COMILOG 2020 GREENFIELDS PROJECT


EARTHWORKS BENEFICIATION AND RAILWAY STATION STOCKYARD
CONTRACT N° : H359304-CC002

Date of request
13 / 08 / 2020
st nd
Element controlled : After Compaction Subgrade, 1 and 2 Layer Backfill Pisolite
PK173-178 SAR
Request N° : RRT_0130
Material :

Type of work : Earthworks - Compaction

Controlled area : South Road PK173 - 178


.

Attachments : External reception request :


C2020-SAR-PE-PI-002 Done on : SAR
Made by :
Received by : Date:
Response requested for :
To :
Elements of assessment :
 Results of laboratory tests
 Visual recognition
 Topographic survey
 Other
The Engineer’s observations :

VISAS FOR RECEPTION


Contractor’s Representative The Engineer’s Topographer The Engineer’s Lab The Engineer
Test Zone

Compaction Monitoring table


South Road Layers Index Compactness (%) in situ Requirement (%) Remarks
PK176 Subgrade P01 97.8 ≥95 Conform
PK178 Subgrade P02 96.6 ≥95 Conform
PK173 1st P01 95.0 ≥95 Conform
PK178 1st P02 96.3 ≥95 Conform
PK173 2nd P01 96.4 ≥95 Conform
PK178 2nd P02 96.3 ≥95 Conform