Project Title : EMILY 1 PROJECT FUEL TERMINAL & JETTY Date : May 10, 2020
Job No : 9750 Dicipline : Civil
Client : INTERPORT Witnessed by : Rafael

Noted : Instalation of Brick Wall & Finishing


Guard House at Loading Exit
PHOTOGRAPH

QUALITY CONTROL

Project Title : EMILY 1 PROJECT FUEL TERMINAL & JETTY Date : May 10, 2020
Job No : 9750 Dicipline : Civil
Client : INTERPORT Witnessed by : Rafael

Noted : Instalation of Brick Wall


Guard House Loading Truck Exit
Doc. no. PTD-GEN-TPT9750-BPN-3020-FORM
EMILY-1 PROJECT FUEL TERMINAL AND JETTY Rev. A
Date
BRICK INSPECTION REPORT Page. of
Project Title : Emily -1 Project Fuel Terminal & Jetty
Job No : 9750
Client : INTERPORT Date : 5/10/2020
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-BIR-BCI-0007
Sub-Contractor : PT. Bahana Cipta Internusa Page : of

Drawing No. : 9750-CVL-DWG-0221 Equipment / Location : Guard House at Loading


Revision : B Truck Exit
Sheet : ALL Pages

Result Approval Acknowledged


Item of Inspection Remarks
Accepted Rejected BCI TPEC INTERPORT

BRICK WORK

Location, wall centre, vertical board

Location of door and windows

Proportioning and Mixing Mortar

Reinforcement and installation of accessories (Horizontal


Dowels, Veltical Dowels, etc)

Installation of Column Practice

Finish of surface

COMMENT

Prepared by, Witnessed/Reviewed by, Acknowledged by,


Bahana Cipta Internusa TRIPATRA Engineers & Constructors INTERPORT

M Saoki
QC Inspector Date Date Date

Doc. ref. FORM-WI-COR-QA-009-001-029 rev.0


Doc. no. PTD-GEN-TPT9750-BPN-3023-FORM
EMILY-1 PROJECT FUEL TERMINAL AND JETTY Rev. A
Date
WALL, CEILING AND FLOOR INSPECTION REPORT Page. of
Project Title : Emily -1 Project Fuel Terminal & Jetty
Job No : 9750
Client : INTERPORT Date : 5/10/2020
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-WCFR-BCI-0006
Sub-Contractor : PT. Bahana Cipta Internusa Page : of

Drawing No. : 9750-CVL-DWG-0221 Equipment / Location : Guard House at Loading


Revision : B Truck Exit
Sheet : ALL PAGES

Result Approval Acknowledged


Item of Inspection Remarks
Accepted Rejected BCI TPEC INTERPORT

I. WALL FINISHING (Brick, Concrete, Gypsum or Partition)

Surface

Flatness

Painting or Wall Paper

Condition of Joint

Condition of Cleaning

II. CEILING (Acoustic Board or Gypsum Board)

Setting Frame

Layout and Pattern

Condition of Joint

Painting

Condition Cleaning and Protection

III. FLOOR WORK

Pattern and Layout of Installation

Surface

Flatness

Treatment of Joint

Cleaning and Waxing

COMMENT

Prepared by, Witnessed/Reviewed by, Acknowledged by,


Bahana Cipta Internusa TRIPATRA Engineers & Constructors INTERPORT

M Saoki
QC Inspector Date Date Date

Doc. ref. FORM-WI-COR-QA-009-001-032 rev.0