You are on page 1of 15

EPC

CCOM FOR GA
AS PRO
OCESSIN
NG PLA
ANT

DET
TAIL DESIG
GN  DOC
C. NO.: HFY
Y‐3800‐00000‐CIV‐IT
TP‐0009  REV
V.: C  PA
AGE 1 OF 15

HFY--CON/
/F&C0
0940-0
0964

CO
ONCRE
ETE

C ISSU
UED FOR APP
PROVAL 26.01.202
20 Jiangsuyang Fang
gyusong Faangyusong Changchuan
ntao

B ISSU
UED FOR APP
PROVAL 05.01.202
20 Jiangsuyang Fang
gyusong Faangyusong Changchuan
ntao

A ISSU
UED FOR APP
PROVAL 19.12.20 19 Jiangsuyang Fang
gyusong Faangyusong Changchuan
ntao

REV
V. DESCRIPTIION DATE PREP
P’D CH
HK’D REV’D APP’D


   
 
 
C
CONCREETE   
 
 

PAGE 2 OF
O
DETA
AIL DESIG
GN D
DOC. NO.: HFY-3800--0000-CIV-ITP-0009 REV
V.: C
15
 
REVISION 
R DESCRIPT
TION SHEE
ET 
Rev.  Page  Parra. Reason for
R r Revision

C  12  1 Updated t
U the contennt with co
ommence
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     

Hold No
o.  Page  Parra. Reason ffor Hold 
     
     
     
     
     
     
     
     
 
   
 
 
C
CONCREETE   
 
 

PAGE 3 OF
O
DETA
AIL DESIG
GN D
DOC. NO.: HFY-3800--0000-CIV-ITP-0009 REV
V.: C
15
 

CONTENT
T

oncrete Wo
1.0 Co ork ............................... .................................................................................. 1

APPEENDICES
HFY--Checklist-3-2-1 Inspection
n checklist formwork &reinforcin
ng steel ………..
… 8
HFY--Checklist-3-2-2 n checklist concrete pouring
Inspection p …
……………… ………..9
HFY--Checklist-3-2-3 Inspection
n checklist anchor bo
olt& embeddded items ……11
CL-C
C-01 Checklist of foundation coating
g…… ……… ……...……… …..…12
PR
ROVISION O
OF ENGINEE
ERING, PROC
CUREMENTT, CONSTRU
UCTION,
COMMISSIONINNG, OPERAT
TION AND MAINTENAN
M CE SERVICEE FOR GAS

C
CPECC PROVIS
SION OF EN
NGINEERING
G, PROCUREEMENT, CO
ONSTRUCTIOON, COMMIISSIONING,
O
OPERATION AND MAINT
TENANCE SERVICE
S FO OCESSING PLANT
OR GAS PRO
DISC
CIPLINE:CIVIL DESCRIPTION OF WORK : CON
NCRETE WORK SITE
E INSPECTION & TEST PLAN HFY-3800-000
00-CIV-ITP-000
09

COM
MMENTS DEFINITION OF
F INSPECTION A
AND TEST PLAN S
SYMBOLS APPLICABLE TO ALL SIGNATORIES
S

S-CON = Sub b-Contractor


CPECC = Chin na Petroleum En
ngineering Consstruction
nagement Consultant
Corporation PMC: Project Man

“H” - HOLD: A point beyond which w


work shall not pro
oceed without formal approval by
y the appropriate
e inspection.
Contractor shall no
otify the COMPANY / PMC and ra aise RFI.

SS:
“W” - WITNES A point beyond which w
work may procee ed without formal documented appproval by any of
o the inspection..
Achievement of “W” points shall be notified
n to PMC in accordance with
w the contract.

LLANCE: A poin
"S" - SURVEIL nt where CPECC C and others may carry out surve eillance of work in progress and documentation
n
assoociated on an u
unscheduled bassis, with no notific
cation required by
b any party andd without
ameendment to the sscheduled produuction program.

“R” - REVIEW: The doccuments are to b


be submitted to the
t appropriate inspection
i for review by PMC. Note
N that where a
docuument is subjecct to CPECC/PM MC approval, worrk shall not proce C/PMC approval is
eed until CPECC
give
en.

