INSPECTION DAILY REPORT

Project: GPP-PIPELINE-5000 Project No.: 3800-5000


Location: NB site Report No.: F&C0940-0964- -15
Inspector: Nashaat Date: 26 3, 2023
Contractor/Sub: CPECC/NB

1 . General inspection status ( see the attached )

2.
2.1 Documents and drawing status

Documents type Total receive Approved Pending


Pipeline 39 32 `7
Material 2 2 0
Tel 20 4 16
Corrosion 16 14 2
PIP 2 2 0

2.2 critical Drawing and documents need urgent approve

No DWG . No Code

1
INSPECTION DAILY REPORT

Project: GPP-PIPELINE-5000 Project No.: 3800-5000


Location: NB site Report No.: F&C0940-0964- -15
Inspector: Nashaat Date: 26 3, 2023
Contractor/Sub: CPECC/NB

3. Inspection Activities (RFI If applicable)

No RFI No. closed Status Description


1.
2

No Total RFI open Ref. file


1. 2

4. Issues Identified During Today Surveillance

Item Description of the Issue Sub – action


1
2
3

5. Pending Issues followed up

Item Description of the Issue Open Date Status


1

2
INSPECTION DAILY REPORT

Project: GPP-PIPELINE-5000 Project No.: 3800-5000


Location: NB site Report No.: F&C0940-0964- -15
Inspector: Nashaat Date: 26 3, 2023
Contractor/Sub: CPECC/NB

Not qualification welder make tack weld


6 .Site progress

HDD activity
Line Status Remark
10 Condensate Done between j 350 and j360
4Fuel Gas Done between j 350 and j361
12 Fuel Gas Done between j 350 and j362
24Dry Gas Done between j 350 and j363
24Raw Gas Done between j 350 and j364
FOC cable Done between j 350 and j365
8 Condensate Done between j 350 and j365

3
INSPECTION DAILY REPORT

Project: GPP-PIPELINE-5000 Project No.: 3800-5000


Location: NB site Report No.: F&C0940-0964- -15
Inspector: Nashaat Date: 26 3, 2023
Contractor/Sub: CPECC/NB

1.PEG . wetness WQT for ss for 4 welder


2 No other activity for subcontractors ( rains )
3
4
5

7. Photos and Attached Documents


4
INSPECTION DAILY REPORT

Project: GPP-PIPELINE-5000 Project No.: 3800-5000


Location: NB site Report No.: F&C0940-0964- -15
Inspector: Nashaat Date: 26 3, 2023
Contractor/Sub: CPECC/NB

5
INSPECTION DAILY REPORT

Project: GPP-PIPELINE-5000 Project No.: 3800-5000


Location: NB site Report No.: F&C0940-0964- -15
Inspector: Nashaat Date: 26 3, 2023
Contractor/Sub: CPECC/NB

PEG , wetness WQT

(End of
Report)