12

28/03/2021