REM
MARKS:

1
PR
ROVISION O
OF ENGINEE
ERING, PROC
CUREMENTT, CONSTRU
UCTION,
COMMISSIONINNG, OPERAT
TION AND MAINTENAN
M CE SERVICEE FOR GAS

CPECC PROV
VISION OF E
ENGINEERINNG, PROCUREMENT, CONSTRUCT
C TION, COMM
MISSIONING
G,
OPERATION N AND MAIN
NTENANCEE SERVICE FOR
F GAS PR
ROCESSING PLANT
SITE INSPECTION
I
DISCIPLINE:CIVIIL DE
ESCRIPTION O
OF WORK: CON
NCRETE WORK
KS HFY-3800-000
00-CIV-ITP-000
09
& TE EST PLAN
Datee: Prepared By:
B CPECC QC DEPARTMENT
T Approved By: CPECC QC
Q DEPARTME ENT
Item
m Inspecttion Activity andd Specific Acceptance Critteria, Veriffying RESPOONSIBILITY
ACTIVITY
Y
No. Check Point Arrea Code & Standard Docum ment CONTRACTOR OWNER
1 concrete
Construction drawings
1.1.1 Batcch Plant Qualification &
1.1 concrete C
Construction proceddures
Trial Mix Design( For eacch Concrete of civil engineerin
ng H R
material and
Grad)
mixing designn
H W
Construction drawings
1.1.2 Blinding Concrete annd Water
C
Construction proceddures
Proofing material
m shall connform to of civil engineerin
ng hecklist-3-2-
HFY-Ch
approved drawing
d and speecifications. 1
1 HFY-Ch
hecklist-3-2-
2 H W
1.2 formworkk Construction drawings
1.2.1 Spaccers, clean, alignn and level CR--C-05
C
Construction proceddures
formwork k edges shall conform latest of civil engineerin
ng
edition of approved drawinngs.

Construction drawings
1.2.2 Mateerials should bee approved W S
C
Construction proceddures
and are in good conditionss. of civil engineerin
ng

Defiinitions of Inspecction & Test plan


n Symbols: H -H
Hold W -Witness Point S –Surveeillance R –Review

2
PR
ROVISION O
OF ENGINEE
ERING, PROC
CUREMENTT, CONSTRU
UCTION,
COMMISSIONINNG, OPERAT
TION AND MAINTENAN
M CE SERVICEE FOR GAS

CPECC PROV
VISION OF E
ENGINEERINNG, PROCUREMENT, CONSTRUCT
C TION, COMM
MISSIONING
G,
OPERATION N AND MAIN
NTENANCEE SERVICE FOR
F GAS PR
ROCESSING PLANT
SITE INSPECTION
I
DISC
CIPLINE: CIVIL
L DESCRIP
PTION OF WOR
RK: CONCRETE
E HFY-3800-000
00-CIV-ITP-000
09
& TEEST PLAN
Datee: Prepared By:
B CPECC QC DEPARTMENT
T Approved By: CPECC QC
Q DEPARTME
ENT

Item
m Inspecttion Activity andd Specific Acceptance Critteria, Veriffying RESPO
ONSIBILITY
ACTIVITY
Y
No. Check Point Arrea Code & Standard Docum ment C
CONTRACTOR OWNER
    1.2.3 Rein
nforcement concrrete cover CConstruction drawin ngs
shall confo
form to approvedd drawings CConstruction proced dures W W
oof civil engineering
and speciffications.

1.2.4 Conttact surface betw


ween form- CConstruction drawin ngs W S
CConstruction proced dures HFY-Ch
hecklist-3-2-1
work and concrete shall bee smooth
ny deficiencies oor
without an
oof civil engineering HFY-Ch
hecklist-3-2-2
CR-C-05
unevennesss.

W S
1.2.5 Cleaan-out shall be avvailable on CConstruction drawin ngs
CConstruction proced dures
form-work k. oof civil engineering

1.2.6 Formmwork shall be ffirmly


supported and movement of form CConstruction drawin ngs H W
work shalll be avoided whiile casting CConstruction proced dures
oof civil engineering
concrete.

Defiinitions of Inspecction & Test plan


n Symbols: H -H
Hold W -Witness Point S -Surveeillance R –Review

3
PROV
VISION OF ENGIN
NEERING, PROCU
UREMENT, CONSTRUCTION, 
COM
MMISSIONING, OPERATION AN
ND MAINTENANCE SERVICE FOR
R GAS PROCESSING PLANT           
 

CPEC
CC PR
ROVISION O
OF ENGINEE
ERING, PROCUREMENTT, CONSTRU
UCTION, CO
OMMISSIONNING,
OPERATTION AND M
MAINTENANNCE SERVIC
CE FOR GAS
S PROCESSIN
NG PLANT
SIITE INSPECTIO
ON
DISCIPLINE:CIVIL DESC
CRIPTION OF W
WORK: CONCR
RETE WORKS HFY-3800
0-0000-CIV-ITP
P-0009
& TEST PLAN

Date: Prepaared By: CPECC QC DEPARTM


MENT App
proved By: CPECC QC DEPAR
RTMENT
Item Insspection Activityy and Specific Acceptancee Criteria, Verifying
V RE
ESPONSIBILITY
Y
ACTIIVITY
No. Check Poinnt Area Code & Standard D
Document CONTRACT
TOR OWN
NER
  1.2.7 Release agent ussed for form Construction drrawings W S
work shall conform too design Construction prrocedures
of civil engineeering
requirrements.

