NCR No.: 9750-NCR-QUA-00028 Issued Date: 07 January 2020


NCR Category Critical Major Minor

Project Code: 9750 Project Title: EMILY 1 PROJECT


Client: INTERPORT Location: BALIKPAPAN
Issued by: QA/QC Issued to: BCI
Design Engineering Transportation & Installation
Event Location
Shop / Fabrication Site Construction
FEED Internal (Contractor)
Detail Engineering Client
Activity
Vendor/ Factory Acceptance Test Pre Com/Com
Subcontractor Site Acceptance Test
Non-Conforming Item / Process: (Part-A)
- Missing the Anchor Box on Pedestal Pump station 2 (after pouring concrete)
- Mistake the tittle/subject of RFI

Non-Conformity Found:
There is no anchor box on pump station 02 after pouring concrete due to the box has been buried by concrete.
The level top of concrete was not complying with doc no. FCN 9750-CVL-FCN-0033. Detail see the below picture.
Also, there is mistake of the subject inspection between actual inspection and notification (RFI no. 9750 – QC –
RFI – BCI – 00224).

Picture of Evidence

All printed copies are considered uncontrolled and the validity of this document shall be verified via QS Portal before use.
Doc. no. FORM-WI-COR-QA-024-001

CORFORM Rev. 0

NON-CONFORMITY REPORT Date 11th Sept 19

Page. 2 of 6

All printed copies are considered uncontrolled and the validity of this document shall be verified via QS Portal before use.
Doc. no. FORM-WI-COR-QA-024-001

CORFORM Rev. 0

NON-CONFORMITY REPORT Date 11th Sept 19

Page. 3 of 6

All printed copies are considered uncontrolled and the validity of this document shall be verified via QS Portal before use.
Doc. no. FORM-WI-COR-QA-024-001

CORFORM Rev. 0

NON-CONFORMITY REPORT Date 11th Sept 19

Page. 4 of 6

NC Issuer : Rafael Signature: RMI Date : 07 Jan 2020 Target Close Date : 15 Jan 2020

All printed copies are considered uncontrolled and the validity of this document shall be verified via QS Portal before use.
Doc. no. FORM-WI-COR-QA-024-001

CORFORM Rev. 0

NON-CONFORMITY REPORT Date 11th Sept 19

Page. 5 of 6

Root Cause :

Proposed Correction (Part-B)

Rework and Re-inspect

Acceptable as is
Degrade (Alternate use)
Rejected

Corrective Action (Part-C)

Remarks.
CA Proposed by Signature Date

CA Approved by Signature Date

Verification Of Corrective Action / Correction (Part-D)


 ACCEPTED  REJECTED

Remarks :

Verified By : Name : Signature Date

All printed copies are considered uncontrolled and the validity of this document shall be verified via QS Portal before use.
Doc. no. FORM-WI-COR-QA-024-001

CORFORM Rev. 0

NON-CONFORMITY REPORT Date 11th Sept 19

Page. 6 of 6

Close-Out (Part-E)
TPEC QA/QC Name Signature Date

All printed copies are considered uncontrolled and the validity of this document shall be verified via QS Portal before use.