1.2.8 Debris shall be rremoved from Construction drrawings W S


formss. Construction prrocedures
of civil engineeering
1.3 Steeel bar 1.3.1 Steel bars providded by supplier Construction drrawings HFY
Y-Checklist-3-2-1
construcction shall conform
c to the reequirements of Construction prrocedures HFY
Y-Checklist-3-2-2 H W
designn drawings. of civil engineeering C
CR-C-05

1.3.2 Steel bar shall hhave correct


Construction drrawings
size, shape,
s spacers annd bent radius Construction prrocedures
H W
conforming to design requirements. of civil engineeering

1.3.3 Steel bar installaation shall be Construction drrawings


accordding to approvedd design Construction prrocedures H W
drawiings and shall bee firmly tied. of civil engineeering
Steel bar
b shall be suppported in an
approoved way.

Definitions of Innspection & Testt plan Symbols: H -Hold W -Witness Point


P S -S
Surveillance R –Review


 
PR
ROVISION O
OF ENGINEE
ERING, PROC
CUREMENTT, CONSTRU
UCTION,
COMMISSIONINNG, OPERAT
TION AND MAINTENAN
M CE SERVICEE FOR GAS

CPEC
CC PR
ROVISION O
OF ENGINEE
ERING, PROCUREMENTT, CONSTRU
UCTION, CO
OMMISSIONNING,
OPERATTION AND M
MAINTENANNCE SERVIC
CE FOR GAS
S PROCESSIN
NG PLANT
SIITE INSPECTIO
ON
DISCIPLINE:CIVIL DESC
CRIPTION OF W
WORK: CONCR
RETE WORKS HFY-3800
0-0000-CIV-ITP
P-0009
& TEST PLAN

Date: Prepaared By: CPECC QC DEPARTM


MENT App
proved By: CPECC QC DEPAR
RTMENT
Item Insspection Activityy and Specific Acceptancee Criteria, V
Verifying RE
ESPONSIBILITY
Y
ACTIIVITY
No. Check Poinnt Area Code & Standard Document
D CONTRACTOR
R OWN
NER
  1.3.4 All embeddeed items shaall Construction drrawings H W
confoorm to the requirrements of desiggn Construction prrocedures
of civil engineeering
drawiings, and shall be checked annd
approoved.

Construction drrawings HFY


Y-Checklist-3-2-1
1.4.1 Concrete grade aand Slump, H W
1.4 Conncrete tempeerature & vibration shall
Construction prrocedures HFY
Y-Checklist-3-2-2
of civil engineeering HFY
Y-Checklist-3-2-3
Pouringg and conform the approvedd drawing and
CR-C-05
Cube Caasting speciffication.

1.4.2 The size, elevatiion &


coorddinates of Anchorr Bolts & Construction drrawings
Embeedded items instaallation shall Construction prrocedures
conform the drawing and of civil engineeering H W
speciffication.

Definitions of Innspection & Testt plan Symbols: H -Hold W -Witness Point


P S -S
Surveillance R –Review

5
PR
ROVISION O
OF ENGINEE
ERING, PROC
CUREMENTT, CONSTRU
UCTION,
COMMISSIONINNG, OPERAT
TION AND MAINTENAN
M CE SERVICEE FOR GAS

CPEC
CC PR
ROVISION O
OF ENGINEE
ERING, PROCUREMENTT, CONSTRU
UCTION, CO
OMMISSIONNING,
OPERATTION AND M
MAINTENANNCE SERVIC
CE FOR GAS
S PROCESSIN
NG PLANT
SIITE INSPECTIO
ON
DISCIPLINE:CIVIL DESC
CRIPTION OF W
WORK: CONCR
RETE WORKS HFY-3800
0-0000-CIV-ITP
P-0009
& TEST PLAN

Date: Prepaared By: CPECC QC DEPARTM


MENT App
proved By: CPECC QC DEPAR
RTMENT
Item Insspection Activityy and Specific Acceptancee Criteria, V
Verifying RE
ESPONSIBILITY
Y
ACTIIVITY
No. Check Poinnt Area Code & Standard Document
D CONTRACTOR
R OWN
NER
  1.4.3 During concretee pouring, Construction drrawings H W
concrete cube specimeens should be Construction prrocedures
of civil engineeering
preparred on site.

1.4.4 To complete thee preparation of Construction drrawings


Construction prrocedures HFY
Y-Checklist-3-2-1
specim
mens and tests, ccompressive W S
streng
gth shall be tested with cube
of civil engineeering HFY
Y-Checklist-3-2-2
specim
mens.

1.4.5 It is not allow too adding water Construction drrawings


Construction prrocedures
to conncrete to change its slump on of civil engineeering
W W
site.
 

1.4.6 Concr ete shall bbe placed with Construction drrawings


propeer equipment andd pouring Construction prrocedures
of civil engineeering
W W
heightts shall be according to
speciffied requirementts.

Definitions of Innspection & Testt plan Symbols: H -Hold W -Witness Point


P S -S
Surveillance R –Review

6
PR
ROVISION O
OF ENGINEE
ERING, PROC
CUREMENTT, CONSTRU
UCTION,
COMMISSIONINNG, OPERAT
TION AND MAINTENAN
M CE SERVICEE FOR GAS

PR
ROVISION O
OF ENGINEE
ERING, PROCUREMENTT, CONSTRU
UCTION, CO
OMMISSIONNING,
OPERATTION AND M
MAINTENANNCE SERVIC
CE FOR GAS
S PROCESSIN
NG PLANT
CPEC
CC SIITE INSPECTIO
ON
DISCIPLINE:CIVIL DESC
CRIPTION OF W
WORK: CONCR
RETE WORKS HFY-3800
0-0000-CIV-ITP
P-0009
& TEST PLAN

Date: Prepaared By: CPECC QC DEPARTM


MENT App
proved By: CPECC QC DEPAR
RTMENT
Item Insspection Activityy and Specific Acceptancee Criteria, V
Verifying RE
ESPONSIBILITY
Y
ACTIIVITY
No. Check Poinnt Area Code & Standard Document
D CONTRACTOR
R OWN
NER
  1.4.7 Concrete vibratiion shall be Construction drrawings W S
perforrmed in accordannce with Construction prrocedures
of civil engineeering
constrruction specificaation and design
requirrements.

1.4.8 Concrete shall bbe cured with Construction drrawings W S


Construction prrocedures HFY
Y-Checklist-3-2-1
methoods required by ccontract. curing of civil engineeering HFY
Y-Checklist-3-2-2
for 7 days.
d
CL--C-01

1.5 1.5.1 Underground ppart of concrette Construction drrawings


Construction prrocedures
H S
Foundattion shall be
b painted bitum
men anticorrosioon of civil engineeering
Coatingg layer.

Definitions of Innspection & Testt plan Symbols: H -Hold W -Witness Point


P S -S
Surveillance R –Review

7
PROV
VISION OF E
ENGINEERI NG, PROCU
UREMENT, CCONSTRUCTTION, 
COMM
MISSIONING, OPERATIO
ON AND MAAINTENANC ROCESSING
CE SERVICE FOR GAS PR G PLANT           
 


 
PROV
VISION OF E
ENGINEERI NG, PROCU
UREMENT, CCONSTRUCTTION, 
COMM
MISSIONING, OPERATIO
ON AND MAAINTENANC ROCESSING
CE SERVICE FOR GAS PR G PLANT           
 


 
PROV
VISION OF E
ENGINEERI NG, PROCU
UREMENT, CCONSTRUCTTION, 
COMM
MISSIONING, OPERATIO
ON AND MAAINTENANC ROCESSING
CE SERVICE FOR GAS PR G PLANT           
 

10 
 
PROV
VISION OF E
ENGINEERI NG, PROCU
UREMENT, CCONSTRUCTTION, 
COMM
MISSIONING, OPERATIO
ON AND MAAINTENANC ROCESSING
CE SERVICE FOR GAS PR G PLANT           
 

11 
 
PROV
VISION OF E
ENGINEERI NG, PROCU
UREMENT, CCONSTRUCTTION, 
COMM
MISSIONING, OPERATIO
ON AND MAAINTENANC ROCESSING
CE SERVICE FOR GAS PR G PLANT           
 
Check List of Foundattion Coating
g
CL-C-0
01

Project No:
N Reccord No.:
Job Name: Loocation:
Drawing No.: D
Date:2017.10
0.06

ITTEM  ACTIVITY YES  NO 

Beffore the consstruction, th e first grass on the surface of the     
1  graay skin with a move, with aa broom to dust, sand 
a knife to rem
andd other debrris clean.  

If o
oil, apply wire
e brush and  sandpaper to brush off.      
2  Thee base surfacce must be fllat, the deprression shoulld be filled 
witth cement puutty. 

Whhen painted bitumen, thee temperature of concrete surface     

sh
hould be satisfy vendor rrequest. 

4  Antti‐coating without a drum
m, cracking, Alice and oth
her defects.     

REM
MARKS: 

  Contractor PMC E ngineer 

Nam
me      

Signature      

Datee      

12 
 